Attachment_1_Task_Order_0001_PWS.docx

DOCX document 97 KB Posted

Attached to
Joint Effects Model (JEM)
Solicitation number
W911SR17R0002
Issued by

About this file

Attachment 1_Task Order 0001 PWS

View the file

Other files

File Type Posted
Attachment_4__Excel_Cost_Proposal_Template_9_NOV_16.xlsx XLSX spreadsheet
Exhibit_A_DD_Form_1423 _Contract_Data_Requirements_List_(CDRL).docx DOCX document
W911SR-17-R-0002-0001.pdf PDF
Attachment_12_JEM_Questions_and_Answers_Q As.pdf PDF
Attachment_3_Past_Performance_Questionnaire.docx DOCX document
Exhibit_A_DD_Form_1423 _Contract_Data_Requirements_List_(CDRL).docx DOCX document
W911SR-17-R-0002.pdf PDF
Attachment_6__ProjectForge_Access_Request_Form_and_Non-Disclosure_Agreement.docx DOCX document
Attachment_8_DD254_Contract_Security_Specification.pdf PDF
W911SR_17_R_0002_Questions.xlsx XLSX spreadsheet
Attachment_4__Excel_Cost_Proposal_Template.xlsx XLSX spreadsheet
Attachment_11__Excel_Uncosted_Proposal_Template.xlsx XLSX spreadsheet
Attachment_2_Award_Fee_Plan_26JUL16.doc DOC document
Attachment_1_Task_Order_0001_PWS.docx DOCX document
Attachment_10_Facility_Clearance_(FCL)_Request_OCT15.pdf PDF
Attachment_5_Defined_Labor_Categories.xlsx XLSX spreadsheet
Attachment_9_Joint_Program_Executive_Office_For_Chemical_and_Biological_Defense_(JPEO-CBD)_Critical_Information_List_(CIL).pdf PDF
Attachment_11__Excel_Uncosted_Proposal_Template.xlsx XLSX spreadsheet
Attachment_9_Joint_Program_Executive_Office_For_Chemical_and_Biological_Defense_(JPEO-CBD)_Critical_Information_List_(CIL).pdf PDF
Attachment_4__Excel_Cost_Proposal_Template.xlsx XLSX spreadsheet
W911SR-17-R-0002.pdf PDF
Attachment_6__ProjectForge_Access_Request_Form_and_Non-Disclosure_Agreement.docx DOCX document
Attachment_5_Defined_Labor_Categories.xlsx XLSX spreadsheet
Attachment_2_Award_Fee_Plan_26JUL16.doc DOC document
W911SR_17_R_0002_Questions.xlsx XLSX spreadsheet
Exhibit_A_DD_Form_1423,_Contract_Data_Requirements_List_(CDRL).docx DOCX document
Attachment_3_Past_Performance_Questionnaire.docx DOCX document
Attachment_8_DD254_Contract_Security_Specification.pdf PDF
Attachment_10_Facility_Clearance_(FCL)_Request_OCT15.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement for Task Order 0001: Joint Effects Model

C.1.0 SCOPE

The scope of this effort includes development and integration of new capability as well as upgrade, modernization and sustainment of existing capability for the Joint Effects Model (JEM).

C.1.1 Background The current JEM capability is developed and fielded in two increments, which will be managed under one JEM contract as two separate baselines with a significant amount of common code.

C.1.1.1 JEM Increment 1 (Incr 1) JEM Increment 1 (Incr 1) is based on requirements contained in the JEM Operational Requirements Document (ORD) approved in May 2004 by the Joint Requirements Oversight Council (JROC). The JEM acquisition began under the Requirements Generation System and was switched to the Joint Capabilities Integration Development System (JCIDS). The JEM ORD describes the JEM incremental development strategy and contains the requirements for all three planned JEM increments. The JEM Incr 1 Capability Production Document (CPD) was approved in January 2007. The JEM Incr 1 Standalone variant attained Full Rate Production (FRP) in May 2008. The JEM Incr 1 Command and Control (C2) variant received its Full Deployment Decision (FDD) in June 2010. JEM Incr 1 fielding, which began in 2008, includes Foreign Military Sales (FMS) to allied government militaries.

C.1.1.2 JEM Increment 2 (Incr 2) JEM Incr 2 is fielded under the JCIDS Information Technology Box (IT-Box) Construct. The Information Systems Initial Capability Document (IS ICD) was approved by the JROC in June 2014. The JEM Incr 2 program achieved approval for Build Decision 1 in September 2014 and began a limited fielding of the standalone product in the 2QFY16. Under the JEM IT-Box, requirements documents have been divided into five Requirements Definition Packages (RDPs). JEM Incr 2 may include up to five (5) RDPs. JEM RDP 1 and JEM RDP 2 are currently under development. [For reference only: JEM RDP 1 - Baseline Capabilities (document approved by Protection Functional Capability Board). JEM RDP 2 – Command and Control (C2) Integration. JEM RDP 3 - Analytical Support. JEM RDP 4 – Emerging Science and Technology Capabilities. JEM RDP 5 - Modernization and Sustainment.] C.1.2 Objective The objective of this contract is the development and integration of new capability as well as the upgrade, modernization and sustainment of JEM software, leveraging reusable code across the multiple baselines. This Task Order will merge two separate software versions that are being modernized and developed.

C.2.0 APPLICABLE DOCUMENTS (Table 1) The Government will use Project Forge https://project.forge.mil/sf/projects/jem-follow-on to host documents listed in C.9.0 that don’t have a URL and are not available on the web. For the purposes of this Performance Work Statement (PWS), “Required”, as it applies to this paragraph, means that the requirements contained in the directly cited document are contractually applicable to the extent specified. If a document reference does not indicate the specific paragraph as being applicable, then the document is applicable in its entirety. The term “For guidance only” means the document is not contractually applicable and is provided for guidance and information only. The documents cited in Table 1 are “required” unless specifically identified as “for guidance only”. In the event of a conflict between the documents referenced herein and the contents of this PWS, the PWS shall take precedence.

C.3.0 REQUIREMENTS

The Contractor, as an independent Contractor and not as an agent of the Government, shall furnish the necessary resources (except those specifically designated as Government-furnished) to perform the following work.

C.3.1 Software Engineering C.3.1.1 Software Development and Technical Documentation Research Development Test and Evaluation (RDT&E) C.3.1.1.1 JEM Common System Allocated Baseline Software Requirements Acceptable JEM software shall meet the following requirements:

a. The Contractor shall develop, adapt and modernize software that meets the requirements as defined in the JEM Performance Specification (PSPEC), PRF JPM-IS-001.

b. The Contractor shall develop, adapt and modernize the JEM application modeling framework to:

i. Allow multiple components to collaborate on the execution of a Chemical, Biological, Radiological, and Nuclear (CBRN) scenario and generate applicable output products.

ii. Provide a scalable modeling architecture suitable for a single user as well as cloud based multi-user support.

iii. Provide efficient integration of new or updated components.

c. The Contractor shall maximize reuse of software source code across allocated baselines.

d. The Contractor shall develop, adapt and modernize a scalable web application, in which the software:

i. Allows for a user to be authenticated.

ii. Allows for concurrent multi-user functionality.

iii. Provides for efficient integration of new or updated components.

iv. Supports Ozone Widget Framework (OWF) and inter-widget communication with Joint Warning and Reporting Network (JWARN), Command and Control (C2), and other CBRN Community of Interests (COI) widgets.

e. The Contractor shall develop, adapt and modernize a stand-alone local client installed application with similar capabilities as the web application that:

i. Provides users continued access to JEM2 functionality that does not rely on internet/network connectivity.

ii. Allows for single user concurrent modeling functionality.

iii. Provides for efficient integration of new or updated components.

iv. Supports Ozone Widget Framework (OWF) and inter-widget communication with Joint Warning and Reporting Network (JWARN), Command and Control (C2), and other CBRN Community of Interests (COI) widgets.

f. The Contractor shall develop, adapt and modernize JEM CBRN modeling web services that:

i. Support information sharing among the CBRN communities.

ii. Represent the interests of the COI to other domains and COIs.

iii. Support backward compatibility with fielded versions of JWARN.

g. The Contractor shall develop, adapt and modernize CBRN hazard plots and legends that can be shared with Command and Control (C2) systems and exported to other formats such as ArcGIS Desktop, and Google mapping tools as defined in the JEM PSPEC.

h. The Contractor shall develop, adapt and modernize software that can operate on multiple hardware and operating systems as required; currently, JEM can be run on Windows, Solaris and Linux operating systems.

i. The Contractor shall develop, adapt and modernize software that complies with the Net-Ready Key Performance Parameter (NR-KPP) as defined in the Net-Ready Key Performance Parameter (NR-KPP) per the Chairman of the Joint Chiefs of Staff Instruction (CJCSI) 6212.01F.

j. The Contractor shall develop, adapt and modernize software that complies with communication and software standards, as defined in the JEM DoD Architecture Framework (DoDAF) Standard View (StdV)-1 and the Global Information Grid (GIG) Technical Guidance Federation (GTG-F).

C.3.1.1.2 JEM 2.0 System Allocated Baseline Software Requirements.

Acceptable JEM 2.0 software shall meet the following additional requirements:

a. The Contractor shall develop, adapt and modernize the modeling related software components to ensure that they are Common CBRN Model Interface (CCMI) compliant and compatible with the CCMI guidance and related blueprints as described in JEM Common Chemical, Biological, Radiological, and Nuclear (CBRN) Model Interface (CCMI) Guidance Documentation.

b. The Contractor shall develop, adapt and modernize the modeling software components to ensure they can run within the CCMI Auto-generated Test Toolkit (CATT).

c. The Contractor shall ensure sufficient modeling software component test coverage as described in the CCMI guidance in accordance with (IAW) ELIN A021.

d. The Contractor shall execute and document verification and validation tests and the results thereof and must provide the tests both as CATT runnable scenarios and, wherever possible, as JEM 2.0 problem set exports IAW ELIN A022.

C.3.1.2 JEM Incremental Capability Requirements (RDT&E) As part of JEM modernization, the Contractor shall conduct development support on the following integration efforts IAW the PWS.

C.3.1.2.1 CBRN IS Integration Not applicable to this task order.

C.3.1.2.2 JWARN Integration Not applicable to this task order.

C.3.1.2.3 Bio-Surveillance Portal Integration Not applicable to this task order.

C.3.1.2.4 Science and Technology Transition and Integration Not applicable to this task order.

C.3.1.3 Fielded System Upgrade and Modernization (RDT&E) C.3.1.3.1 Fielded System Upgrade Support The Contractor shall upgrade and modernize the fielded JEM software product. Software upgrades shall be performed in accordance with the most recent product baseline established by and approved by the Government.

C.3.1.3.2 Government Configuration Management System Support The Contractor shall follow all procedures in JPM IS SOPs listed in paragraph C.9.0 Applicable Documents. The Contractor shall participate in a weekly Configuration Control Board (CCB) SOP 12 teleconference facilitated by the Government.

C.3.1.4 Program Change Report (PCR) Process Support (RDT&E) In adherence with the overarching JPM IS Configuration Management effort, the Contractor shall support the Program Change Report (PCR) Change Control Process, per the JPM IS SOP 10.

C.3.1.5 Software Delivery (RDT&E) In delivering the software, the Contractor shall adhere to the JPM IS Software Deliveries Process, SOP 31 (20 May 2015).

C.3.1.5.1 Formal In-Cycle Deliveries The Contractor shall make Formal In-Cycle Deliveries to include delivery of Software Items and Technical Documentation. In-cycle deliveries are tied to Government milestone events such as formal Testing and Evaluation leading to Fielding Decisions.

C.3.1.5.1.1 Formal in-cycle deliveries shall include all components of the software, even if no changes have been made to specific components.

C.3.1.5.1.2 As part of a Formal In-Cycle Delivery, the Contractor shall create and deliver the following software and technical documentation:

C.3.1.5.1.2.1 The Contractor shall prepare Software Product Specification (SPS), IAW ELIN A008.

C.3.1.5.1.2.2 The Contractor shall prepare Software Version Description (SVD), IAW ELIN A011.

C.3.1.5.1.2.3 The Contractor shall prepare Software Test Description (STD), IAW ELIN A016.

C.3.1.5.1.2.4 The Contractor shall prepare STR as a record of the testing performed on a Computer Software Configuration Item (CSCI), a software system or subsystem, or other software-related item, IAW ELIN A018.

C.3.1.5.1.2.5 The Contractor shall prepare System Administrator Manual (SAM) IAW ELIN A014.

C.3.1.5.1.2.6 The Contractor shall prepare Software User Manual (SUM) IAW ELIN A015.

C.3.1.5.1.2.7 The Contractor shall prepare Software Resources Data Reporting (SRDR) IAW ELIN A006.

C.3.1.5.2 Technical Document Changes The Contractor shall when required provide updates to the following JEM technical documentation due to changes in the software to maintain the accuracy of the document as set forth below:

C.3.1.5.2.1 The Contractor shall prepare Interface Design Document (IDD) IAW ELIN A012.

C.3.1.5.2.2 The Contractor shall prepare Software Programmer’s Guide (SPG) IAW ELIN A013.

C.3.1.5.2.3 The Contractor shall prepare Engineering Notebooks (ENs) IAW ELIN A020.

C.3.1.5.3 Baseline Management The Contractor shall maintain the currency and accuracy of the allocated and product baselines. The Contractor shall establish and follow definitive processes that identify how the baseline will be managed or maintained.

C.3.1.5.3.1 Baseline Traceability The Contractor shall maintain documented traceability between the functional, allocated, and product baselines for all software items. Traceability shall include all derived component-level requirements, including those typically included in a separate Software Requirements Specification (SRS), and shall provide forward and backward traceability between all requirements, system components, and associated design documentation (e.g. IDD, SDD, Detail Specs). Traceability shall also include rationale and heritage information via inclusion of Requirement ID, Rationale, Traced From and Owner metadata as detailed in MIL-HDBK-520A Table I, as well as documentation of (or direct links to documentation of) all historical approved changes to the Contractor-managed requirements.

C.3.1.5.3.2 The Contractor shall prepare Software Requirements Specification (SRS) IAW ELIN A009.

C.3.1.5.3.3 Software Allocation The Contractor shall categorize all software as application software and support software categories. Each category shall comprise a Computer Software Configuration Item (CSCI) and may further be subdivided into smaller CSCIs if the CSCI is complex, e.g., functional, allocated and product baselines. The product baseline items could be further broken down into developmental, test and production software baselines. The CSCIs shall be documented in detail in the Software Design Description (SDD). The Contractor shall deliver a SDD for JEM that details the design descriptions of the computer software configuration items, database design descriptions, interfaces among the software units/segments, etc. CSCIs shall be uniquely named and/or numbered and identify the functional characteristics (for example, its purpose and use) and physical characteristics. CSCIs will include the JEM and products that are used in the development of JEM that should be controlled. The Contractor shall prepare and submit the SDD IAW ELIN A010.

C.3.1.5.4 Formal Out-of-Cycle Deliveries The Contractor shall provide a software upgrade to fix each designated high priority 1 and 2 PCR(s) and also correct the corresponding technical documentation. Typically, a patch will include only those files that have been changed and can be installed over the top of an existing program, but this will depend on the nature of the patch and the detailed instructions as provided by the Government.

C.3.1.5.4.1 As part of a Formal Out-of-Cycle Delivery, the Contractor shall prepare and deliver the following software and technical documentation. In addition, during contract performance, the Contractor shall perform updates for the same software and technical documentation:

C.3.1.5.4.1.1 The Contractor shall prepare Software Product Specification (SPS), IAW ELIN A008.

C.3.1.5.4.1.2 The Contractor shall prepare Software Version Description (SVD), IAW ELIN A011.

C.3.1.5.4.1.3 The Contractor shall prepare Software Test Description (STD), IAW ELIN A016.

C.3.1.5.4.1.4 The Contractor shall prepare Software Test Report (STR), IAW ELIN A018.

C.3.1.5.5 Technical Document Changes – Software The Contractor shall provide updates to the following JEM technical documentation due to changes in the software to maintain the accuracy of the document:

C.3.1.5.5.1 The Contractor shall prepare Engineering Notebooks (ENs) IAW ELIN A020.

C.3.1.5.5.2 The Contractor shall prepare System Administrator Manual (SAM) IAW ELIN A014.

C.3.1.5.5.3 The Contractor shall prepare Software User Manual (SUM) IAW ELIN A015.

C.3.1.5.5.4 The Contractor shall prepare Interface Design Document (IDD) IAW ELIN A012.

C.3.1.5.6 Engineering Delivery The Contractor shall provide Engineering Deliveries at the request of the Government at a regular or irregular cycle to support testing, review and in-progress Government feedback. These deliveries will be requested to support the program development effort to meet emerging requirements, and integration efforts. In general, Engineering Deliveries are not fielded.

C.3.1.5.6.1 Engineering Delivery Documentation As part of an Engineering Delivery, the Contractor shall prepare and deliver the following software and technical documentation. In addition, during contract performance, the Contractor shall perform updates for the same software and technical documentation:

C.3.1.5.6.1.1 The Contractor shall prepare Software Version Description (SVD), IAW ELIN A011.

C.3.1.5.6.2 Software Change Documentation The Contractor shall prepare the following JEM technical documentation when software changes make document updates necessary to maintain the accuracy of the documents:

C.3.1.5.6.2.1 The Contractor shall prepare System Administrator Manual (SAM) IAW ELIN A014.

C.3.1.5.6.2.2 The Contractor shall prepare Software User Manual (SUM) IAW ELIN A015.

C.3.1.5.6.2.3 The Contractor shall prepare Interface Design Document (IDD) IAW ELIN A012.

C.3.1.5.7 Informal Engineering Delivery The Contractor shall provide Informal Engineering Deliveries at the request of the Government for prototyping of new capability, and early integration and interoperability testing. Informal feedback will include emails, meetings, and discussions to reduce risk in the development process. Informal Engineering Deliveries will not be tracked in the Government configuration management system. All documentation delivered with an Informal Engineering Delivery will be considered to be drafts. At all Informal Engineering Deliveries, the Contractor shall prepare draft versions of documents upon the request of the Government when scheduling the delivery.

C.3.1.6 Cybersecurity (RDT&E) The Contractor shall deliver software that is secure and able to be accredited for use on service and joint networks. The Contractor shall ensure that security requirements are addressed in software design and development. The Contractor shall conduct security scans, monitor emerging DISA Information Assurance Vulnerability Management (IAVM) notifications, document vulnerabilities, correct vulnerabilities, and document the resolution or mitigation of vulnerabilities in conjunction with JPM IS SOP 37 and IAW JPM IS SOP 10. The Contractor shall support the Government’s effort to accomplish JEM cybersecurity accreditation by assessing the validity of vulnerabilities identified during formal Government accreditation testing, recommending corrective actions to resolve or mitigate vulnerabilities, and estimating the level of effort and time required to resolve valid vulnerabilities IAW JPM IS SOP 10.

C.3.1.6.1 Maintain Cybersecurity Baseline Integrity The Contractor shall demonstrate compliance with the DoD Instructions 8500.01 (Cybersecurity) and 8510.01 (Risk Management Framework (RMF) for DoD Information Technology (IT), the Contractor shall ensure that the addition of software developed under this PWS does not compromise the security posture of the JEM software. Any Category 1 and Category 2 findings shall be considered a compromise of the security posture of the JEM software. Category definitions shall be governed by DoDI 8510.01, the DISA Information Assurance Vulnerability Management process, and DISA benchmarks for the JEM software, and DISA Security Technical Implementation Guides (STIGs) and Security Requirements Guides (SRGs).

C.3.1.6.2 Cybersecurity Implementation Plan The Contractor shall implement Government IA strategies and a Government validation plan consistent with JEM’s DIACAP Implementation Plan (DIP).

C.3.1.6.3 Cybersecurity Control Testing and Validation The Contractor shall demonstrate compliance with the applicable Cybersecurity controls through performance of a Contractor Cybersecurity Self-Assessment. The Contractor shall evaluate each software end-item against the applicable Security Technical Implementation Guides (STIGs) or checklists as provided in the DIP. Additionally, for STIGs or checklists that are supported by DISA approved software automated test tools, the Contractor shall deliver the test reports generated by the test tools. The Contractor shall deliver test reports for STIGs or checklists supported by automated test tools IAW ELIN A019, Information Assurance Test Tool Reports (IATTRs).

C.3.1.7 System Test and Evaluation (RDT&E) The Contractor shall conduct or support system test and evaluation as defined below.

C.3.1.7.1 On-Going Developmental Test and Evaluation Support The Contractor shall support the Government with any on-going Developmental Testing (DT) consistent with JEM’s Integrated Master Schedule (IMS). On-going DT events shall include a comprehensive evaluation to ensure the system meets all specifications and operational requirements as defined in the current Test and Evaluation Master Plan (TEMP). Upon Government request, the Contractor’s on-going DT support may also include technical Subject Matter Expert (SME) support during test events, resolution of SPR deficiencies, and systems operation and sustainment during DT&E events in order to achieve Government acceptance of the Contractor’s delivered product. The Contractor shall provide on-site technical support for DT. Any deficiencies identified by the Government during on-going DT shall be resolved by the Contractor in accordance with the JPM IS Program Change Report (PCR) Change Control Process, SOP 10.

For proposal purposes only, the JEM program estimates one (1) Follow-on Test & Evaluation (FOT&E) event each year, requiring one (1) SME to travel to Joint Base Lewis McChord, Washington an operational site location for three (3) days to provide onsite T&E support.

C.3.1.7.2 Independent Operational Test and Evaluation Support The Contractor shall support the Government with Independent Operational Test & Evaluation (IOT&E). IOT&E support will include Contractor technical subject matter expert (SME) support, resolution of SPR deficiencies, and on-site IOT&E support at a Government system site location.

C.3.1.7.3 Follow-on Operational Test and Evaluation Support The Contractor shall support the Government with Follow-on Operational Test & Evaluation (FOT&E). FOT&E support will include Contractor technical subject matter expert (SME) support, resolution of SPR deficiencies, and on-site FOT&E support at a Government system site location.

C.3.1.8 Materials and Equipment (RDT&E) As required and as approved by the Government, the Contractor shall purchase materials and equipment under the performance of this Contract. Any materials and equipment purchased for the performance of this task order shall be submitted to the Government.

C.3.2 Program Management (RDT&E, PROC, FMS) (O&M OPTION) The Contractor shall provide program management support to plan and execute all work required under this PWS and Contract Data Requirement List (CDRLs). The Contractor shall ensure all work conducted under this PWS is planned and executed in a manner that will achieve cost, schedule, and performance objectives. The Contractor shall provide the Government with Conference Agendas, Reports and Record of Meeting / Minutes IAW ELIN A023. The Contractor shall use the COR as the initial Point of Contact (POC). However, only the Contracting Officer has the authority to make changes to this contract.

C.3.2.1 Contract Work Breakdown Structure The Contractor’s cost and performance management approach shall be documented in a Contract Work Breakdown Structure (CWBS). The CWBS shall be created in accordance with MIL-HDBK-881 and shall contain detail commensurate with the work to be performed under this PWS. The CWBS will be revised post award. The Contractor shall prepare and deliver to the Government a Contract Work Breakdown Structure (CWBS) IAW ELIN A002.

C.3.2.2 New Development (RDT&E) C.3.2.2.1 Systems Engineering The Contractor shall establish and maintain a Systems Engineering (SE) program IAW the Government Systems Engineering Plan (SEP). The Contractor shall prepare and deliver to the Government a Systems Engineering Management Plan (SEMP) that shall be approved by the Government IAW ELIN A003. The Contractor shall also consider software and network-ready requirements when developing the SEMP. The approved SEMP shall serve as the baseline for all Contractor systems engineering activities.

C.3.2.2.2 Software Development Approach The Contractor shall define and document an Agile software development approach, including tools used to facilitate a development process, which is appropriate for the work to be performed under this PWS and the IT Box construct, and delivers an incrementally developed field-able product. The Contractor shall document this approach in a Software Development Plan (SDP) consistent with the terms of this PWS and IAW ELIN A004, and in an Agile Software Metrics Report (ASMR) IAW ELIN A024. The Contractor shall perform all applicable work in accordance with the Contractor’s Government-approved SDP. The Contractor shall ensure that the components developed do not contain any US-only information that cannot be shared with partner nations as part of an FMS case.

C.3.2.2.3 Software Test Plan The Contractor shall prepare and deliver a Software Test Plan (STP) that describes the plans for testing of Computer Software Configuration Items (CSCIs), software system or subsystem, or other software-related items, IAW ELIN A017.

C.3.2.3 Exercise and Demonstration Support (RDT&E)

The Contractor shall provide technical and engineering expertise to demonstrate the JEM system.

C.3.2.4 Meetings and Reviews (RDT&E) C.3.2.4.1 Start of Work Meeting The Contractor shall attend a Post Award Meeting with the Government Program Office and contracting representatives. The Post Award Meeting will be scheduled by the Procurement Contracting Officer (PCO) in conjunction with the Program Office within 30 days after contract award. The Post Award Meeting will be held at SPAWAR San Diego, CA.

C.3.2.4.2 Periodic Work Planning and Scheduling Meetings The Contractor shall participate in Periodic Work Planning and Scheduling Meetings with the Government Program Office and Government Contracting Representatives. The first Periodic Work Planning and Scheduling Meeting will be scheduled by the Program Office within 30 days of contract award. Periodic Work Planning and Scheduling Meetings may be held in conjunction with other meetings and reviews or scheduled independently no less than six (6) months apart. Depending on the content to be discussed and resolved, the Work Planning and Scheduling Meeting may be held at SPAWAR San Diego (CA), the Contractor's facility, or via teleconference. The understanding and commitments agreed upon during the Periodic Work Planning and Scheduling Meetings, or specific clarification initiated by the Government to the Contractor, will be detailed in a Technical Instruction (TI) provided to the Contractor by the Government. A TI template is provided by reference in Other Government Documents, C.9.7.

C.3.2.4.3 In Process Review (IPR) The Contractor shall attend program status updates at annual In Process Reviews (IPRs) in or around San Diego, CA at a Government facility. Upon the Government’s request, additional IPRs may be scheduled if critical issues arise or significant events or changes occur. In preparation of any IPR, the Contractor shall provide briefing material and presentation slides IAW ELIN A001.

C.3.2.4.4 Technical Interchange Meeting (TIM) The Contractor shall conduct a TIM via teleconference on a weekly basis to discuss technical questions/concerns with the Government. In accordance with CDRL A023 the Contractor shall provide meeting minutes that describes the items discussed as well as any resultant Government or Contractor actions from the TIM.

C.3.2.5 Reporting (RDT&E) C.3.2.5.1 Monthly Status Report On a monthly basis, the Contractor shall deliver a Monthly Status Report (MSR) that briefly discusses upcoming meetings, deliveries, travel, activities accomplished, plan for the next month, new issues, and current issues. The Contractor shall provide all monthly status reports IAW ELIN A005.

C.3.2.5.2 Integrated Master Schedule Report Within the IMS, the Contractor shall describe the planned events and milestones, activities, and exit criteria, which shall directly relate to specific accomplishments. The Contractor shall provide traceability of all critical or high risk tasks.

C.3.2.5.3 Integrated Master Plan / Integrated Master Schedule (IMP/IMS) The Contractor shall develop and deliver the IMP and IMS, IAW the DoD IMP and IMS Preparation and User Guide. The IMP shall show the sequence of the Contractor’s planned effort to complete all items listed in this PWS. The IMP shall provide a hierarchical, event-based plan that contains the following: events, significant accomplishments, and entry and exit criteria. The IMP shall not include any dates or durations. Both the IMP and IMS shall be delivered IAW ELIN A007. The Contractor’s IMS shall be based on major dates and timeframes included in the solicitation.

C.3.2.6 Performance Requirements Operations & Maintenance (O&M) [OPTION] C.3.2.6.1 Program Management – Sustainment Support The Contractor shall manage sustainment support efforts to ensure life cycle support for all fielded JEM systems.

C.3.2.6.1.1 Periodic Work Planning and Scheduling Meetings The Contractor shall participate in Periodic Work Planning and Scheduling Meetings with the Government Program Office and Government Contracting Representatives. The first Periodic Work Planning and Scheduling Meeting will be scheduled by the Program Office within 30 days of contract award. Periodic Work Planning and Scheduling Meetings may be held in conjunction with other meetings and reviews or scheduled independently no less than six (6) months apart. Depending on the content to be discussed and resolved, the Work Planning and Scheduling Meeting may be held at SPAWAR San Diego (CA), the Contractor's facility, or via teleconference. The understanding and commitments agreed upon during the Periodic Work Planning and Scheduling Meetings, or specific clarification initiated by the Government to the Contractor, will be detailed in a Technical Instruction (TI) provided to the Contractor by the Government. A TI template is provided by reference in Other Government Documents, C.9.7.

C.3.2.6.1.2 Monthly Status Report The Contractor shall provide all monthly status reports IAW ELIN A005.

C.3.2.6.1.3 Integrated Master Schedule Report The Contractor shall provide all monthly status reports IAW ELIN A007.

C.3.2.6.2 Configuration Management (O&M) Configuration Management (CM). The Contractor shall document their CM processes and procedures in a Configuration Management Plan (CMP) that shall maintain the integrity of the configuration items, Standard Operating Procedures and shall be delivered IAW ELIN A025. The CMP shall serve as the baseline for all configuration management activities, including all changes to technical data. The Contractor shall implement and maintain the Government-approved CMP and provide revisions IAW ELIN A025.

C.3.2.6.3 Fielded System Sustainment Support The Contractor shall provide the fielded product sustainment support of the JEM software. Software updates shall be performed in accordance with the most recent product baseline established by and approved by the Government. In accordance with JPM IS SOP 10 the Contractor shall use the JPM IS database to:

1)Review and provide input to Government-developed Change Requests.
2)Develop Change Requests.
3)Review and provide input to system configuration.
4)Review and provide input to software load procedures.
5)Review and provide input to production and installation drawings and documentation.
6)Review and provide input to System problem resolution.
7)Review and provide input to pre-installation check out procedure.
8)Provide input to version configuration required for proper system operation, production testing and configuration management.

C.3.2.6.4 Software Delivery In delivering the software, the Contractor shall adhere to the JPM IS Software Deliveries Process, SOP 31 (20 May 2015).

C.3.2.6.4.1 Formal In-Cycle Deliveries The Contractor shall make Formal In-Cycle Deliveries to include delivery of Software Items and Technical Documentation. In-cycle deliveries are tied to Government milestone events such as formal Testing and Evaluation leading to Fielding Decisions.

C.3.2.6.4.1.1 Formal in-cycle deliveries shall include all components of the software, even if no changes have been made to specific components.

C.3.2.6.4.1.2 As a part of a Formal In-Cycle Delivery, the Contractor shall create and deliver the following software and technical documentation:

C.3.2.6.4.1.2.1 The Contractor shall update Software Product Specification (SPS), IAW ELIN A008.

C.3.2.6.4.1.2.2 The Contractor shall update Software Version Description (SVD), IAW ELIN A011.

C.3.2.6.4.1.2.3 The Contractor shall update and Software Test Description (STD), IAW ELIN A016.

C.3.2.6.4.1.2.4 The Contractor shall update and deliver a Software Test Report (STR) as a record of the testing performed on a CSCI, a software system or subsystem, or other software-related item, IAW ELIN A018.

C.3.2.6.4.1.2.5 The Contractor shall update System Administrator Manual (SAM) IAW ELIN A014.

C.3.2.6.4.1.2.6 The Contractor shall update Software User Manual (SUM) IAW ELIN A015.

C.3.2.6.4.1.3 The Contractor shall when required provide updates to the following JEM technical documentation due to changes in the software to maintain the accuracy of the document as set forth below:

C.3.2.6.4.1.3.1 The Contractor shall update Interface Design Document (IDD) IAW ELIN A012.

C.3.2.6.4.1.3.2 The Contractor shall update Software Programmer’s Guide (SPG) IAW ELIN A013.

C.3.2.6.4.1.3.3 The Contractor shall update Engineering Notebooks (EN) IAW ELIN A020.

C.3.2.6.4.1.3.4 The Contractor shall update Software Resources Data Reporting (SRDR) IAW ELIN A006.

C.3.2.6.4.1.4 Baseline Management The Contractor shall maintain the currency and accuracy of the allocated and product baselines. The Contractor shall establish and follow definitive processes that identify how the baseline will be managed or maintained.

C.3.2.6.4.1.4.1 Baseline Traceability The Contractor shall maintain documented traceability between the functional, allocated, and product baselines for all software items. Traceability shall include all derived component-level requirements, including those typically included in a separate Software Requirements Specification (SRS), and shall provide forward and backward traceability between all requirements, system components, and associated design documentation (e.g. IDD, SDD, Detail Specs). Traceability shall also include rationale and heritage information via inclusion of Requirement ID, Rationale, Traced From and Owner metadata as detailed in MIL-HDBK-520A Table I, as well as documentation of (or direct links to documentation of) all historical approved changes to the Contractor-managed requirements.

C.3.2.6.4.1.4.2 The Contractor shall update Software Requirements Specification (SRS) IAW ELIN A009.

C.3.2.6.4.1.4.3 Software Allocation The Contractor shall categorize all software as application software and support software categories. Each category shall comprise a Computer Software Configuration Item (CSCI) and may further be subdivided into smaller CSCIs if the CSCI is complex, e.g., functional, allocated and product baselines. The product baseline items could be further broken down into developmental, test and production software baselines. The CSCIs shall be documented in detail in the Software Design Description (SDD). The Contractor shall deliver a SDD for JEM that details the design descriptions of the computer software configuration items, database design descriptions, interfaces among the software units/segments, etc. CSCIs shall be uniquely named and/or numbered and identify the functional characteristics (for example, its purpose and use) and physical characteristics. CSCIs will include the JEM and products that are used in the development of JEM that should be controlled. The Contractor shall update and submit the SDD IAW ELIN A010.

C.3.2.6.5 Formal Out-of-Cycle Deliveries The Contractor shall provide a software upgrade to fix a designated high priority 1 and 2 PCR(s) and technical documentation. Typically, a patch will include only those files that have been changed and can be installed over the top of an existing program, but this will depend on the nature of the patch and the detailed instructions as provided by the Government.

C.3.2.6.5.1 As part of a Formal Out-of-Cycle Delivery, the Contractor shall prepare and deliver the following software and technical documentation. In addition, during contract performance, the Contractor shall perform updates for the same software and technical documentation:

C.3.2.6.5.1.1 The Contractor shall update Software Product Specification (SPS), IAW ELIN A008.

C.3.2.6.5.1.2 The Contractor shall update Software Version Description (SVD), IAW ELIN A011.

C.3.2.6.5.1.3 The Contractor shall update Software Test Description (STD), IAW ELIN A016.

C.3.2.6.5.1.3.1 The Contractor shall update Software Test Report (STR) as a record of the testing performed on a CSCI, a software system or subsystem, or other software-related item, IAW ELIN A018.

C.3.2.6.6 The Contractor shall provide updates to the following JEM technical documentation due to changes in the software to maintain the accuracy of the document:

C.3.2.6.6.1 The Contractor shall update Engineering Notebook (EN) IAW ELIN A020.

C.3.2.6.6.2 The Contractor shall update System Administrator Manual (SAM) IAW ELIN A014.

C.3.2.6.6.3 The Contractor shall update Software User Manual (SUM) IAW ELIN A015.

C.3.2.6.6.4 The Contractor shall update Interface Design Document (IDD) IAW ELIN A012.

C.3.2.6.7 Engineering Delivery The Contractor shall provide Engineering Deliveries at the request of the Government to support testing, review and in-progress Government feedback. These deliveries will be requested to support the program development effort to meet emerging requirements, and integration efforts. In general, Engineering Deliveries are not fielded.

C.3.2.6.7.1 As part of an Engineering Delivery, the Contractor shall update and deliver the following software and technical documentation. In addition, during contract performance, the Contractor shall perform updates for the same software and technical documentation:

C.3.2.6.7.1.1 The Contractor shall update Software Version Description (SVD), IAW ELIN A011.

C.3.2.6.7.2 The Contractor shall update when required the following JEM technical documentation when software changes make document updates necessary to maintain the accuracy of the documents:

C.3.2.6.7.2.1 The Contractor shall update System Administrator Manual (SAM) IAW ELIN A014.

C.3.2.6.7.2.2 The Contractor shall update Software User Manual (SUM) IAW ELIN A015.

C.3.2.6.7.2.3 The Contractor shall update Interface Design Document (IDD) IAW ELIN A012.

C.3.2.6.8 Informal Engineering Delivery The Contractor shall provide Informal Engineering Deliveries at the request of the Government to support informal feedback by the Government for verification of updated capability, and early integration and interoperability testing. Informal feedback will include emails, meetings, and discussions to reduce risk in the sustainment process. Informal Engineering Deliveries will not be tracked in the Government configuration management system. All documentation delivered with an Informal Engineering Delivery will be considered to be drafts. At all Informal Engineering Deliveries, the Contractor shall prepare draft versions of documents upon the request of the Government when scheduling the delivery.

C.3.2.6.9 Level-3 Help Desk Support The Contractor shall provide Level-3 SME/Developer Help Desk support to the Government in accordance with JPM IS SOP 34. Available support shall include system administration, sustainment, and operational user assistance and direction to resolve real or perceived software problems. Support shall include access to include phone, email, and chat capabilities at the appropriate security levels. Support shall be available during normal business hours of Monday through Friday, 8 am – 4 pm Pacific Time, and within 1-hour call back response during all other periods. The Contractor shall provide input to the Government-designated tracking system(s) for any actions taken. The Contractor shall record and document all assistance provided using Government approved tools and processes. While resolving a problem, the Contractor shall provide daily status and resolution updates to the Government’s Help Desk Manager. In addition to updating the Government-designated tracking system(s), the Contractor shall include a summary of help desk support activities in the Contractor monthly status report, IAW ELIN A005.

C.3.2.6.10 Technical Publications and Training Materials The Contractor shall provide support to develop or update classroom curriculum and training materials to accommodate specific software changes made to reflect Joint and Service maintenance updates.

C.3.2.6.10.1 To accomplish this subtask as required, the Contractor shall provide the Government with updates to the following documents:

C.3.2.6.10.1.1 The Contractor shall update System Administrator Manual (SAM) IAW ELIN A014.

C.3.2.6.10.1.2 The Contractor shall update Software User Manual (SUM) IAW ELIN A015.

C.3.2.7 Cybersecurity (O&M) [OPTION] The Contractor shall deliver software that is secure and able to be accredited for use on service and joint networks. The Contractor shall ensure that security requirements are addressed in the software updates. The Contractor shall conduct security scans, monitor emerging DISA Information Assurance Vulnerability Management (IAVM) notifications, document vulnerabilities, correct vulnerabilities, and document the resolution or mitigation of vulnerabilities in conjunction with JPM IS SOP 37 and IAW JPM IS SOP 10. The Contractor shall support the Government’s effort to accomplish JEM cybersecurity accreditation by assessing the validity of vulnerabilities identified during formal Government accreditation testing, recommending corrective actions to resolve or mitigate vulnerabilities, and estimating the level of effort and time required to resolve valid vulnerabilities IAW JPM IS SOP 10.

C.3.2.7.1 Maintain Cybersecurity Baseline Integrity The Contractor shall demonstrate compliance with the DoD Instructions 8500.01 (Cybersecurity) and 8510.01 (Risk Management Framework (RMF) for DoD Information Technology (IT). The Contractor shall ensure that software updates under this PWS does not compromise the security posture of the JEM software. Any Category 1 and Category 2 findings shall be considered a compromise of the security posture of the JEM software. Category definitions and security posture shall be governed by DoDI 8500.01 and 8510.01, the Defense Information Systems Agency (DISA) Information Assurance Vulnerability Management process, and DISA benchmarks for the JEM software, and DISA Security Technical Implementation Guides (STIGs) and Security Requirements Guides (SRGs).

C.3.2.7.2 Cybersecurity Implementation Plan The Contractor shall implement Government IA strategies and a Government validation plan consistent with JEM’s DIACAP Implementation Plan (DIP).

C.3.2.7.3 Cybersecurity Control Testing and Validation After updates to the software under this PWS, the Contractor shall demonstrate compliance with the applicable Cybersecurity controls through performance of a Contractor Cybersecurity Self-Assessment. The Contractor shall evaluate each software end-item against the applicable Security Technical Implementation Guides (STIGs) or checklists as provided in the DIP. Additionally, for STIGs or checklists that are supported by DISA approved software automated test tools, the Contractor shall deliver the test reports generated by the test tools. The Contractor shall deliver test reports for STIGs or checklists supported by automated test tools IAW ELIN A019, Information Assurance Test Tool Reports (IATTRs).

C.3.2.7.4 Follow-on Test and Evaluation Support The Contractor shall support the Government with Follow-on Test & Evaluation (FOT&E) resulting from Joint and Service updates to the existing JEM baseline. FOT&E support will include Contractor delivery of technical Subject Mater Expert (SME) support, resolution of SPR deficiencies, and onsite FOT&E support at a Government system site location to ensure operability of the deliveries. For proposal purposes only, the JEM program estimates one (1) FOT&E event each year, requiring one (1) SME to travel to Joint Base Lewis McChord, Washington an operational site location for three (3) days to provide onsite T&E support.

C.3.2.8 Performance Requirements (PROC) C.3.2.8.1 Program Management –Total Package Fielding Support The Contractor shall manage total package fielding support efforts for initial fielding of JEM systems.

C.3.2.8.1.1 Periodic Work Planning and Scheduling Meetings The Contractor shall participate in Periodic Work Planning and Scheduling Meetings with the Government Program Office and Government Contracting Representatives. The first Periodic Work Planning and Scheduling Meeting will be scheduled by the Program Office within 30 days of contract award. Periodic Work Planning and Scheduling Meetings may be held in conjunction with other meetings and reviews or scheduled independently no less than six (6) months apart. Depending on the content to be discussed and resolved, the Work Planning and Scheduling Meeting may be held at SPAWAR San Diego (CA), the Contractor's facility, or via teleconference. The understanding and commitments agreed upon during the Periodic Work Planning and Scheduling Meetings, or specific clarification initiated by the Government to the Contractor, will be detailed in a Technical Instruction (TI) provided to the Contractor by the Government. A TI template is provided by reference in Other Government Documents, C.9.7

C.3.2.8.1.2 Monthly Status Report The Contractor shall provide all monthly status reports IAW ELIN A005.

C.3.2.8.1.3 Integrated Master Schedule Report The Contractor shall provide all monthly status reports IAW ELIN A007.

C.3.2.8.2 Configuration Management (CM) The Contractor shall document their CM processes and procedures in a Configuration Management Plan (CMP) that shall maintain the integrity of the configuration items, Standard Operating Procedures and shall be delivered IAW ELIN A025. The CMP shall serve as the baseline for all configuration management activities, including all changes to technical data. The Contractor shall implement and maintain the Government-approved CMP and provide revisions IAW ELIN A025.

C.3.2.8.3 Total Package Fielding Support The Contractor shall provide total package fielding support of the JEM software. Software updates shall be performed in accordance with the most recent product baseline established by and approved by the Government. In accordance with JPM IS SOP 10 the Contractor shall use the JPM IS database to:

1)Review and provide input to Government-developed Change Requests.
2)Develop Change Requests.
3)Review and provide input to system configuration.
4)Review and provide input to software load procedures.
5)Review and provide input to production and installation drawings and documentation.
6)Review and provide input to System problem resolution.
7)Review and provide input to pre-installation check out procedure.
8)Provide input to version configuration required for proper system operation, production testing and configuration management.

C.3.2.8.4 Software Delivery In delivering the software, the Contractor shall adhere to the JPM IS Software Deliveries Process, SOP 31 (20 May 2015).

C.3.2.8.5 Formal Out-of-Cycle Deliveries The Contractor shall provide a software upgrade to fix a designated high priority 1 and 2 PCR(s) and technical documentation to support the initial fielding of JEM software. Typically, a patch will include only those files that have been changed and can be installed over the top of an existing program, but this will depend on the nature of the patch and the detailed instructions as provided by the Government.

C.3.2.8.5.1 As part of a Formal Out-of-Cycle Delivery, the Contractor shall prepare and deliver the following software and technical documentation. In addition, during contract performance, the Contractor shall perform updates for the same software and technical documentation.

C.3.2.8.5.1.1 The Contractor shall update Software Product Specification (SPS), IAW ELIN A008.

C.3.2.8.5.1.2 The Contractor shall prepare Software Version Description (SVD), IAW ELIN A011.

C.3.2.8.5.1.3 The Contractor shall update Software Test Description (STD), IAW ELIN A016.

C.3.2.8.5.1.4 The Contractor shall prepare Software Test Report (STR) as a record of the testing performed on a CSCI, a software system or subsystem, or other software-related item, IAW ELIN A018.

C.3.2.8.6 The Contractor shall provide updates to the following JEM technical documentation due to changes or characteristics in the deployed environment, and resulting software changes, to maintain the accuracy of the document.

C.3.2.8.6.1 The Contractor shall update Engineering Notebook (EN) IAW ELIN A020.

C.3.2.8.6.2 The Contractor shall update System Administrator Manual (SAM) IAW ELIN A014.

C.3.2.8.6.3 The Contractor shall update Software User Manual (SUM) IAW ELIN A015.

C.3.2.8.6.4 The Contractor shall update Interface Design Document (IDD) IAW ELIN A012.

C.3.2.8.7 Engineering Delivery The Contractor shall provide Engineering Deliveries at the request of the Government to support testing, review and in-progress Government feedback. These deliveries will be requested to support the program development effort to meet emerging requirements, and integration efforts. In general, Engineering Deliveries are not fielded.

C.3.2.8.7.1 As part of an Engineering Delivery, the Contractor shall update and deliver the following software and technical documentation. In addition, during contract performance, the Contractor shall perform updates for the same software and technical documentation:

C.3.2.8.7.1.1 The Contractor shall prepare Software Version Description (SVD), IAW ELIN A011.

C.3.2.8.7.2 The Contractor shall update when required the following JEM technical documentation when software changes make document updates necessary to maintain the accuracy of the documents:

C.3.2.8.7.2.1 The Contractor shall…