Solicitation Amendment W911SG26BA0110002 SF 30.pdf
PDF 4 MB Posted
- Attached to
- Railroad and Fencing Repairs at Gate #4
- Solicitation number
- W911SG26BA011
About this file
This is Standard Form 30, Amendment 0002 to Solicitation W911SG26BA011, issued by the U.S. Army Corps of Engineers (USACE) Fort Bliss, Texas on August 21, 2026. The amendment modifies the List of Drawing Sheets in Section 00 01 15 by updating attachment references and page counts for supporting technical documentation.
The amendment adds four contract documents: a revised Statement of Work for Gate #4 Railroad and Fencing Work, the Solicitation RFI Q&A (W911SG26BA011), UFC 4_860_01 Railroad Design and Rehabilitation (184 pages), and UFC 4_860_03 Railroad Track Maintenance and Safety Standards (107 pages). It deletes the original "Statement of Work Railroad Tracks and Fence Repairs at Gate 4" document. The three newly added technical documents now have specified page counts (184, 107, and 4 pages respectively), whereas they previously had no page counts assigned. Offerors must acknowledge receipt of this amendment prior to the solicitation deadline by completing items 8 and 15, acknowledging receipt on offer copies, or sending separate written communication referencing the solicitation and amendment numbers. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 01 15 - List of Drawing Sheets
The attachments table has changed from:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0006 ufc 4_860_01_ Railroad Design and Rehabilitation
Supporting Technical Documentation
21 Aug
Attach ment
No
0007 ufc 4_860_03_ Railroad Track Maintenance and Safety Standards
Supporting Technical Documentation
21 Aug
Attach ment
No
0008 W911SG26BA
Solicitation RFI Q&A
RFI Questions and Answers 21 Aug
Attach ment
No
To:
Identifie r
Document Name
Document Description Reference Identifier
Date Line Item Page N umbers
Docum ent Type
Provide d Under Separat e Cover
0006 ufc 4_860_01_ Railroad Design and Rehabilitation
Supporting Technical Documentation
21 Aug
184 Attach ment
No
0007 ufc 4_860_03_ Railroad Track Maintenance and Safety Standards
Supporting Technical Documentation
21 Aug
107 Attach ment
No
0008 W911SG26BA RFI Questions and Answers 21 Aug 4 Attach No
W911SG26BA0110002
Solicitation RFI Q&A
2026 ment
The following contract documents were added:
SoW for Gate #4 Railroad and Fencing Work (Revised) W911SG26BA011 Solicitation RFI Q&A ufc 4_860_01_Railroad Design and Rehabilitation ufc 4_860_03_Railroad Track Maintenance and Safety Standards
The following contract documents were deleted:
Statement of Work Railroad Tracks and Fence Repairs at Gate 4
The following contract documents Page Counts were changed:
DOCUMENT PAGE COUNTS
DOCUMENT NAME FROM TO
ufc 4_860_01_Railroad Design and Rehabilitation none 184 ufc 4_860_03_Railroad Track Maintenance and Safety Standards none 107
W911SG26BA011 Solicitation RFI Q&A none 4
W911SG26BA0110002
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0002 |
| EffDate: 21 AUG 2026 |
| ReqNo: |
| ProjNo: A76 10066 6J |
| IssCode: W911SG |
| AdmCode: |
| IssuedBy: W6QM MICC-FT BLISS |
BLDG 111, 111 PERSING RD
FORT BLISS, TX 79916-6812
UNITED STATES
JAKEB JAMES, EMAIL: JAKEB.I.JAMES.CIV@ARMY.MIL TELEPHONE: 9155684332
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W911SG26BA011 |
| SolDate: 03 AUG 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is to add the Submitted RFI Questions and Answers to the Solicitation |
A) The Statement of Work (SoW) has been revised in Sections 1.4.2.1 and 1.4.2.2 B) The RFI Questions and Answers have been added as an attachment C) UFC 4_860_01 and 4_860_03 have been added as attachments D) All other Terms and Conditions remain unchanged and in effect
| ContNameTitle: |
| CoNameTitle: FLOR SANCHEZ |
| ContDate: |
| CODate: 21 AUG 2026 |
File details come from the government source that posted it. Updated .