RFI Answers.pdf
PDF 228 KB Posted
- Attached to
- B118 Repair Replace Shingle Roof Federal contract opportunity
- Solicitation number
- W911SG25BA026
About this file
This document is a Request for Information (RFI) Questions and Answers for Solicitation W911SG25BA026, which concerns the repair and replacement of a shingle roof for Building 118. The document addresses six key inquiries from potential contractors, including details about roof square footage, government budget, bid bond requirements, and lightning protection. The Contracting Officer's Representative (COR) provides responses, noting that contractors should reference Sheet A-101 for roof dimensions, confirm a 20% bid bond requirement, and understand that existing lightning protection is not under warranty. Any lightning protection removed during construction must be reinstalled by a UL Certified Lightning Protection Professional (Journeyman). The solicitation is issued by the Department of Public Works (DPW) and involves a federal construction project for roof repair.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offerors OF_1419 Page 1.pdf | ||
| Abstract of Offerors OF_1419 Page 2.pdf | ||
| Abstract of Offerors OF_1419 Page 4.pdf | ||
| Abstract of Offerors OF_1419 Page 3.pdf | ||
| Amendment 01_SOW Updated 8.13.25.docx | DOCX document | |
| Solicitation Amendment W911SG25BA0260002 SF 30.pdf | ||
| B118 Sign in Sheet.pdf | ||
| LBP Testing Roof Top 5-16-2025 Bldg. 118.pdf | ||
| B118 Drawings.pdf | ||
| Solicitation - W911SG25BA026.pdf | ||
| SOW Repair Replace Shingle Roof.docx | DOCX document | |
| Solicitation Amendment W911SG25BA0260001 SF 30.pdf | ||
| Asbestos Survey Bldg. 118.pdf | ||
| Wage Determination.txt | TXT text file |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference No. SOLICITATION W911SG25BA026 – B118 Repair Replace Shingle Roof
RFI QUESTIONS AND ANSWERS
W911SG25BA026
B118 Repair Replace Shingle Roof
1. Estimated Roof Square Footage The solicitation documents do not appear to list the total roof area for Building 118. Can you please provide the total square footage or a drawing page reference for measurement?
Contracting Officer's Representative (COR) RESPONSE: Reference Sheet A-101 for estimated overall dimensions. Contractor is responsible for verifying all dimensions in field.
2. Government Budget or Independent Estimate Is there a government estimate or anticipated construction budget available for this project?
RESPONSE: Yes, there is a government estimate for this project but unfortunately that information cannot be disclosed.
3. Bid Bond Amount Confirmation While FAR 52.228-1 is incorporated, can you please confirm if the required bid bond amount is 20% of the total bid, or if a different percentage applies?
RESPONSE: 20% of the total bid.
4. Lighting protection under warranty?
DPW – ESD – COR RESPONSE: No, any existing lighting protection is not under warranty.
5. Certification reports of lightning protection exist, does it need to be recertified?
DPW – ESD – COR RESPONSE: In accordance with the Statement of Work, Section 1.4.4.25, Any (existing) lighting protection that is removed during construction shall be reinstalled by a UL Certified Lightning Protection Professional (Journeyman).
6. If lighting protection is warrantied, who is it warrantied by, so we can reach out to the company.
DPW – ESD – COR RESPONSE: No, any existing lighting protection is not under warranty.