About this file

This document is an LBP (Lead-Based Paint) Testing Data Sheet for Building 118, conducted on the roof top on 5/16/2025. The assessment was performed using a Viken/Pb200e XRF (X-ray Fluorescence) instrument with serial number 2759, by inspectors Frank Lujan and Paul Rodriguez. The testing involved three wood soffit locations (South, East, and North), all colored green, with XRF readings of 0.0, 0.1, and 0.0 mg/cm² respectively. All tested locations were classified as "NEGATIVE" for lead-based paint and were noted to be in "INTACT" condition. The document notes that the assessment conforms to the Texas Department of State Health Services lead measurement standard of 1.0 mg/cm² by X-ray fluorescence.

View the file

Other files for this federal contract opportunity

Other files attached to B118 Repair Replace Shingle Roof, newest first.
File Type Posted
Abstract of Offerors OF_1419 Page 1.pdf PDF
Abstract of Offerors OF_1419 Page 2.pdf PDF
Abstract of Offerors OF_1419 Page 4.pdf PDF
Abstract of Offerors OF_1419 Page 3.pdf PDF
Amendment 01_SOW Updated 8.13.25.docx DOCX document
Solicitation Amendment W911SG25BA0260002 SF 30.pdf PDF
RFI Answers.pdf PDF
B118 Sign in Sheet.pdf PDF
B118 Drawings.pdf PDF
Solicitation - W911SG25BA026.pdf PDF
SOW Repair Replace Shingle Roof.docx DOCX document
Solicitation Amendment W911SG25BA0260001 SF 30.pdf PDF
Asbestos Survey Bldg. 118.pdf PDF
Wage Determination.txt TXT text file
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LBP TESTING DATA SHEET

Facility Information: Roof Top Facility Name: Building Number: 118 XRF Model and M/N:

Viken/Pb200e Date of Assessment: 5/16/2025

XRF Instrument S/N: 2759 Inspector Name(s): Frank Lujan/Paul Rodriguez

Data Sheet

SA

M

PL

E

ID

SU

BS

TR

AT

E

CO

M

P0 N

EN

T

CO

LO

R O

F

CO

M

PO

N

EN

T

TE

ST

L O

CA

TI

O N

DE

SC

RI

PT

IO

XR

F

RE

AD

IN

G

(m g/ cm ²)

CL

AS

SI

FI

CA

TI

CO

DI

TI

N/A N/A N/A Calibration (< 0.00) 0 ACCEPTABLE N/A N/A N/A N/A Calibration (0.8 to 1.2) 1.0 ACCEPTABLE N/A LBP-01 Wood Soffit Green South .0 NEGATIVE INTACT LBP-02 Wood Soffit Green East .1 NEGATIVE INTACT LBP-03 Wood Soffit Green North .0 NEGATIVE INTACT

NOTES:

DPW-ED conforms to Texas Department of State Health Services lead measurement standard, 1.0mg/cm2 by X-ray fluorescence.