W911SG25BA004 Questions and Answers.pdf

PDF 133 KB Posted

Attached to
White Sands Missile Range (WSMR) Repair Vehicle Exhaust System, BLDG 23480
Solicitation number
W911SG25BA004
Issued by

About this file

This document is a Questions and Answers (Q&A) file for Solicitation W911SG25BA004, addressing a specific construction project at White Sands Missile Range. The Q&A addresses a detailed inquiry about the ceiling treatment during a vehicle exhaust system repair at Building 23480. The response clarifies that the existing suspended ceiling is in good condition and will not be fully demolished. Instead, the contractor is instructed to temporarily remove specific ceiling sections to access and replace the exhaust system ductwork, with the requirement to carefully reinstall the original ceiling tiles and grid, replacing any damaged components. The document provides precise guidance on how to handle the ceiling during the renovation work, ensuring minimal disruption to the existing infrastructure while facilitating the necessary mechanical system repairs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911SG25BA004 Questions from Bidders

1. During the site visit at Building 23480, a 2 x 2 lay was found in the ceiling where work is to be performed. In the bid documents, there is no indication of this lay in ceiling. Is the entire ceiling to be demolished? Or is it to be removed and reused? Is ceiling grid to left in placed or removed? Is a new ceiling grid system is to be installed?

a. The design documents do identify the presence of a suspended ceiling; note figures A and B on page 4, and figure C on page 5 of the drawing set. The ceiling is in good condition and not to be demolished. However, the contractor shall remove sections of the suspended ceiling to access the exhaust system ductwork which will be replaced. Removed sections of the suspended ceiling tiles and grid shall be reinstalled and any damaged items will be replaced. The ceiling grid will be left in place to the greatest extent possible, and only sections required to demo the ductwork will be removed temporarily.