Solicitation Amendment - HELSTF Water Main Valves Replacement - W911SG24B0006 0001.pdf

PDF 768 KB Posted

Attached to
HELSTF Water Main Valves Replacement
Solicitation number
W911SG24B0006
Issued by

About this file

This document is a solicitation amendment for a federal contract opportunity. The purpose of the amendment is to incorporate information about the Army Contract Writing System (ACWS) transition as well as provide responses to Requests for Information (RFI) questions.

The underlying contract opportunity is a construction solicitation to remove and replace seven existing gate valves and install one new gate valve on the HELSTF main potable water distribution system at White Sands Missile Range, New Mexico. The contract will be a Firm-Fixed-Price (FFP) with a 90-calendar day period of performance. The procurement is set aside for 100% Women-Owned Small Businesses (WOSB) under NAICS code 237110 (Size Standard $45 Million). The estimated magnitude of the procurement is between $250,000 and $500,000. The solicitation provides details on the ACWS transition, instructions for offerors, and responses to six RFI questions covering requirements such as full-time personnel, compaction testing, lead-based paint surveys, disinfection plans, and site access.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0012124360

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provi ded herei n, all t erms and condit ions of t he document refere nced in Item 9A or 10A, as heretofore change d, remai ns unchanged and in ful l force and effect .

15A. NAME AND TIT LE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate the f ollow ing:

1. Army Contract Writing System (ACWS) Information

2. RFI Questions and Answers All other terms and conditions remain unchanged.

1. CO NTRACT ID CODE P AGE OF P AGES

J 1 4

16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)

16C. DAT E SIGNED

BY 12-Jul-2024

16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contract ing Officer )(Signature of person authorized t o sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X W911SG24B0006

X 9B. DAT ED (SEE IT EM 11)

17-Jun-2024

10B. DAT ED (SEE IT EM 13)

9A. AMENDMENT OF SOLICITAT ION NO.

11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS

X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer is ext ended, X is not extended.

Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:

(a) By compl eti ng Items 8 and 15, and returning 1 copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s a mendment on each copy of t he offer submit ted;

or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FA ILURE OF YOU R A CKNOWLEDGMENT TO BE RECEIVED AT TH E P LACE D ESIGNATED FOR TH E RECEIPT OF OFFERS P RIO R TO THE HOUR AN D DATE SP ECIFIED MA Y RESULT IN

REJECTIO N OF YOUR OFFER. If by vir tue of thi s amendment you desire t o change an offer already submit ted, s uch c hange ma y be made by t ele gram or let ter, provided each t elegram or l ett er makes reference to the sol ici tat ion and this amendment , and is re ceived prior to the openi ng hour and dat e speci fi ed.

12. ACCOUNTING AND APPROPRIATION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).

C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:

D. OT HER (Specify type of modification and authorit y)

E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO .(If appli cable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Jul-2024

CODE

MICC - FORT BLISS (919TH CBN)

111 PERSHING RD

FT BLISS TX 79916

W911SG 7. AD MINISTERED BY (If other t han item 6)

4. REQUISITION/PU RCHASE REQ. NO.

CODE

See I tem 6

FACILITY CODECODE

EMAIL:TEL:

W911SG24B0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

ARMY CONTRACT WRITING SYSTEM

Army Contract Writing System (ACWS) Transition Information for Offerors

a. The Army Contracting Enterprise (ACE) is in the process of deploying new solicitation and contract writing software to Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software suite will soon replace most existing Army contract writing systems, including the system used to create and release this Solicitation.

b. During this transition period, Offerors are hereby advised:

1. The Contracting Office may use any combination of contract writing systems to create and release documents related to this solicitation (e.g. solicitation amendments and awards, if any). Due to this: i.

This solicitation may contain different offer submission instructions than other solicitations released by the same Contracting Office (e.g. requiring offer submission via the PIEE Solicitation Module vs. e-mail).

Offerors should review all offer submission instructions contained in the solicitation documents and direct any questions or concerns to the Contract Specialist or Contracting Officer.

ii. If the Contracting Office switches contract writing systems prior to award, documents you receive from the Contracting Officer or view on SAM.gov or other forums may appear noticeably different than the initial solicitation or previous solicitations or awards from the same Contracting Office. This is normal and expected.

iii. A change between contract writing systems may cause important information concerning solicitation response (amendments) or accepted terms (awards) to take on different formatting or appear in different parts of later documents issued. Offerors shall review all documents carefully to locate this important information and direct any questions or concerns to the Contract Specialist or Contracting Officer.

2. The Government does not intend to use the transition between contract writing systems to effect any changes to solicitation or award terms and conditions without accompanying document narratives explicitly stating such changes are deliberate and desired. While the Contract Specialist and Contracting Officer will take care to minimize or eliminate any inadvertent changes when adapting to the new contract writing software, you, as the Offeror, may still be the first to spot such errors. Therefore, Offerors shall:

i. Notify the Contracting Officer immediately if any observed changes, removals, or additions affect your award eligibility, violate or alter existing quote/proposal terms, or could affect Contract performance post-award.

ii. Take special care to ensure all fill-in Clauses are populated and remain populated across documents received from the Contracting Office throughout the Solicitation and Award process.

iii. Contact the Contracting Officer listed on the first page of the solicitation or solicitation amendment for guidance if you notice or suspect any inadvertent change has occurred between document issuances.

3. The Contracting Officer will correct problems affecting award documents (if any) via bilateral modification, at no cost to the Contractor. Any such modification will reconcile the award with the latest version of this solicitation reflecting deliberate action by the Contracting Officer (e.g. the first issuance if no amendments, or the latest amendment with accompanying narratives), inclusive of any documented pre-award negotiations or accepted supplemental offer terms.

4. In the unlikely event a network disruption, contract writing system error, or financial system error threatens timely award of the requirement set forth in this solicitation, the Contracting Officer: i. May elect to use alternative mechanisms to obligate funds and allow work or deliveries to legally begin to the benefit of, and with legal protection for, both parties.

ii. Will incorporate the latest version of this Solicitation into such mechanisms to serve as a framework for contract execution until any such system problems are resolved.

iii. Will ensure any action taken does not conflict with the stated offer evaluation and award methodology of this requirement.

iv. Will issue a complete, properly-formatted award accurately reflecting this requirement and all applicable terms and conditions once systems return to normal.

RFI QUESTIONS AND ANSWERS

RFI QUESTIONS AND ANSWERS

HELST Water Main Valves Replacement

1. Under the Statement of Work Line 1.9, “The contractor shall, at a minimum, provide a full-time dedicated Superintendent and a dedicated Safety/Quality Control Person for the duration of the contract,” Do both the Superintendent and Safety/Quality Control Person have to be on the jobsite full-time? Or as long as one of them is onsite, will that be sufficient?

RESPONSE: Yes. Both are two separate positions, therefore, full-time is required for both as stated in the SOW.

2. Under “Technical Specifications Section 02221 Trenching, Backfilling and Compaction 3.07.F The contractor will perform at least 1 compaction test every lift at each Type I location,” the areas to be excavated and backfilled are going to be very small. Do you want 1 compaction test every lift?

RESPONSE: A compaction test will be required at all valve locations at the grade directly below the valve. In addition, at Type I locations where pavement surfacing is to be installed, the contractor must provide a compaction test at both top of subgrade and top of base course elevations.

3. Are we to perform a lead based paint survey on the existing pavement markings? Do you anticipate any lead based paint removal?

RESPONSE: There are no pavement markings.

4. Under “Drawings Sheet G2 – General Construction Notes 14 the contractor will be required to submit a detailed disinfection plan that includes all sampling locations along w/ bacteriological samples…” The section of pipeline to be replaced is small, can we just swab the line with chlorine in place of submitting a disinfection plan as described in General Construction Note 14?

RESPONSE: The contractor will not be required to submit samples to a testing laboratory for these repairs. However, a disinfection plan must be submitted as described in Specification Section 02715 Part 1.05.A. In addition, disinfection procedures must be in accordance with AWWA C651-14 as described in Part 3.03.B of the specification.

5. Will there be times during normal working days that we will not be allowed onsite due to

HELSTF testing?

RESPONSE: Yes, the HELSTF site security manager will send out emails when they plan testing.

6. Is there a staging area available for our construction equipment?

RESPONSE: Yes, a staging area will be available but needs to be coordinated with the COR and HELSTF POC.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .