This document contains answers to questions regarding a roof repair solicitation. The solicitation is for roof repairs to Buildings 22840 and 23270 at White Sands Missile Range. The work includes removing and reinstalling guard rails on one building, demolishing a metal shed and utility raceway on the roof of another building, and relocating electrical equipment. A staging area will be provided but no utilities. One superintendent and safety officer are required to oversee work at both sites, which can be performed sequentially but must be completed within the period of performance. No core samples can be taken of the existing roof insulation thickness due to unknown composition.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI QUESTIONS AND ANSWERS
W911SG23B0014
Roof Repairs Group 3 Bldgs. 22840 & 23270
1) Will a staging area be provided for job trailer, equipment and materials if needed?
ANSWER: Staging area for material and equipment will be provided. Staging area for an office trailer may be provided if area is large enough. No u li es will be provided, nor available.
2) Will the area need to be fenced and gated?
ANSWER: The area is not required to be fenced. The Government is not responsible the Contractors materials, equipment & tools. The contractor is responsible for job site safety.
3) Will roof top curbs, penetra ons, pipes, conduits etc. be removed by others prior to roof work commencing?
ANSWER: No, the contractor is responsible for any items called out for demoli on/removal.
4) Steel or metal tow boards at roof top guard rail will need to be removed for new roof installa on? Will that be done by others or part of our SOW? Will it be required to reinstalled above the new finished roof surface?
ANSWER: From building 23270 Addi onal work:
Remove guard rail around roof sec on A without damaging. Reinstall guard rail a er roof comple on. Assure there is a ¼” gap between the bo om of the toe guard and the top of the roof surface for drainage.
5) Is there an asbestos abatement report?
ANSWER: There are no asbestos abatement reports available.
6) Roof top metal shed demoli on, will that be done by others? If so, will it be done prior to new roof installa on?
ANSWER: From building 23270 Addi onal work:
Awarded contractor for this requirement shall demo metal shed on roo op (approx.
8.5’x10.5’). Demo sheet metal u lity raceway from shed to radar pedestal (RP). South end raceway at RP to remain. Leave approximately 12” of the raceway intact at RP. Relocate two duplexes to the 12 inches of raceway remaining. Cap and seal end of raceway with 22-gauge sheet metal. Move two electric motors from roo op shed to ground for Government salvage, do not damage.
7) Will weather or holiday makeup days be allowed (Sat-Sun)?
Answer: The period of performance will be adjusted for weather days the Contractor is scheduled to work, per FAR requirements. The contract period of performance accounts for weekends and holidays.
8) We also asked if could core the roofs and were told NO, we’re going through the drawings and there is no thickness on the insula on?
ANSWER: The exis ng thickness is not known.
9) There is a requirement for full me Superintendent and a dedicated Safety/Quality Control Person for the dura on of the contract. You also state that: ALL work shall be performed simultaneously. Can one Superintendent and Safety/Quality Person cover both loca ons and are you expec ng different people for each building? Also, is simultaneously a hard rule as that will slow down the overall process?
ANSWER:
2a) No if work is being done simultaneously key personnel are required at each site.
2b) Work does not have to be performed simultaneously but does need to be completed during period of performance.
10) TAB H: DIGITALLY SIGNED DRAWINGS, please clarify what drawings you are talking about? Where are they?
ANSWER: Please sign first page of Appendix A ROOFER Data.