W911SG23B0008 RFIs wAnswers.pdf
PDF 139 KB Posted
- Attached to
- WSMR B1845 & B1864 Roof Repairs
- Solicitation number
- W911SG23B0008
About this file
This document contains questions and answers related to solicitation W911SG-23-B0008 from the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood for roof repairs to buildings B1845 and B1864 at White Sands Missile Range. The solicitation requires work to be performed by a full-time superintendent and dedicated safety/quality control person at each site. While work does not need to be simultaneous, it must be completed within the period of performance. Bidders are to sign the first page of Appendix A and use 6-ply glass fiber felt for the roofing system. Type IV asphalt is allowed for hot mopping or adhering the new roof system. No extension to the bid due date of September 14th is permitted.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference No. Solicita�on W911SG-23-B0008 WSMR Roof Repairs B1845 & B1846
1. We are reques�ng a Bid Due Date extension: 9/14 is not possible with the hand delivery or mail requirement, especially with the knowledge that it is going to take some �me for RFI answers to be provided. Those answers are key to our ability to bid.
RESPONSE: No Bid Due Date extension is allowed.
2. There is a requirement for full �me Superintendent and a dedicated Safety/Quality Control Person for the dura�on of the contract. You also state that: ALL work shall be performed simultaneously.
Can one Superintendent and Safety/Quality Person cover both loca�ons or are you expec�ng different people for each building? Also, is simultaneously a hard rule as that will really actually slow down the overall process?
RESPONSE: a) No, if work is being done simultaneously key personnel are required at each site.
b) Work does not have to be performed simultaneously but does need to be completed during period of performance.
3. TAB H: DIGITALLY SIGNED DRAWINGS, please clarify what drawings you are talking about? Where are they?
RESPONSE: Please sign first page of Appendix A ROOFER Data.
4. Please clarify in paragraph I of solicita�on, which type of felt is to be used: 6-ply glass fiber roofing felt or styrene-butadiene-styrene (SBS)?
RESPONSE: Use 6-Ply glass fiber.
5. Roofing subcontractor would like to use Type IV asphalt to hot mop/adhered roof system if allowed?
RESPONSE: Type IV is allowed.