Drawings_Plan Sheets Bid Set-RR7 MM 4.1 Culverts_ Revised SEPT 2023.pdf
PDF 1 MB Posted
- Solicitation number
- W911SG23B0003
About this file
This document package contains construction drawings and specifications for a project to replace eight precast concrete box culverts on Range Road 7 at mile marker 4.1 on White Sands Missile Range in New Mexico. The project includes removing the existing culverts and roadway section, constructing a temporary bypass road, installing the eight 12' x 10' precast concrete box culverts, reconstructing the roadway section, and applying pavement markings. Additional work includes clearing and grubbing, excavating, grading, placing aggregate base and asphalt pavement, installing guardrails and traffic signs, and constructing earthen berms and riprap. The solicitation number for this project is W911SG23B0003 and it was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood. Bids are due by the date specified in the solicitation. The contractor will be responsible for maintaining traffic, dust control, disposal of waste materials, and complying with all specifications, codes and regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sign In Roster.pdf | ||
| Solicitation Amendment.pdf | ||
| Site Visit Sign In Roster_Redacted.pdf | ||
| Solicitation Draft_8.31.23.pdf | ||
| Wage Determination.pdf | ||
| Drawing-RR7 MM 4.1 Culverts-W911SG23B0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RR7 MM4 CULVERTS
General Notes:
1. Contractor shall submit a traffic control plan for approval prior to beginning construction, per NMSHTD and the
MUTCD. Contractor is responsible for maintaining all traffic control devices and maintaining vehicular access 24 hours a day 7 days a week.
2. All materials and equipment shall be installed in accordance with manufacture's published recommendations, contract documents, industry standards and all federal, state, and local codes and amendments as adopted by the government for service intended by the Contracting Officer (KO). The install of all materials and equipment shall be made by experience and licensed craftsman in a neat workman like manner. All materials, supervision, labor, tool, costs and services necessary to completely install a functional system shall be furnished by the contractor.
3. The term "provide" used in the drawings and scope of work implies the contractor is to furnish, transport, install, connect, warrant, and start-up, inclusively.
4. The drawings are diagrammatic only but shall be followed as closely as actual construction conditions and work of other trades permit.
5. Upon completion of work, contractor shall provide within 10 days, manufacture's operating & maintenance manual for all equipment including replacement parts list.
6. Contractor shall report discrepancies between field conditions and new construction drawings to the KO in writing before the RFI deadline during the solicitation phase.
7. Should there be any concern by the contractor, the contractor shall submit a Request For Information (RFI) through the proper procedures to have his/her concerns resolved.
8. Contractor shall field verify all quantities. Contractor shall field verify all existing utilities prior to any excavation. No heavy equipment shall be used. Contractor shall hand excavate or pothole all utilities to verify locations. Report any damage to the COR immediately.
9. Contractor shall remove and dispose of any existing asphalt pavement or rigid concrete. Contractor shall dispose rigid concrete at the WSMR Hughes Reclamation Area (Main Cantonment) located at the intersection of Watertown and
Hughes Ave. Rigid concrete shall be free of rebar and/or all debris. Contractor shall provide a report to the COR of quantities disposed of.
10. Contractor shall provide an as-built survey with existing grading elevations within 10 days upon completion of the project..
11. Contractor shall apply water for dust control per section 158 of the Federal Highway Administration (FP-03). Contractor shall utilize fire hydrant located at LAT= 32.4802, long = -106.4186, Approximately 4 miles South of project. the contractor must install a back flow prevention device that is approved by WSMR Water Plant manager, 575-678-1917.
Alternate water source is located at LAT: 32.9022, LONG: -106.4322, a pond, contractor shall supply pump approximately 30 miles North of project.Metering of water usage shall be required and reported to the COR on a weekly basis by the amount of truck loads used per day
12. Contractor shall clear and grub 30' wide area for bypass road, see site plan.
13. Vegetation shall be deposited at borrow site specified for this project, located at LAT: 32.5129, LONG: -106.4295. No foreign debris shall be placed at borrow site; concrete, pavement, rebar, rocks ect.
14. Contractor shall saw cut and remove existing asphalt to replace culvert structure.
15. A borrow pit is available for use, located at LAT: 32.5129, LONG: -106.4295, 1 mile south of the project. COR shall be notified at least 5 working days prior to removing any material. Quantities of material removed shall be reported to the
COR on a weekly basis. When finished using borrow pit, contractor shall remove any grubbed vegetation and leave side slopes at a 4H:1V or flatter slope.
Traffic Sign Notes:
1. All sign materials and installation shall comply with the latest edition of the Manual on Uniform Traffic Control Devices, Section 701 of NMSHTD and Plan Sheet 8.
2. All sign panels shall conform to ASTM B 209. Sign panels shall be constructed of 0.125" Aluminum.
3. All sign sheeting shall comply with ASTM D4956 Type IX Diamond Grade VIP Sheeting.
4. NCHRP 350 compliant breakaways sleeves shall be required on all sign installations with the exception of delineators.
5. All new traffic signs, specifications and placement distances shall be per sign details and sign distance tables of the "standard highway signs" standard manual, 2009 edition.
6. All new signs shall be installed at designated areas and new sign posts shall have a "slipbase system"
& shall be installed at a safe clear distance from the existing curb or edge of pavement.
7. All traffic signs and posts shall be disposed offsite at a State Licensed Landfill.
Pre-cast Box Culvert:
1. All materials and workmanship shall conform to the New Mexico Department of Transportation Specifications for Highway and Bridge Construction and NMDOT Standards..
2. All concrete shall be class "AA" (4000psi). Chamfer all exposed edges
3. Contractor shall install 8EA 12 X 10 precast box culverts, contractor shall field verify all dimensions.
4. Approved Waterproofing membrane and adhesive shall extend to outside barrels and one foot lap down outer wall.
5. Contractor shall provide an OSHA approved Trench safety system.
6. Type III Object Markers shall be provided and installed per plan sheet 8.
7. Re-grade and compact upstream and downstream channel bed (200' from edge of apron and full width.Grade to original profile to match existing elevation of apron.
Pavement Marking Notes:
1. All pavement markings & striping shall be 4" wide, white or yellow as indicated on the details and plan sheets 8 and shall conform to standard highway colors.
2. All pavement markings shall be installed by using Type "B" Waterborn pavement marking material with glass beads per section 634.05 of the FP-03 & Plan sheet 8 of drawings. TY 1 glass beads shall be applied at a minimum rate of 6 pounds per gallon of paint.
3. All specifications for pavement markings are as per Manual of Uniform Traffic Control Devices (MUTCD) and standard manual 2009 Edition.
4. Contractor shall prepare Road surface prior to applying roadway markings per manufacture specifications.
Material Testing:
1. The contractor shall control the quality of the work and shall provide adequate testing to assure compliance with the specifications.
2. After completion of paving work, all paving shall be flooded with water and any resulting "birdbaths" shall be ringed with chalk. Such hollows shall be corrected with addition of asphalt paving materials and re-rolling until all paving is completely level and free from hollows and high spots at no additional cost to the government.
3. Contractor shall perform in-place density and compaction test of the completed pavement in accordance with
CTM No. 375 to determine compliance with specified requirements. Test density core for each 250 tons of
HMA. Maximum area size shall be 500 tons with a minimum of 3 test per location and 1 test for each 50 tons after. Each pavement area shall be an independent lot. Compaction shall be taken as an average for a pavement area. COR shall determine core location.
Berms & RipRap:
1. Wire for riprap shall be "W" or hexagonal mesh and meet the required listed sections of 602 of the NMDOT
Standards Specifications for Highway and Bridge Construction Current Edition.
2. Steel Stakes shall be galvanized steel pipe or 4" X 4" X 3/8" steel angles. Steel stakes shall project 6" above top of riprap.
3. Where splicing is necessary an overlap of at least 1 foot shall be provided.
4. Top of Earth Berm shall be constructed level with top of wing wall.
5. Contractor shall use native rock or other suitable materials for rock berms.
GENERAL NOTES:
1. Reconstruct a portion of Range Road 7 per detail 1 on Sheet 6.
2. Contractor shall clear & grub the 30' temporary bypass road to a smooth and continuous alignment with a minimum radius of 150'.
Elevation to match existing pavement elevation of Range Road 7.
Dispose of vegetation at borrow site.
3. Contractor shall remove and dispose of silt, sedimentation and rock in the arroyo prior to constructing bypass.
4. Contractor may use borrow pit to build up bypass road. Grade and compact bypass road to 98% as per ASTM D1557. All work shall be performed in a manner that provides safe traffic flow 24 hours a day, 7 days a week, access through the project area and adjacent roads.
Contractor is responsible for the traffic control necessary to allow such access.
5. Contractor shall install 5 runs of temporary 48" CMP aligned with the flow of the channel. Contractor shall maintain two way vehicular access 7 days per week 24 hours per day service to this bypass road.
Remove and dispose of bypass road at project completion
6. Saw-cut and remove existing roadway and substrate. Dispose of any existing asphalt pavement or rigid concrete. Contractor shall dispose rigid concrete at the WSMR Hughes Reclamation Area (Main
Cantonment) located at the intersection of Watertown and Hughes
Ave. Rigid concrete shall be free of rebar and/or all debris. Contractor shall provide a report to the COR of quantities disposed of.
7. Remove and dispose of existing 1EA 48" CPM approximately 60LF.
Replace with 8 - 12' x 10' precast concrete box culverts.
60'
140'
65'
15'
SITE PLAN
BEGIN CULVERT:
LAT:32.5243,
LONG:-106.4287
R R
PROPOSED STAGING AREA:
LAT:32.5242,
LONG:-106.4285
BYPASS
RD
BEGIN BYPASS RD:
LAT:32.5239,
LONG:-106.4287
END BYPASS RD:
LAT:32.5249,
LONG:-106.4287
R
R
O P
O P
POWER
POLE
N
END CULVERT:
LAT: 32.5246,
LONG:-106.4287
TEMP
CULVERT
BYPASS CONSTRUCTION NOTES:
1. Contractor shall construct and maintain the temporary bypass road throughout the duration of the project per NMDOT
SSHBC 405.
2. Contractor shall clear and grub the 30' temporary bypass road to a smooth and continuous alignment with a minimum radius of 150'. Elevation to match existing pavement elevation of
Range Road 1.
3. Contractor shall remove and dispose of rock sedimentation and silt in the arroyo in order to install CMP, prior to constructing bypass 30' wide road with embankment slopes no steeper than 3:1. Contractor may use WSMR borrow pits.
4. Contractor shall install 5-48” diam. steel CMP as per specification section 206 NMDOT SSHBC. CMP shall be galvanized gage 16. The alignment of the CMP shall be skewed to match what was removed, align with the center of the arroyo's flow path crossing the road.
5. All work shall be performed in a manner that provides safe traffic flow 24 hours a day, 7 days a week, access through the project area and adjacent roads. Contractor is responsible for the traffic control necessary to allow such access.
6. Apply water for dust control per Section 158 of the Federal
Highway Administration FP-03. Contractor may utilize the fire hydrant located at LAT= 32.4802, long = -106.4186, Approximately 4 miles South of project. the contractor must install a back flow prevention device that is approved by
WSMR Water Plant manager, 575-678-1917.
7. Upon completion and acceptance of the project, the contractor shall remove the temporary bypass road and dispose of the excess soil to the borrow pit. reestablish surrounding area to original or better condition with the surface runoff flow into the arroyo. Demolish existing CMP and dispose.
2'-0"
4'-0"
8"
24"
2'
4"
12"
Existing RockClass 2 Non-Woven Fabric
Wrap bottom, sides and top of
Crushed Stone.
" to
" Crushed Stone or Rock, Dense or Open-Grade With
Little or No Fines, Vibratory
Compaction.
Bedding
Concrete Sand
D/2
Flowable
Fill
Optional
Flowable Fill
Backfill Per Specifications 206.
Ensure a smooth transition from existing Roadway to Bypass.
DETAIL 2- TYPICAL BYPASS CROSS-SECTION
Scale: None
Bypass Details
F l o w
Concrete Apron
Concrete Wingwall
Concrete Apron
Concrete
Wingwall
Culvert
Approach
Guard Rail
See Detail
Sheet 7
Shoulder
Shoulder
Wire Enclosed Riprap
A
A
8 - 12' x 10' Concrete Pre-Cast Box Culverts
Sawcut existing asphalt, provide a new Type "SP-III" asphalt mix with a
Tack Coat on all edges per Section
407 of NMSHTD
Sawcut existing asphalt, provide a new Type "SP-III" asphalt mix with a
Tack Coat on all edges per Section
407 of NMSHTD
50'-0"
50' from Edge of Guardrail
Limits of Grading f r o m e d g e o f a p r o n
Wire Enclosed Riprap
50'-0"
12'
Existing 1EA-48"CMP pipe to be removed
9.5"
H e a d w a l l
#4 Bars
@ 18" c-c
#4 Bars
@ 12" c-c
#4 Bars
#4 Bars
3.82'
11"
106.5' Back to Back of Endwalls of Concrete Box Culverts
Pre-cast Box Culvert:
1. All materials and workmanship shall conform to the New Mexico
Department of Transportation
Specifications for Highway and
Bridge Construction and NMDOT
Standards..
2. All concrete shall be class "AA"
(4000psi). Chamfer all exposed edges
3. Contractor shall install 8EA 12 X
10 precast box culverts.
Contractor shall field verify all quantities,locations and dimensions. Align culverts with the natural flow of the channel.
4. Approved Waterproofing membrane and adhesive shall extend to outside barrels and one foot lap down outer wall.
5. Steel Tube Drain shall be installed two per face, Standard Drawing
511-66-5/6.
6. Contractor shall provide an OSHA approved Trench safety system.
7. Type III Object Markers shall be provided and installed per plan sheet 8.
8. Re-grade and compact upstream and downstream channel bed 200' from edge of apron and full width.Grade to original profile to match existing elevation of apron.
BOX CULVERTS
SECTION VIEW
NO SCALE
BOX CULVERTS
PLAN VIEW
NO SCALE
N
Subbase - Scarify to 8 inches and compact to
95% per ASTM D1557.
New Type
Superpave (SP-IV) asphalt surface compacted to a minimum of 3 inch thickness
New Type
Superpave
(SP-III) asphalt pavement surface.
Tack Coat
Overlap base min.
12" from edge of
HMAC.
New TY II Base
Course compacted to 96% per ASTM
D1557 to a final thickness of 6 inches.
Native Fill - 3H:1V max slope. Compact to 95% per ASTM
D1557.
Subbase - scarify to
8 inches and compact to 95% per
ASTM D1557.
6' - 0" MIN
SHOULDER
6' - 0" MIN
2% Crown Slope
Traveled Way
SHOULDER
12' - 0" MIN
Traveled Way
12' - 0" MIN
Tack Coat
New TY II Base Course compacted to 96% per
ASTM D1557 to a final thickness of 6 Inches.
Subbase - scarify to
8 inches and compact to 95% per
ASTM D1557.
Native Fill - 3H:1V max slope. Compact to 95% per ASTM
D1557.
DETAIL 1- TYPICAL ROADWAY CROSS-SECTION
Scale: None
Final Road Width
1. SW = Final Shoulder Width = 6 feet.
2. TW = Traveled Way Width = 12 feet.
3. Apply new center line to match existing on all new paved areas per Section 634.05 of the Federal Highway
Administration (FP-03).
4. Apply new shoulder line to all new paved areas per Section
634.05 of the FP-03.
5. Contractor shall field verify all quantities.
ROADWAY CONSTRUCTION NOTES
1. Roadway shall be replaced with 8" of subgrade compacted to 95% density, 6" TY II base course compacted to 96% per section 303 (NMSHTD). Apply tack coat and 3" of HMAC Superpave (SP-III) per 423. Asphalt shall be placed in 1.5" lifts, apply tack coat between lifts. Restripe to match existing.
2. All work shall be performed in a manner that provides 24 hour vehicular access through the project area and adjacent roads in a safe manner. Contractor is responsible for the traffic control necessary to allow such access.
3. Contractor shall ensure there is a smooth transition from existing roadway to new roadway, with matching elevations. Re-grade shoulders to a 2% cross slope from edge of pavement.
4. Apply water for dust control per Section 158 of the Federal Highway Administration FP-03.
5. Upon completion and acceptance of the roadway opening to traffic, the contractor shall demolish and remove the temporary bypass road. Remove excess soils from project site and haul to borrow pit.
Roadway Details
CONCRETE CULVERT CROSSING
BEGINNING LAP
INTERMEDIATE LAPEND LAP
SET POST VERTICAL. VARY
POST LENGTH AS REQUIRED
FOR GRADE
GUARDRAIL POST
& BLOCK
PROPOSED HEADWALL
ATTACHED TO
CONCRETE CULVERT
FACE
TOP OF NEW
CONCRETE
BARREL
PROPOSED SELF ADHERING
WATERPROOFING MEMBRANE ROLLED
OVER ENTIRE TOP OF BARREL
12" x 12" x
" THICK STEEL
PLATE WITH 7/8"Φ x 6"
BOLTS BOLTED TO NEW
CONCRETE BARREL
6" THICK PROPOSED
AGGREGATE BASE
COURSE
3" THICK PROPOSED
ASPHALT SURFACE
SET POST VERTICAL. VARY
POST LENGTH AS REQUIRED
FOR GRADE
GUARDRAIL POST &
BLOCK
NEW CONCRETE
BARREL
M
I N
M
A X
V A
R I E
S
SET POST VERTICAL. VARY
POST LENGTH AS REQUIRED
FOR GRADE
GUARDRAIL POST
& BLOCK
6" THICK PROPOSED
AGGREGATE BASE
COURSE
3" THICK PROPOSED
ASPHALT SURFACE
SET POST VERTICAL. VARY
POST LENGTH AS REQUIRED
FOR GRADE
GUARDRAIL POST &
BLOCK
M
I N
M
A X
HAS-E
" dia.
HAS-E
" dia.
W6x9
BOLT MAY BE PLACED
THROUGH EITHER LEFT
OR RIGHT FLANGE
BOLT HOLE
" x 10" BUTTON
HEAD BOLT WITH
OVAL GRIP & HEX
NUT
Guardrail Notes:
1. End treatment shown is a general depiction of an SKT-SP (Sequential Kinking
Terminal-Standard Post System) 50'
NMDOT accepted end terminal that is
FHWA accepted as crashworthy at Test
Level 3 (TL-3) and may be used for all posted speeds.
2. Accepted systems, on the Departments
Approved Product List, shall be installed according to manufactures' installation instructions.
3. Contractor shall grade guardrail installation area to a 10:1 slope or flatter.
4. A reflectorized object marker shall be installed. Adhesive backed reflective sheeting may be applied directly to guardrail end treatment impact head as per the manufacturer's recommendation. Direct applied sheeting shall provide a smooth surface and have no wrinkles, air bubbles, cuts or tears. Reflective material shall be
Type VIII with yellow background and black chevron stripes. Stripes shall be oriented with their tops away from traffic and angles down at 45° toward traffic.
5. These end treatments do not require an offset at the end. End treatments shall be installed ensuring that the end piece is 2' off the shoulder. A maximum flare of 25:1 or flatter over the length of the treatment is allowed.
6. End treatments shall be of the length and test level specified in these drawings and as specified by the manufacturer for the intended end treatment type and test level.
Only end treatments currently on the
NMDOT Approved Product List will be accepted for installation. For specific end treatment details, see manufacturers' drawings.
7. Contractor shall warp all grade transitions to create smooth surface contours.
3" THICK PROPOSED
ASPHALT SURFACE
3" THICK PROPOSED
ASPHALT SURFACE
PROPOSED GUARDRAIL
SECTION VIEW
NO SCALE
GUARDRAIL ATTACHED TO CONCRETE CULVERT
DETAIL 1
NO SCALE
GUARDRAIL BEYOND CONCRETE CULVERT
DETAIL 2
W
SHOULDER
12' MIN.
GUIDE OR DIRECTIONAL SIGN WITH
SECONDARY SIGN INSTALLATION ON
EXPRESSWAYS AND FREEWAYS
SIGN INSTALLATION
IN CURB SECTION
SIGN INSTALLATION
BEHIND TRAFFIC BARRIER
MULTIPLE SIGN POST INSTALLATION
IN DITCH SECTION
SIGN INSTALLATION
IN DITCH SECTION
SIGN INSTALLATION
ON STEEP FILL SLOPES
SIGN INSTALLATION
IN FILL SECTION
SIGN
6'
MIN.
SLOPE BREAK
V
(7' MIN.)
V
(7' MIN.)
SHOULDER
W
SLOPE BREAK
12'
MIN.
SIGN
FILL SLOPES
STEEPER
THAN 6H:1V
SLOPE BREAK
SHOULDER
12' MIN.
V
(8' MIN.)
V
(5' MIN.)
MAJOR SIGN
0" MIN.
3" MAX.
SECONDARY
SIGN
W
V
(7' MIN.)
EDGE OF
TRAVELED
WAY
EDGE OF
TRAVELED
WAY
EDGE OF
TRAVELED
WAY
SIGN
EDGE OF
TRAVELED
WAY
CURB
W
2'
MIN.
V
(7' MIN.)
SIGN
3'
MIN.
W
TRAFFIC BARRIER
EDGE OF
TRAVELED
WAY
SIGN WITH SUPPLEMENTAL
PLAQUE INSTALLATION
IN FILL SECTION
V
(7' MIN.)
SLOPE BREAK
SHOULDER
PRIMARY
SIGN
6'
MIN.
12' MIN.
W
5' MIN.
0" MIN.
3" MAX.
SUPPLEMENTAL
PLAQUE
EDGE OF
TRAVELED
WAY
EDGE OF
TRAVELED
WAY
SLOPE BREAK
SHOULDER
12' MIN.
W
4'
MIN.
V
(7' MIN.)
SIGN
SHOULDER
12' MIN.
W
EDGE OF
TRAVELED
WAY
SLOPE BREAK
4'
MIN.
V
(7' MIN.)
DITCH DITCH
SIGN
7' MIN.FLATTER THAN 3H:1V
2' MIN.STEEPER THAN 3H:1V
BACKSLOPE
SIGN POST FOUNDATION
V
(7' MIN.)
SIGN
EDGE OF
TRAVELED
WAY
6' to 12'
(2' MIN.)
Holes 1" four sides, 1.75" x 1.75" post
Bending design breakaway
Anchor sleeve
(one size larger than post)
10'-0" 10'-0"30'-0"
4"
4"
4"
4"
Passing Line or
Skip Line
Solid No - Passing Line or
Shoulder Stripping
Double Yellow
Centerline
Stripe Notes:
1. All Waterborn Markings shall comply with the Manual of Uniform
Traffic Control Devices.
2. Apply Waterborn Traffic Markings with glass beads per Section
634.05 of the FP-03. Glass beads shall be applied at a minimum rate of 6 pounds per gallon of paint..
3. Restripe shoulder and centerline to match existing.
4"
Traffic Sign Notes:
1. All sign materials and installation shall comply with the latest edition of the Manual on Uniform
Traffic Control Devices.
2. All sign panels shall conform to ASTM B 209.
Signs panels shall be constructed of 0.125"
Aluminum.
3. Sign Posts shall be 1.75"x1.75" galvanized square post conforming to ASTM A 1011, grade
55.
4. All sign sheeting shall comply with ASTM D4956
Type III High Intensity Prismatic Sheeting.
5. NCHRP 350 compliant breakaways required on all sign installations EXCEPT delineators.
Roadway Markings/Stripe Notes:
1. Restripe all new paved surfaces.
2. Contractor shall match existing shoulder and center stripping. Contractor shall document the existing centerline layout prior to reconstruction of the roadway.
3. All pavement markings shall be a 4" Type "B"
Waterborn Traffic Marking.
4. All traffic markings shall comply with the Manual of Uniform Traffic Control Devices and the
Federal Highway Administration FP-03, 634.05.
5. Prepare road surface and apply per mfg.
instructions.
PAVEMENT MARKING TYPICAL SHOULDER/CENTER STRIPE DIMENSIONS
NO SCALE
TRAFFIC SIGNS TYPICAL SHOULDER ROADWAY SIGNAGE
PROPOSED SELF ADHERING
WATERPROOFING
MEMBRANE ROLLED OVER
EXISTING TOP OF BARREL
PER SECTION 531 OF
NMSHTD SPECIFICATIONS
6" THICK PROPOSED
AGGREGATE BASE COURSE
PER SECTION 303 OF
NMSHTD SPECIFICATIONS
3" THICK PROPOSED
ASPHALT SURFACE PER
SECTION 423 OF
CONTRACT DOCUMENTS
ENGINEER FILL SUBBASE
#4 Bars
#4 Bars
#4 Bars
#4 Bars @ 12" c-c
B a r s c c
#4 Bars @ 12" c-c
#4 Bars @ 12" c-c
#4 Bars @ 12" c-c
B a r c c
B a r c c
#5 Bars
Box Culvert Notes:
1. Provide Object Marker signs per locations shown, D5/this Plan
Sheet.
2. Remove loose concrete from headwalls, wingwalls and center column and provide a concrete mortar (Class 2 Rubbed Surface) finish to all tops and streamside faces of headwalls, columns and wingwalls and for 6 inches down the back side of wingwalls per
Section 511.3.9.3 Concrete
Structures of the New Mexico State
Highway & Transportation
Department 2019 Edition. Unless otherwise approved by the
Engineer, use only hand tools or power-driven chipping hammers
(15-lb. class maximum) to remove concrete.
3. Remove trees and vegetation from both upstream and downstream aprons.
SECTION AA
SECTION VIEW
NO SCALE
CONCRETE APRON
PARTIAL PLAN
NO SCALE
CONCRETE WING WALL
SECTION VIEW
NO SCALE
CONCRETE APRON
PLAN VIEW
NO SCALE
CONCRETE APRON
DETAIL
CULVERT DETAILS
Concrete Apron
Concrete
Wingwall
Shoulder
8 - 12' x 10' Concrete Pre-Cast Box Culverts
50'-0"
Wire Enclosed Riprap
Earth Berm
Earth Berm
250'
8'
Earth Berm
2:1 or Flatter
Wire Enclosed
Riprap Class A
Wire Enclosed
Riprap Class A
Top of Earth Berm shall be constructed level with top of wing wall.
Geotextile
Wire Enclosed
Riprap Class A
2'
8'
Steel Stakes 5' Long at 8' Center each way.
18"
4'
Berms and Riprap Details
Earth Berm
NO SCALE
N
A A
EARTH BERM SECTION A-A
NO SCALE
Wire Enclosed Riprap
NO SCALE
General Notes:
1. Wire enclosed riprap shall use native materials or other suitable material.
2. Wire fabric for riprap shall be "W" or hexagonal mesh and meet the current of the NMDOT standard specifications for highway and bridge construction, current edition. Mesh shall be staked to the stream bed prior to aggregate placement.
3. Steel Stakes shall be galvanized steel pipe or 4" X 4" X 3/8" steel angles. Steel stakes shall project 6" above top of Rock filter dams.
4. Embed posts at least 18 in. deep, or adequately anchor, if in rock, with a spacing of 6 to 8 ft. and install on a slight angle toward the runoff source.
5. Place the aggregate on the mesh and then fold the mesh at the upstream side over the aggregate and secure it to itself on the downstream side with wire ties, or hog rings.
PLAN VIEW
| Sheets and Views |
| RR7 Culvert-COVER |
| RR7 Culvert-General Notes_2 |
| RR7 Culvert-SITE PLAN_3 |
| RR7 Culvert-Detour Detail_4 |
| RR7 Culvert-Box Culverts_5 |
| RR7 Culvert-Roadway Detail_6 |
| RR7 Culvert-Guardrail Detail_7 |
| RR7 Culvert-Traffic Signs_8 |
| RR7 Culvert-Apron Wing Wall_9 |
| RR7 Culvert-Riprap_10 |
File details come from the government source that posted it. Updated .