Amendment W911SG20R0040 0002 Released.pdf

PDF 143 KB Posted

Attached to
Ft. Bliss Access Control Points Federal contract opportunity
Solicitation number
W911SG20R0040
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

View the file

Other files for this federal contract opportunity

Other files attached to Ft. Bliss Access Control Points, newest first.
File Type Posted
DES Copy of W911SG20R0040.. Questions and Responses 08182020.pdf PDF
Site Visit Parking W911SG20R0040 0001.pdf PDF
Amendment W911SG20R0040 0001.pdf PDF
SOW PERSHING ACP_2020v1.pdf PDF
CASSIDY GATE FENCE PROJECT DRAWINGS 12may2020.pdf PDF
SOW CASSIDY ACP Revised05202020_2020v1KS.docx DOCX document
PERSHING GATE FENCE DRAWINGS_2020_d.pdf PDF
Solicitation W911SG20R0040 Released.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE SCHEDULE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide answ ers to the RFIs.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SG20R0040

X 9B. DATED (SEE ITEM 11)

31-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Aug-2020

CODE

MICC - FORT BLISS

111 PERSHING RD

FT BLISS TX 79916

W911SG 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911SG20R0040

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

RFIS

PAGE Section Para QUESTIONS RESPONSE #1 The SOW for each location identifies “cantilever” gates, however, the drawings reflect swing gates. Cantilever gates are sliding gates. Can you please confirm the gates are to be swing open/closed and not sliding?

FOR EACH LOCATIONS GATES SHALL

BE SWING OPEN/CLOSED ONLY.

#2 Shall the gates be manually operated, no gate opening hardware and equipment is necessary?

FOR EACH LOCATIONS ALL GATES

SHALL BE MANUALLY OPERATED.

#3 Section 1 Per Part 1-Section 1. Please clarify cantilever gates at the Cassidy Gate Access Control Point (ACP) at Fort Bliss Military Reservation. Please clarify cantilever gates at the Pershing Gate Access Control Point (ACP) at Fort Bliss Military Reservation.

Cantilever gate and a sliding gate is the location of the wheels that helps the gate move. A cantilever sliding gate rests and rolls on a wheel on the front bottom edge of the gate with a track supporting

FOR EACH LOCATIONS GATES SHALL

BE SWING OPEN/CLOSED ONLY.

wheels on the back edge. In contrast, a cantilever gate is held above the ground, moving along rollers running along the top and inside of the fence, with wheels attached to a vertical concrete. Generally, the space required to accommodate a sliding gate is the same as the width it covers, with a few extra feet for access.

#4 Section 1.3 Please clarify Part 1 – Section

1.3 gates at the Pershing Gate Access Control Point (ACP) at Fort Bliss Military Reservation.

The fencing fabric must be extended to within 2 inches of firm ground. Due to the slope of the road (Pershing) at proposed gate location per drawing. Gate would not accommodate an inside swing.

FOR GATES AT THE PERSHING GATE

ACP. THE FENCING FABRIC MUST BE

CONTINUE TO EXTENDED TO WITHIN 2

INCHES OF FIRM GROUND. THE GATES

SHALL BE AN OUTSIDE SWING.

#5 Please clarify fence at the Pershing Gate Access Control Point (ACP) at Fort Bliss Military Reservation. Will a pedestrian gate be required at south side of road at side walk for entrance?

FOR PERSHING GATE ACP AT FT BLISS

MILITARY RESERVATION.

NO PEDESTRIAN GATE SHALL BE

REQUIRED AT SOUTH SIDE OF ROAD

AT SIDE WALK FOR ENTRANCE.

#6 Will you require traffic control by our company or will you provide it?

WE SHALL REQUIRED TRAFFIC

CONTROL BY CONTRACTOR AT BOTH

LOCATIONS.

#7 As scope of work sate " The Contractor shall perform all work during normal work hours. " but cassidy gate stays working, do we need to consider another working hour for that specific gate ?

CONTRACT SHALL NOT BE

REQUIRED TO PERFORM WORK

OUTSIDE OF NORMAL WORK

HOURS. NO NEED TO CONSIDER

ANOTHER WORKING HOUR FOR

ANY GATE.

#8 I came across this project and was wondering if there are any guard booths or towers required for this project?

NOTHERE SHALL BE NO GUARD

BOOTHS OT TOWERS REQUIRED

FOR ANY OF THE PROJECTS.

(End of Summary of Changes)