Amendment W911SG20R0040 0002 Released.pdf
PDF 143 KB Posted
- Attached to
- Ft. Bliss Access Control Points Federal contract opportunity
- Solicitation number
- W911SG20R0040
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DES Copy of W911SG20R0040.. Questions and Responses 08182020.pdf | ||
| Site Visit Parking W911SG20R0040 0001.pdf | ||
| Amendment W911SG20R0040 0001.pdf | ||
| SOW PERSHING ACP_2020v1.pdf | ||
| CASSIDY GATE FENCE PROJECT DRAWINGS 12may2020.pdf | ||
| SOW CASSIDY ACP Revised05202020_2020v1KS.docx | DOCX document | |
| PERSHING GATE FENCE DRAWINGS_2020_d.pdf | ||
| Solicitation W911SG20R0040 Released.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE SCHEDULE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide answ ers to the RFIs.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SG20R0040
X 9B. DATED (SEE ITEM 11)
31-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Aug-2020
CODE
MICC - FORT BLISS
111 PERSHING RD
FT BLISS TX 79916
W911SG 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911SG20R0040
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
RFIS
PAGE Section Para QUESTIONS RESPONSE #1 The SOW for each location identifies “cantilever” gates, however, the drawings reflect swing gates. Cantilever gates are sliding gates. Can you please confirm the gates are to be swing open/closed and not sliding?
FOR EACH LOCATIONS GATES SHALL
BE SWING OPEN/CLOSED ONLY.
#2 Shall the gates be manually operated, no gate opening hardware and equipment is necessary?
FOR EACH LOCATIONS ALL GATES
SHALL BE MANUALLY OPERATED.
#3 Section 1 Per Part 1-Section 1. Please clarify cantilever gates at the Cassidy Gate Access Control Point (ACP) at Fort Bliss Military Reservation. Please clarify cantilever gates at the Pershing Gate Access Control Point (ACP) at Fort Bliss Military Reservation.
Cantilever gate and a sliding gate is the location of the wheels that helps the gate move. A cantilever sliding gate rests and rolls on a wheel on the front bottom edge of the gate with a track supporting
FOR EACH LOCATIONS GATES SHALL
BE SWING OPEN/CLOSED ONLY.
wheels on the back edge. In contrast, a cantilever gate is held above the ground, moving along rollers running along the top and inside of the fence, with wheels attached to a vertical concrete. Generally, the space required to accommodate a sliding gate is the same as the width it covers, with a few extra feet for access.
#4 Section 1.3 Please clarify Part 1 – Section
1.3 gates at the Pershing Gate Access Control Point (ACP) at Fort Bliss Military Reservation.
The fencing fabric must be extended to within 2 inches of firm ground. Due to the slope of the road (Pershing) at proposed gate location per drawing. Gate would not accommodate an inside swing.
FOR GATES AT THE PERSHING GATE
ACP. THE FENCING FABRIC MUST BE
CONTINUE TO EXTENDED TO WITHIN 2
INCHES OF FIRM GROUND. THE GATES
SHALL BE AN OUTSIDE SWING.
#5 Please clarify fence at the Pershing Gate Access Control Point (ACP) at Fort Bliss Military Reservation. Will a pedestrian gate be required at south side of road at side walk for entrance?
FOR PERSHING GATE ACP AT FT BLISS
MILITARY RESERVATION.
NO PEDESTRIAN GATE SHALL BE
REQUIRED AT SOUTH SIDE OF ROAD
AT SIDE WALK FOR ENTRANCE.
#6 Will you require traffic control by our company or will you provide it?
WE SHALL REQUIRED TRAFFIC
CONTROL BY CONTRACTOR AT BOTH
LOCATIONS.
#7 As scope of work sate " The Contractor shall perform all work during normal work hours. " but cassidy gate stays working, do we need to consider another working hour for that specific gate ?
CONTRACT SHALL NOT BE
REQUIRED TO PERFORM WORK
OUTSIDE OF NORMAL WORK
HOURS. NO NEED TO CONSIDER
ANOTHER WORKING HOUR FOR
ANY GATE.
#8 I came across this project and was wondering if there are any guard booths or towers required for this project?
NOTHERE SHALL BE NO GUARD
BOOTHS OT TOWERS REQUIRED
FOR ANY OF THE PROJECTS.
(End of Summary of Changes)