CASSIDY GATE FENCE PROJECT DRAWINGS 12may2020.pdf
PDF 336 KB Posted
- Attached to
- Ft. Bliss Access Control Points Federal contract opportunity
- Solicitation number
- W911SG20R0040
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment W911SG20R0040 0002 Released.pdf | ||
| DES Copy of W911SG20R0040.. Questions and Responses 08182020.pdf | ||
| Amendment W911SG20R0040 0001.pdf | ||
| Site Visit Parking W911SG20R0040 0001.pdf | ||
| Solicitation W911SG20R0040 Released.pdf | ||
| SOW CASSIDY ACP Revised05202020_2020v1KS.docx | DOCX document | |
| PERSHING GATE FENCE DRAWINGS_2020_d.pdf | ||
| SOW PERSHING ACP_2020v1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attached to existing fencing
ADA Compliant Pedestrian Gate to be added
Attached to existing fencing
2 ea. 25’ gates
Gate Poles & Fencing Required
2 ea. 20’ gates
Gate Pole Required
Gate Pole Required
Barrier Directly Within Approach Zone
1. Fencing & Gate heights will be a total of 8’ with top guard (current surrounding fenced barrier heights are 7’ with top guard).
2. Fence & Gate construction will be chain-link.
3. Will connect with perimeter barrier already emplaced.
4. Estimated construction time: 60 days from
NTP.
5. Will require all lane closures during construction.
6. If damaged, gate(s) would may need to be special ordered in order to replace (time intensive?).
7. Reflectorized signage for gates will have to be posted after completion of project (DPW work order).
8. Would require up to four vehicle entry gates and one pedestrian gate.
9. Vehicle gates to be positioned along the edge of the roadway when open.
10. Gates susceptible to wind.