Building_1316_L&A_Survey_Historical.pdf
PDF 1 MB Posted
- Attached to
- REPLACE GYM FLOOR BLDG 1316
- Solicitation number
- W911SG19B0016
About this file
Building 1316 L&A Survey Historical
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
From:
Sent:
To:
Cc:
Subject:
inspection results
STEWS-NRS-ER
MEMORANDUM FOR RECORD
SUBJECT: Inspection Results
8 Sept 98
1. Reference work order DP P032 8 P 01, 02 to inspect building 1316 for asbestos and lead-based paint prior to removal of the carpet, tile and mastic , renovation of the rest rooms and removal/replacement of the dropped ceiling .
2. An inspection of the work area and scope of work was performed by Mr. Trujillo of the Regulatory/Codes Enforcement Branch, NRS-ER .
3. Samples of the floor tile and mastic were sent to an accredited laboratory for asbestos analysis. The sample results show the floor tile does not contain asbestos , the mastic does contain asbestos .
4. Due to the floor tile mastic containing asbestos , the carpet, floor tile and mastic must be removed by a certified asbestos abatement team.
5. The ceiling tile does not contain asbestos .
6. Asbestos and lead-based clearances are granted for replacement of the ceiling, resurfacing of the gym floor and renovation of the rest rooms .
7. The white mastic on the duct work above the ceiling contains asbestos , do not remove the duct work or white mastic during the removal of the face diffusers.
8. Asbestos and lead-based paint clearances are granted for demolition of the CMU walls, ceiling plaster , wall cabinets and counter tops, accordion partitions and cut out an opening for a window in the gym interior wall .
9. Contact this office at 678-7049 if there are any changes in the scope of work.
JOE TALAMANTES
Inspector , NRS-ER
File details come from the government source that posted it.