SOLICITATION AMENDMENT 1 (SF 30)

View the file

Other files for this federal contract opportunity

Other files attached to BRIDGE REPAIR ROUTE 327, newest first.
File Type Posted
SOLICITATION_AMENDMENT_1_(CONFORM)-_W911SG-18-R-0074.pdf PDF
SOLICITATION_-_W911SG-18-R-0074.pdf PDF
Bridge_Repairs_Route_327_Drawings.pdf PDF
52.218-4201_UXO_POLICY.pdf PDF
WSMR_Visitor_Control_Program.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011184336-0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to:

1. Incorporate the RFIs questions and answ ers.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SG18R0074

X 9B. DATED (SEE ITEM 11)

10-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Sep-2018

CODE

MICC-FT BLISS W911SG

111 PERSHING RD

FT BLISS TX 79916

W911SG 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911SG18R0074

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

RFI QUESTIONS AND ANSWERS

W911SG‐18‐R‐R327

(aka W911SG‐18‐R‐0074) RFI Questions and Answers

1. Is there a specific type of percussion anchor that is required?

Yes, TL100‐TLA2‐5FT‐3MM‐Z.

2. What is the size of the pump at the stand pipe?

40 HP submersible turbine pump.

3. How often does the access roads to this location get shut down?

That’s completely Mission dependent; a concrete answer cannot be provided to this question. During construction, contractor shall note (within daily reports) the days that they were delayed or kicked out of the project site due to missions and the POP will be extended accordingly. SEE SECTION 2.6 OF THE SOW.

4. Is there any kid of schedule that we can be notified about to plan around?

During construction, contractor can call Mission Control every evening for mission closures the following day. SEE SECTION 2.6 OF THE SOW.

5. Is there access through the T or C side of WSMR?

No. Entrances to WSMR up range are either Stallion Range Center (SRC) located at most northern part of range near Socorro, Tuly Gate located on East side of range and Small Missile Range (SMR) located at most southern part of range.

6. The manufactures of the Concrete Cloth started this to us in an email “(Pullout out test must be done prior to installation to verify load capacity ‐ size of anchor and spacing might change depending on the results).”

Correct, see Plan Sheet #6 (Percussion Anchor Detail note). Contractor shall field verify the capacity for percussion anchors.

7. The manufacturer of the concrete cloth stated that the lad screws can be found in a collared package if they are zinc coated but the stainless cannot and will add much time to installation. Is it possible to use zinc plated instead of stainless steel?

No, zinc will eventually rust and cause issues in the future. Stainless steel screws (American made) shall be proposed and installed during construction.

(End of Summary of Changes)