Bridge_Repairs_Route_327_Drawings.pdf
PDF 958 KB Posted
- Attached to
- BRIDGE REPAIR ROUTE 327 Federal contract opportunity
- Solicitation number
- W911SG-18-R-R327
About this file
DRAWINGS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOLICITATION_AMENDMENT_1_(CONFORM)-_W911SG-18-R-0074.pdf | ||
| SOLICITATION_AMENDMENT_1_(MOD)-_W911SG-18-R-0074.pdf | ||
| SOLICITATION_-_W911SG-18-R-0074.pdf | ||
| 52.218-4201_UXO_POLICY.pdf | ||
| WSMR_Visitor_Control_Program.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TITLE
COVER
GENERAL NOTES
SITE PLAN
DEMOLITION PLAN
NEW WORK
MISC. DETAILS
GUARDRAIL DETAIL
DRAWING #
ISSUED FOR
CONSTRUCTION
DATE: 26 APR 2018
WS-85210-2018-G-GI-01
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
F18 Bridge Repair Route 327
COVER
S
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
WHITE SANDS MISSILE RANGE, NEW MEXICO
DESIGN BRANCH
T
C
I
R
A
E
M
A
F
O
E
C
A
L
P
H
T
R I
B
I
H
W
S
D
N
A
S
E
R
E
L
I
S
S
IM
Y
T
I
V
E
G
I
T
C
A
E
C
A
P
S
N
A
E
L
I
S
S
I M
GHB
GHB
Rafael Acosta
Samuel E. Morris
04/26/2018 NONE
ISSUED FOR
CONSTRUCTION
DATE: 26 APR 2018
WS-85210-2018-C-G-02
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
FY18 Bridge Repair Route 327
GENERAL NOTES
GHB
GHB
Rafael Acosta
Samuel E. Morris
04/26/2018 NONE
AutoCAD SHX Text
1. Contractor shall coordinate all work with existing conditions and Contractor shall coordinate all work with existing conditions and construction drawings. provide all equipment, material and labor as required for complete functional system. 2. All materials and equipment shall be installed in accordance with All materials and equipment shall be installed in accordance with manufacture's published recommendations, contract documents, industry standards and all federal, state, and local codes and amendments as adopted by the government for service intended by the Contracting Officer. The install of all materials and equipment shall be made by experience and licensed craftsman in a neat worksman like manner. All materials, supervision, labor, tool, costs and services necessary to completely install a functional system shall be furnished by the contractor. 3. The term "provide" used in the drawings and scope of work implies the The term "provide" used in the drawings and scope of work implies the contractor is to furnish, transport, install, connect, warrant, and start-up, inclusively. 4. The drawings are diagrammatic only but are required to be followed as The drawings are diagrammatic only but are required to be followed as closely as actual construction conditions and work of other trades permit. 5. Upon completion of work, provide manufacture's operating & maintenance Upon completion of work, provide manufacture's operating & maintenance manual for all equipment including replacement parts list. 6. Contractor shall submit a request for information (RFI) for any concerns Contractor shall submit a request for information (RFI) for any concerns or discrepancies between field conditions and new construction drawings to the Contracting Officer Representative (COR) during pre-construction and/or construction phase. 7. Should there be any concern by the contractor, the contractor is to Should there be any concern by the contractor, the contractor is to submit an RFI through the proper procedures to have his/her concerns resolved. 8. Contractor is to field verify all existing utilities prior to any excavation for Contractor is to field verify all existing utilities prior to any excavation for new signs post/pole foundations. 9. Remove and dispose of any existing rigid concrete. Contractor may dispose Remove and dispose of any existing rigid concrete. Contractor may dispose rigid concrete at the WSMR Hughes Reclamation Area located at the intersection of Watertown and and Hughes Ave. Concrete shall be free of rebar and/or all debris. 10. Contractor shall provide a topographic survey site plan with existing Contractor shall provide a topographic survey site plan with existing grading elevations and proposed new grading and drainage plan for approval. Cut and fill as necessary to achieve grades specified in the Cut and fill as necessary to achieve grades specified in the grading and drainage plan. 11. Crack and joint sealant material shall be hot-poured sealant conforming Crack and joint sealant material shall be hot-poured sealant conforming to the general and physical requirements of AASHTO M301 or AASHTO M173. 12. Routers shall be equipped with bits that are inch in diameter or greater Routers shall be equipped with bits that are inch in diameter or greater 12 inch in diameter or greater as dictated by the project requirements and which provide to 1 inch 34 to 1 inch depth of cut. 13. Cracks shall be routed and cleaned prior to crack and joint sealant Cracks shall be routed and cleaned prior to crack and joint sealant material applied. 14. Seal each joint such that after cooling, the level of the sealant is no Seal each joint such that after cooling, the level of the sealant is no more than inch below the pavement surface, but not above the 12 inch below the pavement surface, but not above the pavement surface. Use a squeegee to ensure that a 3 inch wide band is centered on the finished sealed crack. 15. Provide a Master Seal Tire Rubber Modified Surface Sealer (TRMSS) fog seal Provide a Master Seal Tire Rubber Modified Surface Sealer (TRMSS) fog seal or Government approved equal on the 100' stretch of Route 13 per manufacturer specifications. 16. Vehicular traffic will not be permitted on the pavement surface until Vehicular traffic will not be permitted on the pavement surface until sufficient curing time has elapsed to eliminate pickup or tracking of the sealant. 17. Apply water for dust control per section 158 of the FP-03. Contractor Apply water for dust control per section 158 of the FP-03. Contractor may utilize water standpipe located near Marcial Site on Route 5 (Northing = 3,705,029.310; Easting = 340,446.986 WGS84 Meters). Metering of water usage shall be required. Approximate distance from project site is 15.5 miles. 18. A borrow pit is available for use. Borrow pit is located near RR13/RR16 A borrow pit is available for use. Borrow pit is located near RR13/RR16 intersection. Approximate distance from project site is 2.2 miles.
AutoCAD SHX Text
1. All sign materials and installation shall comply with the latest edition All sign materials and installation shall comply with the latest edition of the Manual on Uniform Traffic Control Devices, Section 701 of NMSHTD and Plan Sheet 6. 2. All sign panels shall conform to ASTM B 209. Sign panels shall be All sign panels shall conform to ASTM B 209. Sign panels shall be constructed of 0.125" Aluminum. 3. All traffic signs with the exception of ADA parking signs shall have 2 All traffic signs with the exception of ADA parking signs shall have 2 - 1.75"x1.75" galvanized square post conforming to ASTM A 1011, grade 55. 4. All sign sheeting shall comply with ASTM D4951 Type III High Intensity All sign sheeting shall comply with ASTM D4951 Type III High Intensity Prismatic Sheeting. 5. NCHRP 350 compliant breakaways sleeves required on all sign NCHRP 350 compliant breakaways sleeves required on all sign installations. 6. All new traffic signs, specifications and placement distances are as All new traffic signs, specifications and placement distances are as per sign details and sign distances tables of the "standard highway signs" standard manual, 2004 edition. 7. All new signs are to be installed at designated areas and new sign All new signs are to be installed at designated areas and new sign posts should have a "slipbase system" & shall be installed at a safe clearance distance from the existing curb or edge of pavement. 8. Traffic signs in good condition, that can be salvaged, deliver to WSMR Traffic signs in good condition, that can be salvaged, deliver to WSMR Sign Shop in Building 1832. Other signs need to be dispose offsite.
AutoCAD SHX Text General Notes:
AutoCAD SHX Text Traffic Signs Notes::
AutoCAD SHX Text Traffic Control Plan Notes:
AutoCAD SHX Text
1. Develop and implement a Government approved traffic Develop and implement a Government approved traffic control plan for all elements of work. Traffic control plan shall be developed, implemented and maintained in accordance with the NMSHTD, Sections 618, 702 and Chapter 6 of the Manual of Uniform Traffic Control Devices. All work shall be performed in a manner that provides 24 hour per day, 7 days a week, vehicular access adjacent to project area and access to adjacent roads in a safe manner.
AutoCAD SHX Text Material Testing Notes:
AutoCAD SHX Text
1. During construction, material testing services shall be During construction, material testing services shall be obtained from an independent certified material third party testing laboratory.
EXISTING ROUTE
13 ASPHALT
PAVEMENT
SECTION
EXISTING 4 EA - Ø72" x 67' LENGTH
CORRUGATED METAL PIPE COVERED
IN CONCRETE
EXISTING PROJECT
BOUNDARY 20' x 100'
BITUMINOUS ASPHALT
ROADWAY
INLET
OUTLET
WS-85210-2018-C-SP-03
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
FY18 Bridge Repair Route 327
SITE PLAN
GHB
GHB
Rafael Acosta
Samuel E. Morris
04/26/2018 NONE
ISSUED FOR
CONSTRUCTION
DATE: 26 APR 2018
AutoCAD SHX Text N
FY18 BRIDGE REPAIR ROUTE 327- EXISTING SITE PLAN NOT TO SCALE
EXISTING 4 EA - Ø72" x 67' LENGTH
CORRUGATED METAL PIPE COVERED
IN CONCRETE
EXISTING PROJECT
BOUNDARY 20' x 100'
BITUMINOUS ASPHALT
ROADWAY
INLET
WS-85210-2018-C-G-04
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
FY18 Bridge Repair Route 327
DEMOLITION PLAN
GHB
GHB
Rafael Acosta
Samuel E. Morris
04/26/2018 NONE
ISSUED FOR
CONSTRUCTION
DATE: 26 APR 2018
AutoCAD SHX Text
FY18 BRIDGE REPAIR ROUTE 327 - DEMOLITION PLAN NOT TO SCALE
AutoCAD SHX Text
1. Remove existing traffic sign. Remove existing traffic sign. 2. Remove all bushes, shrubs and trees within inlet area to include side slopes, slope above Remove all bushes, shrubs and trees within inlet area to include side slopes, slope above concrete inlet and adjacent to CMP's. Total area encompasses approximately 1,200 SY. Greatest tree stump is approximately 4 inches in diameter. Extra precaution not to damage concrete and CMP's shall be taken when working near inlet. 3. Remove all bushes, shrubs and trees to include side slopes, slope above and adjacent to Remove all bushes, shrubs and trees to include side slopes, slope above and adjacent to CMP outlet. Total area encompasses approximately 1,500 SY. Greatest trees stump is approximately 4 inches in diameter. Extra precaution not to damage CMP's shall be taken when working near outlet.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Demo Work:
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GRADE & COMPACT
EXISTING CHANNEL & SIDE
SLOPES 50' BEYOND
CONCRETE CLOTH
C C
D D
E E
F F
WS-85210-2018-C-G-05
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
FY18 Bridge Repari Route 327
NEW WORK
GHB
GHB
Rafael Acosta
Samuel E. Morris
04/26/2018 NONE
ISSUED FOR
CONSTRUCTION
DATE: 26 APR 2018
AutoCAD SHX Text
FY18 BRIDGE REPAIR ROUTE 327 - NEW WORK NOT TO SCALE
AutoCAD SHX Text
1. Contractor shall provide a topographic survey site plan with existing grading elevations and Contractor shall provide a topographic survey site plan with existing grading elevations and proposed new grading and drainage plan for approval. 2. Provide 650 linear feet of crack seal within 100' x 20' roadway area. One hundred feet is Provide 650 linear feet of crack seal within 100' x 20' roadway area. One hundred feet is measured 50' from center of flow line each way. Provide 245 SY of Seal Master Tire Rubber Modified Surface Sealer (TRMSS) fog seal or Government approved equal. 3. Regrade channel, side slopes and slope above concrete culverts. Compact subgrade material Regrade channel, side slopes and slope above concrete culverts. Compact subgrade material to maximum density of 96% per ASTM D1557. A borrow pit is located near intersection of RR13/RR16 (Northing - 3,690,627.990; Easting - 352,067.879 WGS84 Meters). Refer to Plan Sheet 6. 4. Fill & compact outlet side with borrow pit material to a maximum density of 96% per ASTM Fill & compact outlet side with borrow pit material to a maximum density of 96% per ASTM D1557. Borrowed material shall be installed and compacted in layers that shall not exceed 6 inches. Total volume is approximately 4,200 CY. Refer to Plan Sheet 6. 5. Install a Geosynthetic Cementitious Composite Mat (Concrete Cloth CC8) from Milliken Install a Geosynthetic Cementitious Composite Mat (Concrete Cloth CC8) from Milliken Infrastructure or Government approved equal. Provide 5' percussion anchors, stainless steel #10 or #12 hex head self-tapping course thread screws, minimum 1.5 inch in length and SIKA FLEX caulk or Government approved equal. Refer to Plan Sheet 6. 6. Install 225 linear feet of metal guardrail and anchorages on each side of culvert structure Install 225 linear feet of metal guardrail and anchorages on each side of culvert structure per Section 606 of New Mexico State Highway Transportation Department (NMSHTD) and Plan Sheet 7. End sections of guardrail system shall be Flared Energy Absorbing Terminal (FLEAT) galvanized steel. 7. Install 4-each, 12"x36" Object Markers; two OM-3R and two OM-3L. Refer to Plan Sheet 2 Install 4-each, 12"x36" Object Markers; two OM-3R and two OM-3L. Refer to Plan Sheet 2 and 6.
AutoCAD SHX Text New Work:
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
40'
EXISTING 72" CMP INLET
WITHIN CONCRETE
REPAIR HEADWALL WITH
CONCRETE CLOTH & ANCHORS
EXISTING BITUMINOUS ASPHALT
PREPARED FOR CRACK/FOG SEAL
10' WIDE
DRIVING LANE
4 EA - Ø72" x 67' LENGTH
CORRUGATED METAL PIPE
COVERED IN CONCRETE
32' WIDE ROADWAY W/DIRT SHOULDER
67' FROM END OF CULVERT TO END OF CULVERT
CONCRETE
CLOTH
65'
A A
B1 B1
B1
10' WIDE
DRIVING LANE
A
6'
GEOSYNTHETIC
CEMENTITIOUS COMPOSITE
MAT HEADWALL
ROAD ELEV.
48"ID x 76"ID REUSED
CONCRETE CULVERTS
13'
BITUMINOUS
ASPHALT
20'
CONCRETE
CLOTH
32'
EXISTING 72" CMP OUTLET
WITHIN CONCRETE CLOTH
REPAIR HEADWALL WITH
CONCRETE CLOTH & ANCHORS
65'
B2
20'
6'
C
CONCRETE CLOTH
PER MANUFACTURER
INSTRUCTIONS
h=6' w=12'
20'
COMPACT SUBGRADE
MATERIAL TO MAXIMUM
DENSITY OF 96% PER
ASTM D1557
250'
D
E
CONCRETE CLOTH
PER MANUFACTURER
INSTRUCTIONS
w=6'
65' h=12'
COMPACT SUBGRADE
MATERIAL TO MAXIMUM
DENSITY OF 96% PER
ASTM D1557
85'
F
TOP OF ROUTE 327
TOP OF ROUTE 327
B2 B2
33'
20'
ANCHOR
TRENCH
BACKFILL ANCHOR
TRENCH AND
STABILIZE
ANCHOR
TRENCH
BACKFILL ANCHOR
TRENCH AND
STABILIZE
4" OVERLAP
CONCRETE CLOTH
SHINGLE LAPS IN DIRECTION OF
FLOW SECURE WITH FASTENER
SCREWS @ 6"-12" O.C.
F
L
O
W
T
Y
P
SEE ANCHOR
TRENCH DETAIL
COMPACTED
SUBGRADE (ROLLED
SMOOTH)
SEE ANCHOR
TRENCH DETAIL
CONCRETE CLOTH
PERCUSSION ANCHOR (5' LONG, 500 LB CAPACITY VERIFY
IN FIELD) STAGGER ANCHORS EVERY OTHER SEAM;
ANCHOR AT TOP AND BOTTOM TRENCH TO REMAIN EVERY
SEAM
PERCUSSION ANCHOR
(TYP.)
CONCRETE CLOTH
BACKFILL & COMPACT
ANCHOR TRENCH
1'
1'
PERCUSSION ANCHOR
(TYP.)
CONCRETE CLOTH
BACKFILL & COMPACT
ANCHOR TRENCH
9"
1'
1'
WS-85210-2018-C-G-06
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
FY18 Bridge Repair Route 327
DETAILS
GHB
GHB
Rafael Acosta
Samuel E. Morris
04/26/2018 NONE
ISSUED FOR
CONSTRUCTION
DATE: 26 APR 2018
AutoCAD SHX Text
INLET CMP TRANSVERSE SECTION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
PLAN VIEW: ROUTE 13 ROADWAY
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
CORRUGATED METAL PIPE LONGITUDINAL SECTION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TYPICAL CONCRETE CLOTH (GCCM) HEADWALL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
OUTLET CMP TRANSVERSE SECTION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
CONCRETE CLOTH CHANNEL OUTLET SECTION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text side slope: h:w = 6:12 = 1:2 (one to two)
AutoCAD SHX Text
CONCRETE CLOTH LONGITUDINAL OUTLET SECTION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
CONCRETE CLOTH CHANNEL INLET SECTION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text side slope: h:w = 12:6 = 2:1 (two to one)
AutoCAD SHX Text
CONCRETE CLOTH LONGITUDINAL INLET SECTION
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text NOTES: 1. CONCRETE CLOTH TO BE TOED INTO ANCHOR TRENCH CONCRETE CLOTH TO BE TOED INTO ANCHOR TRENCH 2. INTERMEDIATE TOE WALLS TO DEPTH REQUIRED CAN BE INTERMEDIATE TOE WALLS TO DEPTH REQUIRED CAN BE INSTALLED BY TURNING CONCRETE CLOTH VERTICAL 3. SECURE PANELS WITH STAINLESS STEEL SCREWS WITH SECURE PANELS WITH STAINLESS STEEL SCREWS WITH 1.5" STAINLESS STEEL FENDER WASHER 4. USE A FLEXIBLE SEALANT (LOCTITE) BETWEEN OVERLAP USE A FLEXIBLE SEALANT (LOCTITE) BETWEEN OVERLAP JOINT FOR ADDITIONAL JOINT PERFORMANCE 5. FOLLOW MILLIKEN GUIDELINES FOR HYDRATION FOLLOW MILLIKEN GUIDELINES FOR HYDRATION REQUIREMENTS
AutoCAD SHX Text
CHANNEL ISOMETRIC
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text NOTES: 1. FOR OPTIMUM PERFORMANCE ALL FOR OPTIMUM PERFORMANCE ALL JOINTS SHALL BE CONSTRUCTED WITH ADHESIVE WITH MECHANICAL FASTENERS 2. SLOPE DIMENSIONS, MATERIAL SLOPE DIMENSIONS, MATERIAL QUANTITIES ARE TO BE FIELD VERIFIED BY CONTRACTOR 3. FOR HYDRATION REQUIREMENTS REFER FOR HYDRATION REQUIREMENTS REFER TO MILLIKEN HYDRATION GUIDELINE
AutoCAD SHX Text
LOWER ANCHOR TRENCH DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
UPPER ANCHOR TRENCH DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
TYPICAL SECTION
NOT TO SCALE
24"
9"
8" MIN
2" MIN - 4" MAX
1"
SLIPBASE ASSEMBLY-BOLTING PROCEDURES:
1. ASSEMBLE SIGN POST AND ANCHOR POST WITH
BOLTS AND FLAT WASHERS PER BOLT AS SHOWN.
2. SHIM AS REQUIRED TO PLUMB POST.
3. TIGHTEN ALL BOLTS THE MAXIMUM POSSIBLE WITH 12 TO 15 INCH
WRENCH TO CLEAN BOLTS THREADS AND TO BED WASHERS AND
SHIMS.
4. LOOSEN EACH BOLT IN SEQUENCE AND RE-TIGHTEN BOLTS IN A
SYSTEMATIC ORDER TO THE PRESCRIBED TORQUE. DO NOT OVER
TIGHTEN.
5. TO PREVENT NUT LOOSENING, BURR THREADS OF BOLT AT JUNCTION
WITH NUT USING A CENTER PUNCH.
HOLES 1" FOUR SIDES,
1.75" X 1.75" POST
CORNER BOLT
FINISHED GRADE
BOLT STOP FOR
SIGN POST
ANCHOR SLEEVE
(ONE SIZE LARGER
THAN POST)
CORRUGATED METAL PIPE CULVERT CROSSING
BEGINNING LAP
INTERMEDIATE LAPEND LAP
SET POST VERTICAL. VARY
POST LENGTH AS REQUIRED
FOR GRADE
GUARDRAIL POST
& BLOCK
EXISTING CMP
BARRELS
EXISTING
AGGREGATE BASE
COURSE
EXISTING ASPHALT
SURFACE
SET POST VERTICAL. VARY
POST LENGTH AS REQUIRED
FOR GRADE
GUARDRAIL POST &
BLOCK
EXISTING CMP
BARRELS
M
I N
M
A X
Color:
Reflectorized Black &
Yellow Design.
OBJECT MARKER SIGN
NTS
EDGE OF SHOULDER
ANCHOR SLEEVE
(ONE SIZE LARGER
THAN POST)
HOLES 1" FOUR SIDES, 1.75" X
1.75" HOT GALVANIZED POST; 12
GAUGE W/NESTED POST
ANCHOR SYSTEM IN
ACCORDANCE WITH ASTM A 653
OR ASTM A 123
BENDING DESIGN
BREAKAWAY
WS-85210-2018-C-G-07
WHITE SANDS MISSILE RANGE, NEW MEXICO
ENGINEERING DIVISION
DIRECTORATE OF PUBLIC WORKS
DRAWING NUMBER
REVISIONS
DESCRIPTION
SHEET
CHIEF DESIGN BRANCH
CHIEF, ENGINEERING DIVISION
APPROVED
DATE SCALE
CHECKED
PROJECT MANAGER
RECOMMENDED
SUBMITTED
DESIGNED BY
DRAWN
NUMBER DATE
OF
PLATE
APPROVEDBY
FY18 Bridge Repair Route 327
GUARDRAIL DETAIL
GHB
GHB
Rafael Acosta
Samuel E. Morris
04/26/2018 NONE
ISSUED FOR
CONSTRUCTION
DATE: 26 APR 2018
AutoCAD SHX Text
SLIPBASE SYSTEM
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text NOTE: THERE ARE VARIOUS DEVICES APPROVED FOR THE SLIPBASE SYSTEM. THE DEVICES SHALL BE INSTALLED PER MANUFACTURE'S SPECIFICATIONS AND RECOMMENDATIONS. INSTALLATION PROCEDURES SHALL BE PROVIDED TO THE ENGINEER BY CONTRACTOR.
DIRECTION OF TRAVEL
| Sheets and Views |
| FY18 Bridge Repairs_Route 13-Cover_1 |
| FY18 Bridge Repairs_Route 13-General Notes_2 |
| FY18 Bridge Repairs_Route 13-Site Plan_3 |
| FY18 Bridge Repairs_Route 13-Demolition Plan_4 |
| FY18 Bridge Repairs_Route 13-New Work_5 |
| FY18 Bridge Repairs_Route 13-Misc. Detail_6 |
| FY18 Bridge Repairs_Route 13-Guardrail Detail_7 |
File details come from the government source that posted it.