PWS_(SLU_Centennial)_FInal.docx

DOCX document 41 KB Posted

Attached to
Senior Leaders Update Conference
Solicitation number
W911SG18Q0057
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

Conference Services

PART 1

GENERAL INORMATION

1. General. This is a non-personal services contract to provide a Conference Room equipped with laptop, projectors, remote mouse, wireless microphones and seating arrangements for monthly senior leader updates to the Fort Bliss senior military and civilian leadership. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. Description of Services/Introduction. The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to conduct the Senior Leader Update Conference at Fort Bliss Texas as defined in this Performance Work Statement (PWS), except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.

1.2. Background. Fort Bliss conducts monthly senior leader updates to keep the installation’s senior leaders informed of all events happening on the installation as well as providing an update of services available for soldiers and their family members. The Senior Leader Update Conference has been conducted on Fort Bliss for at least five (5) years.

1.3. Objectives. The objective of this contract is to ensure requirements are met to provide an environment conducive to hosting the installation’s senior leaders.

1.4. Scope. This contract includes all functions, tasks and responsibilities normally performed by event/conference planners/providers. The Contractor shall be responsible for room set-up, tables and chairs, audio visual requirements, cleanup of the room after the event for 250 people. The Contractor shall comply with all applicable laws and regulations, including but not limited to Federal Law, and Texas State Law(s), Occupational Safety and Health Administration (OSHA) regulations, Army and installation regulations.

1.5. Period of Performance. The period of performance shall be base-year plus four option periods:

Base-year:01 October 2018 to 30 September 2019
Option 1:01 October 2019 to 30 September 2020
Option 2:01 October 2020 to 30 September 2021
Option 3:01 October 2021 to 30 September 2022
Option 4:01 October 2022 to 30 September 2023

1.6. Quality Control. Quality Control is the responsibility of the Contractor. The Contractor is responsible for the delivery of quality services to the Government in accordance with (IAW) the terms and conditions contained in Federal Acquisition Regulation (FAR) 52.246-1 entitled, “Contractor Inspection Requirements” and applicable sub-clauses pertaining to quality control.

1.6.1. The Contractor shall develop, implement and maintain an effective Quality Control System which includes a written Quality Control Plan (QCP). The QCP shall implement standardized procedure/methodology for monitoring and documenting contract performance to ensure all contract requirements are met. The Contractors’ QCP must contain a systematic approach to monitor operations to ensure acceptable services are provided to the Government. The QCP, as a minimum, shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints. The Contractor shall provide to the Government their quality control documentation within 30 calendar days after contract award; changes to the QCP after award shall be submitted to the Contracting Officer (KO) and Contracting Officer’s Representative (COR) within five (5) working days prior to the proposed changes thereafter. After acceptance of the quality control plan the Contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to their QC System in regard to this contract.

1.6.2. Corrective Actions. At any time it is determined by the Contracting Officer that the quality control system, personnel, instructions, controls, tests, or records are not providing results which conform to contract requirements, action shall be taken by the Contractor to correct the deficiency. If a Contract Deficiency Report (CDR) is issued the Contractor shall develop a Corrective Action Plan (CAP) which identifies the root cause, Corrective Action (CA) for the root cause, CA for the specific non-conformance and CA to the root cause to prevent recurrence and a timeline for completion.

1.7. Quality Assurance. The Government shall evaluate the Contractor’s performance under this contract in accordance with (IAW) the Quality Assurance Surveillance Plan (QASP). This plan is a Government only document primarily focused on what the Government must do to assure that the Contractor has performed IAW the requirements of the PWS of this contract. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable deficiency rate(s) as illustrated within the PWS and Performance Requirements Summary (PRS).

1.7.1. Contracting Officer Representative (COR). The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.7.2. Post Award Conference/Periodic Progress Meetings. The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office IAW FAR 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. Minutes shall be taken at all meetings by the contractor.

1.8. Hours of Operation.

1.8.1. Normal Duty Hours. The Contractor is responsible for providing performance/service, between the hours of 0800-1700 once monthly for the dates listed below for the following months:

BASE YEAR:

16 October 2018 13 November 2018 18 December 2018 15 January 2019 12 February 2019 19 March 2019 16 April 2019 14 May 2019 18 June 2019 16 July 2019 20 August 2019 17 September 2019

Note: The scheduled dates for the option years will be provided as the options are exercised.

Except on Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.8.2. Federal Government Holidays.

1. New Year’s Day1st day of January
Martin Luther King Jr.'s Birthday3rd Monday of January
Presidents Day3rd Monday of February
Memorial DayLast Monday of May
Independence Day4th day of July
Labor Day1st Monday of September
Columbus Day2nd Monday of October
Veterans Day11th day of November
Thanksgiving Day4th Thursday of November
Christmas Day25th day of December

1. When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the proceeding Friday is observed as a legal holiday. This list of holidays relates to Government duty days and is not intended to supplement or otherwise alter the provisions of any Wage Determination regarding applicable paid holidays.

1. It is understood and agreed between the Government and the Contractor that observance of such days by Government personnel shall not be a reason for an additional period of performance, or entitlement of compensation except as set forth within the contract. In the event the Contractor’s personnel work during the holiday, the Contractor may reimburse them; however, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, other than their normal compensation for the time worked, unless stipulated otherwise. This provision does not preclude reimbursement for authorized overtime work if applicable.

1. If Government personnel are furloughed, the Contractor shall contact the Contracting Officer or the COR to receive direction. It is the Government’s decision as to whether the contract price/cost will be affected as a result of Government shutdown and/or furloughed Government employees.

1.9. Place of Performance. The work to be performed under this contract will be performed at The Centennial Banquet & Conference Center, BLDG 11199 SGT E Churchill ST, Fort Bliss, TX.

1.10. Type of Contract. The Government will award a fixed-price contract.

1.11. Security.

1.11.1. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete Level I AT Awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. Training will be conducted annually thereafter, if applicable. AT level I awareness training is available at the following website: http://jko.jten.mil

1.11.2. Access and General Protection/Security: Policy and Procedures. Contractor and all associated sub-Contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by Government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.

1.11.3. iWATCH Training. The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 16 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

1.11.4. OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. All contractor employees must complete annual OPSEC awareness training. OPSEC training is available at: https://securityawareness.usalearning.gov/opsec/index.htm

1.11.5. Physical Security. The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use IAW AR 190-13, The Army Physical Security Program. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.11.6. Key Control. N/A

1.11.7. Lock Combinations. N/A

1.11.8. Security of Classified Items, Systems and Information. The Contractor, as a general rule, shall not have access to classified information; however, should classified documents fall into the possession of the Contractor, the Contractor shall immediately contact the COR for disposition instructions.

1.12. Safety. The Contractor shall establish and maintain a safety plan of which a draft plan shall be submitted to the KO at the time of proposal. Contractor’s final Safety Plan shall be submitted no later than (NTL) 5 calendar days after contract award.

1.12.1. In order to provide safety control for protection to the life and health of employees and other persons; for prevention of damage to property, materials, supplies, and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with the following Safety Accident Prevention Standards: 29 CFR 1910, Occupational Safety and Health Standards; 29 CFR 1926, Safety and Health regulations for Construction; Army Corps of Engineers Manual 385-1-1, Safety and Health Requirements Manual. The Contractor shall comply with the above and all other applicable DoD, Army, Federal, State and Local safety and health requirements.

1.12.2. Reporting of Fire and Safety Hazards. The Contractor shall train personnel to recognize fire and safety hazards and encourage personnel in the performance of their duties to report fire and safety hazards and unsafe conditions to their supervisor. The Contactor shall take corrective action to remedy reported deficiencies IAW the terms of this contract. The COR shall be notified of deficiencies beyond the terms of this contract.

1.12.3. Environment and OSHA. The Contractor shall comply with all local, State, and Federal environmental and occupational safety laws, rules, and regulations. Any apparent conflict between compliance with such local, State, and Federal environmental and occupational safety laws, rules, regulations, and compliance with the requirements of the contract shall be immediately brought to the attention of the Contracting Officer or authorized representative for final resolution. The Contractor shall notify the Contracting Officer or authorized representative in writing in addition to any verbal notification of such conflict. The Contractor shall be liable for all fines, penalties, and costs which result from violations of, or failure to comply with, all such local State, or Federal laws, rules, and regulations. All unsafe acts or conditions fostered by the Contractor or Contractor personnel may be grounds for the Contracting Officer or authorized representative to halt any and all Contractor performance with a commensurate deduction of monies due to the Contractor until such unsafe conditions are corrected. The Contractor shall take due caution not to endanger personnel during performance of this contract. Upon discovery of a serious hazard such as, but not limited to, fire, or large fuel spill, the Contractor shall notify the Contracting Officer or designated representative and COR.

1.12.4. Reporting Mishaps. The Contractor shall adhere to reporting of mishaps IAW AR 385-10, The Army Safety Program and DA Pam 385-40, Army Accident Investigations and Reporting. In addition the Contractor shall report: Contractor accidents involving Army property and personnel.

1.12.5. Personnel Safety. The Contractor shall immediately correct all safety deficiencies upon notification of the deficiencies by the Contracting Officer, designated representative or COR, and shall notify the Contracting Officer of the corrective action to be taken.

1.13. Personnel. For purposes of this paragraph, the term “personnel” or “employee(s)” refers to any person performing work related to this contract, including but not limited to, the Contractor’s employees, agents, representatives, or Subcontractors. The Contractor shall staff this effort with trained, competent and capable employee(s) for the discipline they are assigned to. Contractor personnel shall present a clean, neat and professional appearance. The Contractor shall ensure that employees meet all applicable federal, state, local, and installation certification, licensing, medical requirements, and qualifications to perform all assigned tasks and functions as defined in this contract prior to commencement of work. The Contractor shall not permit any personnel to work under this contract if such person is identified by a Government authorized representative to the Contractor as a potential threat to the health, safety, security, general wellbeing, or operational mission of the Army and Fort Bliss, Texas. All Contractors’ personnel shall comply with installation security and access procedures and the Contractor’s final Safety Plan.

1.13.1. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid U.S. state driver’s license, certificates and permits, applicable for the type and class of vehicle being operated.

1.13.2. Contractor’s personnel shall either be a United States Citizen or authorized to work in the United States or possess a valid U.S. Immigration T-151 or I-94, Alien Registration Card.

1.13.3. Speaking, Reading, and Understanding English. Contractor shall hire and staff personnel who can communicate with Government representatives and where reading, understanding, and discussing environmental, health, and safety warnings are an integral part of an employee’s duties, Contractor’s employee shall be able to understand, read, write, and speak the English language fluently. English shall be the only language used with regard to this contract for written correspondence, discussions and other business transactions.

1.13.4. Identification of Contractor Employees. The Contractor (to include Subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include Subcontractors) employees shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include Subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued identification cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor and Subcontractor personnel changes. All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.13.5. Conflict of Interest & Employment of Government Personnel. The Contractor shall not knowingly employ any person who is a U.S. Government employee if employing that person would create a conflict of interest. Additionally, the SP shall not knowingly employ any person who is an employee of the Government, either military or civilian, unless such person seeks and receives written approval according to DOD 5500.7-R, Joint Ethics Regulations (JER) by the individual’s commander or director. A copy of the authorization will be provided to the COR. In addition, the Contractor is prohibited from employing Government Quality Assurance Representatives (QAR) whom the Contractor knows or should have known are responsible for monitoring any contracts/subcontracts awarded to the service provider.

1.13.6. Conduct of Employees. Employees shall conduct themselves IAW installation policies concerning conduct and DOD 5500.7-R, Joint Ethics Regulation.

1.13.7. Employee Uniforms. N/A

1.13.8. Personnel Health and Hygiene. Contractor personnel shall present a clean, neat and professional appearance. Personnel shall comply with sanitation and food safety standards IAW TB MED 530.

1.13.9. Contractor Vehicles. N/A

1.13.10. Contractor Advertising. The Contractor shall not place or display advertising of any kind on Government property.

1.13.11. Special Qualifications. N/A

1.13.12. Key Personnel: The follow personnel are considered key personnel by the Government:

1. Project Manager (PM)/alternate PM. The Contractor shall provide a PM who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the KO within 2 calendar days after contract award, thereafter any changes shall be provided five (5) business days prior to expected change and no less than 24-hours after unplanned changes. The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The PM or alternate shall be available between 8:00 a.m. thru 1:30 p.m., Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons.

1.13.13. Supervision of Contractor Employees. The Government will not exercise any supervision or control over Contractor or Subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or Subcontractor employees.

1.14. Training. N/A

1.15. Data Rights. N/A

1.16. Phase In/Phase Out Period. N/A

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms.

2.1. Definitions. Federal Acquisition Regulation (FAR), Dictionary of US Army Terms, AR 310-25 and Authorized Abbreviations and Brevity Code, AR 310-50, are the references for definitions and acronyms not listed below.

2.1.1. Contract Administrator. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.

2.1.2. Contractor. A supplier or vendor awarded a contract to provide specific supplies or services to the Government. The term used in this contract refers to the prime.

2.1.3. Contracting Officer. A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

2.1.4. Contracting Officer’s Representative (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.5. Controlled Area. A controlled space extending upward and outward from a specified point. This area is typically designated by a commander or director, wherein sensitive information or operations occur and requires limitations of access.

2.1.6. Defective Service. A service output that does not meet the standard of performance associated with the PWS.

2.1.7. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.8. Government-Furnished Property (GFP) or Government Property (GP). Property in the possession of, or directly acquired by, the Government and subsequently made available to the Contractor.

2.1.9. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.10. Physical Security. Actions that prevent the loss or damage of Government property.

2.1.11. Property Administrator (PA) or Plant Clearance Officer (PLCO). An authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of the Contractor.

2.1.12. Quality Assurance. The Government procedures to verify that services being performed by the Contractor are acceptable IAW established standards and requirements of this contract.

2.1.13. Quality Assurance Specialist. An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the Contracting Officer in these areas.

2.1.14. Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

2.1.15. Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.16. Subcontractor. One that enters into a contract with a prime Contractor. The Government does not have privet of contract with the Subcontractor.

2.1.17. Work Day. The number of hours per day the Contractor provides services IAW the contract.

2.1.18. Work Week. Monday through Friday, except for Federal holidays unless specified otherwise.

2.2. Acronyms.

ACORAlternate Contracting Officer's Representative
AFARSArmy Federal Acquisition Regulation Supplement
AQLAcceptable Quality Level
ARArmy Regulation
ATAntiterrorism
CDRContract Deficiency Report
CFRCode of Federal Regulations
CMRContract Manpower Reporting
CONUSContinental United States (excludes Alaska and Hawaii)
CORContracting Officer Representative
COTSCommercial-Off-the-Shelf
DADepartment of the Army
DFARSDefense Federal Acquisition Regulation Supplement
DODDepartment of Defense
FARFederal Acquisition Regulation
FPCONForce Protection Condition
HIPPAHealth Insurance Portability and Accountability Act of 1996
JERJoint Ethics Regulation
JTRJoint Travel Regulation
KOContracting Officer
OCIOrganizational Conflict of Interest
OCONUSOutside Continental United States (includes Alaska and Hawaii)
PAProperty Administrator
PLCOPlant Clearance Officer
POCPoint of Contact
PRSPerformance Requirements Summary
PWSPerformance Work Statement
QAQuality Assurance
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Program
TETechnical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. Government Furnished Items and Services.

3.1. Services. N/A

3.2. Facilities. N/A

3.3. Utilities. The Government will provide water, electricity, and waste disposal. If utilities are furnished, the following is required: The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4. Equipment. N/A

3.5. Materials. N/A

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Items and Responsibilities.

4.1. Contractor Furnished Items. Everything included in this paragraph and its subparagraphs is basic to the contract and should be included in the contract price.

4.1.1. The Contractor shall provide all labor, supervision, transportation, vehicles, supplies, equipment, materials, and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.1.2. Facilities: The Contractor shall provide a conference room at the Centennial Banquet & Conference Center, BLDG 11199 SGT E Churchill ST, Fort Bliss, TX. Any signage shall conform to standard Army/Installation signs/format and must be approved by the KO and COR in writing prior to placement.

4.2. Secret Facility Clearance: N/A

4.3. Materials. N/A

4.4. Equipment. The Contractor shall furnish the conference room with, tables and chairs, audio visual requirements and technical support to include LCD projectors, screens, microphones, sound system and a laptop.

4.5. Responsibilities of the Contractor.

1. The Contractor shall provide a safe working environment for key consultants and all persons in his/her employ as prescribed by Engineering Manual (EM) 385-1-1, “General Safety Requirements” and 29 CFR 1910 “Occupational Health and Safety”. The Contractor shall be responsible for all damages to persons and property that occur in connection with the work and service under this contract, without recourse against the Government.

1. Contractor shall exercise extreme caution to protect building finishes, private property, military property, etc., from damage during the performance of these contract requirements. Contractor shall be responsible for all loss or damage or whatsoever kind and nature to all Government property, while in the performance of these contract requirements, which result in whole or in part from the negligence or omissions of Contractor, any of his Subcontractors or any employee, agent or any representative of the Contractor or Subcontractor(s).

1. The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work.

d. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

PART 5

SPECIFIC TASKS

5. General. The Contractor shall provide all skilled personnel, equipment, supplies, tools, materials, supervision, and other items necessary to perform this prescribed project as defined in this PWS to meet the performance requirements, except for those items specified as Government furnished property and services.

5.1.1. Required Presentation Equipment. The Contractor shall be responsible for furnishing and set up of required presentation equipment, audio visual requirements, technical support, laptop computer, LCD Video and Computer video projectors, 15’x15’ projection screens, table microphones, wireless microphone on a stand, and additional microphones and sound system.

5.1.2. All required presentation equipment shall be in a functional and serviceable condition with all associated components one hour prior to the scheduled meeting.

5.1.3. Accommodations. The Contractor shall be responsible for furnishing and setup of tables, and chairs necessary to accommodate 250 personnel, IAW the senior leader update seating diagram provided by the COR.

5.1.4. All tables and chairs shall be clean, serviceable, and of a similar color and style.

5.1.5 All table, chairs, and presentation equipment shall be removed and the conference room put back to the original condition after the meeting has ended.

5.2. Deliverables.

5.2.1. Solid Waste Diversion Report. The Army is mandated by Sec.2 (e)(ii) of Executive Order 13514, to divert at least 50 percent of non-hazardous solid waste by the end of fiscal year 2015. The Contractor shall provide a monthly Solid Waste Diversion Report to the Directorate of Public Works, Solid Waste program manager, 915-568-7979, ronald.h.baca.civ@mailmil and COR.

5.3. Inspection Requirements. The Contractor shall provide quality services and/or products IAW this contract.

5.3.1. When the Contractor’s performance is unsatisfactory; a CDR shall be issued. If a CDR has to be issued, the Contractor shall reply in writing, giving the reason for the unsatisfactory condition, and what corrective action has been taken; and procedures to prevent recurrence.

5.4. Contractor Manpower Reporting (CMR).

5.4.1. The Contractor shall report ALL Contractor labor hours (including Subcontractor labor hours) required for performance of services provided under this contract for the Army via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/, and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services.

5.4.2. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil/. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website”.

PART 6

APPLICABLE PUBLICATIONS AND FORMS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

6.1. The Contractor (to include Subcontractors) must abide by all applicable regulations, publications, manuals, and local policies and procedures.

Engineering Manual (EM) 385-1-1, General Safety Requirements 29 CFR 1910, Occupational Health and Safety DoD 5200.08-R, Physical Security Program 32 CFR 147.24, The National Agency AR 190-13, The Army Physical Security AR 385-10, The Army Safety Program DA Pam 385-40, Army Accident Investigations and Reporting

6.2. Forms. Mandatory records and report forms are listed below.

DD254 – Department of Defense Contract Security Classification Specification, available at http://www.esd.whs.mil/Directives/forms/dd0001_0499/

Attachment 1:

Performance Requirements Summary

Performance Objective (Include PWS Ref)
Performance Standard
Performance

Threshold Incentive / disincentive

The Contractor shall be responsible for furnishing and setup of a conference room with required presentation equipment, audio visual requirements, technical support, laptop computers, LCD Video and Computer video projectors, projection screen, table microphones, wireless microphone on a stand, and additional microphones.
All required presentation equipment shall be in a functional and serviceable condition with all associated components one hour prior to the scheduled meeting.
100%
First failure will result in the issuance of a Contractor Deficiency Report (CDR) Continuance of not meeting performance standard (2 or more) a corrective action plan to include payment withholding will be developed at the discretion of the KO.

Note: Government surveillance of Contractor performance is not limited to the Performance Objectives as outlined in this PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.

File details come from the government source that posted it.