Armor_OSUT_5_Questions.pdf
PDF 64 KB Posted
- Attached to
- Armor OSUT 5 Federal contract opportunity
- Solicitation number
- W911SF-19-R-0027
About this file
ARMOR OSUT 5 Specific Questions
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ARMOR_OSUT_1_-_5_Pre_Award_Addendum_1.pdf | ||
| W911SF19R00270004.pdf | ||
| Attachment_4_Performance_Assessment_Questionnaire.pdf | ||
| ARMOR_OSUT_1_-_5_General_Questions.pdf | ||
| W911SF19R00270003.pdf | ||
| Blank_Bid_Breakdown_Form.xlsx | XLSX spreadsheet | |
| W911SF-19-R-0027-0002,_5Jul19.pdf | ||
| W911SF-19-R-0027-0001,_1Jul19.pdf | ||
| 0001.zip | ZIP file | |
| Statement_of_Work_-_Control_Tower_(Small_Arms).pdf | ||
| AR_OSUT_5_WD_GA20190118_dtd_12Apr19,_wdr,_26Jun19.pdf | ||
| W911SF-19-R-0027.pdf | ||
| Statement_of_Work_-_Control_Tower_(Small_Arms)_CMU_Version.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Armor OSUT 5 Questions
1. 10.e on the Solicitation references a spreadsheet with a separate cost breakdown to be submitted. Do you have a template for this breakdown we should use? If not, please provide direction on the cost breakdown you are seeking.
2. Can one QC handle multiple roles?
Answer: One person can fulfill the duties of the QC/Superintendent/SSO for one range at a time.
3. Can we have only one SSO?
Answer: One person can fulfill the duties of the QC/Superintendent/SSO for one range at a time.
4. Please allow an additional week for RFI’s.
Answer: This is a time sensitive requirement so an additional week will not be granted.
5. Please extend the bid due date to 8/13/2019.
Answer: This is a time sensitive requirement so no extensions are being considered.
6. Could I get the attendees list - for your site visit on 07/10/19?
7. All Ranges Listed –
No site drawings are provided. Will site drawings be provided? Answer: No site drawings will be provided for the towers.
I assume erosion control will not be necessary, as these towers should disturb much less than one acre? Answer: All local and State laws must be followed. This will have to be determined by the design team. Fragmenting per site is not allowed.
Is any survey or site work needed from an engineering stand point?
Answer: This is a design build project. Contractor responsible for a site assessment (per range) for determining the amount of site work required. A survey can be performed as needed.
8. OSUT 5 Is a concrete slab required under the 260’ CTA?
Answer: Yes, a continuous slab from end to end of CTA . See drawings