About this file

Attachment 4 Experience Information

View the file

Other files

File Type Posted
Sign-in_16_OCT_2012.pdf PDF
W911SF-12-R-0024-0003_RFI.pdf PDF
Amendment_W911SF-12-R-0024_-0002.pdf PDF
NY_MATOC-Amendment_0001.pdf PDF
Attachment1NY120052DBA.pdf PDF
Attachment6NotionalSpecs.pdf PDF
Attachment7NotionalDrawings.pdf PDF
Attachment2NY120007DBA.pdf PDF
Attachment3ExperienceOverview.doc DOC document
NY.pdf PDF
Attachment5PPQ.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXPERIENCE INFORMATION SHEET

(Document will expand as narrative is inserted. Limit size to two pages.)

1. Project No. (from Experience Overview Sheet):

2. Project Name & Client:

3. Location work was performed:

4. Date work was completed (must be within last 6 years):

a. If work is still ongoing, date work was 50% completed:

b. If not 50% completed, explain percentage of completion:

5. Final cost of this project:

6. Clearly describe what part of the work was performed by the firm for which the experience information is submitted. Provide dollar magnitude for each of the following categories if multiple categories are selected.

a. Building renovations, including floors, doors, walls, windows, and external facades:

b. Repair/replacement of major building systems such as electrical, mechanical, and HVAC:

c. Civil work, including earthwork and drainage structures:

d. Environmental work:

7. Work was performed as a: Prime Joint Venture Subcontractor

SOLICITATION NUMBER: W911SF-12-R-0024

PROJECT TITLE: USMA- West Point Construction MATOC Attachment 4

File details come from the government source that posted it. Updated .