Contract Type: Install Window Blinds SAR

IJO#: CE-19412-9J, CE-19413-9J

Project Location: Bldg.738 / 740 Sherman and Lee Barracks SOW Date: 08/20/2019

PROJECT DESCRIPTION:

The intent of this project is to Install (400) existing window blinds from Lee and Sherman Barracks. New blinds will match existing window opening dimensions.

PROJECT DETAILS:

General Provision:

Work Schedule / Coordination

Work to be performed during normal working hours (8:00am to 4:30pm) Monday through Friday.

Coordinate work with government personal and other contractors on site.

INTERIOR PAINTING:

SCOPE: This section includes removal and installation of window blinds.

a. Work to be Performed:

(1) Install (400) new window 1" Aluminum Mini Blinds, Wand Tilt, Cord Lift, No Valance and associated hardware.

MATERIALS:

a. 1" Aluminum Mini Blinds, Wand Tilt, Cord Lift, No Valance.

SUBMITTALS: The following items shall be submitted for approval. All submissions shall be clearly marked to show specific item proposed for use. Prior to delivery of any materials to the job site, all items shall be approved by the Contracting Officer.

Descriptive Literature/Color Charts Window Blinds “ “ “ “

CLEANING: All tools, equipment, materials and debris shall be removed from the site upon the completion of the work. It shall be incumbent upon the Contractor to protect all finished surfaces under this contract until accepted by the Contracting Officer or representative.

QUALITY CONTROL: The Contractor shall establish and maintain quality control for operations under this section to assure compliance with contract requirements and maintain records of quality control for all materials, equipment, and construction operations, including but not limited to the following:

a. Submittals

b. Inspections

c. Preparation

d. Application

e. Protection

A copy of these records, tests, etc., as well as the records of corrective action taken shall be furnished to the Government as directed by the Contracting Officer.