PRS-_Triple_Chair_Lift_Rope_Tow_(003).docx
DOCX document 70 KB Posted
- Attached to
- SKI CHAIR LIFT MAINTENANCE
- Solicitation number
- W911SD-19-R-0006
About this file
PRS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911SD-19-R-0006.pdf | ||
| W911SD-19-R-0006-PPQ.docx | DOCX document | |
| TRIPLE_CHAIR_LIFT_SOW.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Requirements Summary
Prevent Maint. Triple Chair Lift & Rope Tow
| SERVICE |
| PWS PARAGRAPH NUMBER |
| STANDARD |
| ACCEPTABLE QUALITY LEVEL |
| SURVEILLANCE |
METHOD
% of Service To Total Contract Price
Trained and competent personnel
| Work shall be performed by Competent persons – qualified and trained in all phases of aerial Tramway, ski lift and handle tow lift equipment maintenance, inspection and repair. Must be experienced as a wire rope inspector. |
| 1.0% |
100%
100%
Personnel Protection Equipment and procedures.
| Contractor shall insure all proper PPE is utilized and proper procedures are followed. IAW OSHA 29 CFR 1926, ANSI B77.1., EM 385-1-1 |
| 1.0% |
100%
100%
Control Barriers
| Contractor shall provide written report documenting all work inspected and performed on all equipment as stated in contract |
| 1.0% |
| 5% |
100%
Reporting
| Contractor shall provide written report documenting all work inspected and performed on all equipment as stated in contract |
| 1.0% |
| 100% |
100%
Safety and Health
Contractor shall insure work is performed IAW EM 385-1-1, ANSI B77.1., OSHA 29 CFR 1926.
100%
100%
Additional Response
Contractor shall respond to additional inspection/s and/or emergencies within 24 hours once notified, during ski season months. All other timeline outside the ski season will be arranged between COR & contractor.
| 100% |
| 100% |
image1.png
File details come from the government source that posted it.