W911SA25QA086 Attachment 01 PWS.pdf

PDF 185 KB Posted

Attached to
Tanker Purge at Lexington, KY
Solicitation number
W911SA25QA086
Issued by

About this file

This is a Performance Work Statement (PWS) for tank purge and inspection services at the Army Reserve facility in Lexington, Kentucky. The contractor must provide services to steam and/or air purge and visually inspect 60 M967 military fuel tanks in accordance with technical manuals, with all work to be completed within 30 days of scheduling.

The contractor is responsible for providing all personnel, equipment, supplies, tools, and supervision needed to perform the services. Key requirements include physically accessing tank interiors to remove residue, disposing of residual fuel up to 1% of tank capacity, performing visual inspections to ensure tanks meet CFR 49 standards, and maintaining proper documentation of any damages or repairs needed. The contractor must submit monthly invoices and obtain prior approval from the Contracting Officer Representative (COR) for any additional repairs. The government will provide water access and possible indoor facility access during inclement weather, but no other equipment or materials. The contractor must also comply with various security requirements including AT Level I training, OPSEC training, and background checks for facility access.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Tank Purge and Inspection Services 310TH Expeditionary Sustainment Command (ESC)

PART 1

GENERAL INFORMATION

1. General: This is a non-personal services contract to provide tank purge and inspection services for 60 M967 military fuel tanks as defined in this Performance Work Statement (PWS) at the Army Reserve facility located at 151 Opportunity Way, Lexington, Kentucky. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, tools, materials, supervision, and other items and non-personal services necessary to perform tank purge and inspection services for 310th ESC maintenance activities as defined in this Performance Work Statement except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.

1.2 Background: The Army Reserves has assorted bulk transportation tanks of various sizes used for transportation and distribution of Class 3 flammable fluids. While the Department of Defense (DOD) is exempt from Department of Transportation (DOT) standards for tank purging and storing because the DOD does not conduct transportation in commerce, the DOD maintains its own standards for tank purging and storing. Any tank used for Class 3 flammable liquids being prepared for storage or changing liquids type must be purged. Some tanks, but not all must have an annual inspection certification as specified in the tank’s technical manual. The 310th ESC maintains and stores these tanks for Army Reserve units at Lexington, Kentucky. The storage of tanks meets Army Reserve unit needs. One of the few capabilities not held in these shops is the ability to properly purge, clean, inspect, and certify tanks for storage and changing liquid types.

1.3 Objectives: Obtain efficient and cost-effective tank purge and inspection services for the 310th ESC in order to safely store, maintain, and utilize bulk transportation tanks.

1.4 Scope: Services performed under this contract primarily include tank purging and inspection in accordance with (IAW) applicable Army technical manuals associated with the types of tanks being serviced. The Contractor shall accomplish tank maintenance to include parts and labor if approved by the Contract Officers Representative prior to work being accomplished.

1.5 Period of Performance: The period of performance shall be completed within 30 days of time of award.

1.6 General Information

1.6.1 Quality Control: Quality Control is the responsibility of the Contractor. The Contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.212- 4, Contractor Terms and Conditions – Commercial Items). A formal Quality Control Plan (QCP) is not required for this commercial service. However, the Contractor shall maintain an inspection system commensurate with commercial practices to ensure the Contractor only tenders for acceptance those items or services that conform to the requirements of this contract.

1.6.2 Quality Assurance: The Contracting Officer Representative (COR) will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a Government only document primarily focused on what the Government must do to assure that the Contractor has performed in accordance with the requirements of the contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. Non-conforming services shall be re-performed at no additional cost to the Government. If non-conforming services are recurring, cannot be re-performed, or the services fail, the Government may reject the non-conforming service(s) and document the Contractor’s performance record accordingly. The Government may also issue a Contract Action Report (CAR) in which the Contractor will be required to respond with the development of a Corrective Action Plan (CAP) which identifies the root cause, Corrective Action (CA) for the root cause, CA for the specific non-conformance, and the date the CAs will be complete. The Government may also reduce the payment to reflect the value of the services performed or may perform the services and charge the Contractor for any related cost incurred and/or may terminate this contract for cause.

1.6.3 Non-Conforming Services: When a Contractor’s performance is identified as unsatisfactory (e.g. does not meet contract PWS requirements and/or work schedules and/or timeframes) it is considered a non-conformance. The Contractor shall reply within the specified timeframe upon receipt of a CAR from the COR or Contracting Officer (KO).

Non-conformance shall be classified in one of three categories:

1.6.3.1 Level I: A Level I CAR describes a deficiency on a product or service and is not a systemic breakdown of a process or system. It includes those nonconformances that are minor in nature and can be promptly corrected by the contractor, present no need for root cause analysis, no determination if other contract requirements are affected, present no need for further preventive action, and do not materially reduce the usability of the supplies, services, construction, or deliverables. While the Government must document the nonconformance and the contractor must correct the nonconformance, further actions and Government follow-up are not required, and no written response from the contractor is needed. Level I CARs are considered closed immediately upon issuance.

1.6.3.2 Level II: A Level II CAR describes deficiencies in a contractor’s processes or systems but are not significant deficiencies. Level II CARs shall require the contractor to correct the nonconformance, perform root cause, and develop and provide a Corrective Action Plan (CAP) acceptable to the government. Some examples of systems affected may be quality inspection/management systems, and Contractor Business Systems (CBS) identified in DFARS 242.70, or issues such as:

• Multiple deficiencies on products or services indicating a systemic issue throughout the process, or,

• An escalation of repetitive Level I CARs for the same or similar nonconformance demonstrating the contractor is failing to institute effective corrective action and/or failing to implement effective quality and/or internal control(s).

1.6.3.3 Level III: A Level III CAR describes deficiencies in a contractor’s system that is affecting a contracts or program’s ability to meet cost, schedule or performance requirements, or are:

• A significant deficiency pursuant to DFARS 252.242-7005(b), “Contractor Business Systems” (CBS), or,

• A failure to respond to Level II CARs, or to remedy a recurring nonconformance.

• The contractor shall be required to provide a CAP that is acceptable to the government.

1.6.3.4 Level IV: A Level IV CAR documents a critical nonconformance of such serious nature that is issued to the contractor’s business segment or corporate management for their attention to both the nonconforming condition and the company’s corrective action, or when a Level III CAR has been ineffective. A Level IV CAR will result in a mandatory review of available contractual remedies, such as cost disallowance, reduction or suspension of payments, revocation of government assumption of risk of loss, CBS disapproval, or suspension of all product and service acceptance activities. Contractual remedies will be implemented IAW applicable FAR/DFARS clauses and/or ACC Acquisition Instructions if applicable. Action to suspend product or service acceptance will be accomplished via a Level IV CAR. The contractor shall be required to provide a CAP that is acceptable to the government.

Overarching CAR Process Flow. The following outlines the normal process flow for the corrective action process.

Follow the steps provided within the Product Data Reporting and Evaluation Program (PDREP) CAR Module User Guide.

NOTE: Steps in subparagraphs (f)-(j) below do not apply to Level I CARs as they are considered closed immediately upon issuance.

a. Identify a contract nonconformance.

b. Create a CAR.

c. Review the CAR.

d. Coordinate and approve the CAR.

e. Issue the CAR to the contractor.

f. Receive and review the contractor’s CAP.

g. Accept/reject the contractor’s CAP.

h. Oversee contractor corrective action using a risk-based approach.

i. Receive notification from the contractor that corrective action is accomplished.

j. Verify corrective action was accomplished satisfactorily.

k. Close the CAR.

1.6.4 The Contractor will be notified of Government inspection results within 5 business days. The Contractor shall acknowledge receipt of the inspection results via email or letter within 2 business days. The Contractor may be notified of inspection results verbally or via email. Verbal notifications of defective work will be confirmed in writing.

When Government inspectors are unable to contact the contractor to notify the contractor of inspection results, acceptance or rejection of work will be made based on the initial inspection.

1.6.5 Performance Evaluation Meetings: The Contractor Point of Contact (POC) shall meet with the COR prior to start of the contract. However, meetings may be held whenever deficiencies are noted by the COR. A mutual effort shall be made to resolve all problems identified.

1.6.6 Federal Government Holidays: The Contractor is not required to perform services on any Federal holiday.

New Year’s Day 1st day of January Martin Luther King Jr.'s Birthday 3rd Monday of January Presidents Day 3rd Monday of February Memorial Day Last Monday of May Juneteenth 19th day of June Independence Day 4th day of July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11th day of November Thanksgiving Day 4th Thursday of November Christmas Day 25th day of December

1.6.7 Hours of Operation: The Contractor is responsible for conducting business, between the hours of 730 am and 4:00 pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.8 Place of Performance: The work to be performed under this contract may be completed at the requesting maintenance shop. The Contractor shall coordinate with the COR to determine if the requirement will be completed at the Government site or a Contractor facility within 50 miles of the requesting maintenance shop. The Government will be responsible for transportation within the 50-mile radius.

1.6.9 The Contractor shall remove all hazardous material generated from the purging of tanks from the site and dispose of in accordance with all legal, statutory, and environmental policy requirements.

1.6.10 The Contractor shall take all necessary precautions against accidental spills, equipment and procedural failures as well as possible contamination, regardless of work location.

1.6.11 Type of Contract: The Government will award a firm fixed price contract.

1.7 Antiterrorism (AT) and Operations Security (OPSEC)

1.7.1 AT Level I Training. All Contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date, new employee hire, or effective date of incorporation of this requirement into the contract, whichever is applicable. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 60 calendar days after completion of training by all employees and subcontractor personnel. AT Level I Awareness Training is available at the following website: http://jko.jten.mil.

1.7.2 OPSEC Level I Training. Per Army Regulation 530-1, Operations Security, all contractor employees, to include subcontractor employees, requiring access to `Army installations, facilities and controlled access areas shall complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days after contract start date, new employee hire, or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 60 calendar days after completion of training by all employees and subcontractor personnel. OPSEC Awareness for Military Members, DOD Employees and Contractors is available through the Center for Development of Security Excellence (CDSE) at the following website: https://www.cdse.edu/Training/eLearning/GS130.

1.7.3 Access and general protection/policy and procedures. The contractor and all associated sub-contractor employees shall provide all information required for background checks necessary to meet installation access requirements. These checks will be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor and all associated sub-contractors shall obtain background checks when unescorted access is required for employees without a CAC and associated background investigation. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. Contractor employees who will be entering Army-controlled installations or facilities and who do not possess a valid CAC, including subcontractor employees, will provide a valid and original form of ID (State driver’s license, passport, and so forth, which complies with Public Law 109-13 (The REAL ID Act of 2005) and Army Regulation 190- 13 (The Army Physical Security Program)). This is to prove identity (for enrollment into the automated installation entry (AIE) database if available) and issue a visitor pass or card. Security personnel processing an applicant will screen documents for evidence of tampering, counterfeiting, or other alteration. Non-CAC-holder Contractors and vendors requiring physical access to a single Army installation or facility, but who do not require access to a DOD computer network, will have a Government-employee sponsor to provide the contractual agreement with a cover memorandum signed by a verifying officer vouching for the need for long-term access to the installation. The expiration date of the issued card will be the end date of the contract or visit, or the expiration date of the sponsor’s access control card, whichever occurs first. Sponsors will be held responsible for notifying the DES (or appropriate local installation access issuing office) of terminated contract employees and for turn in of expired or revoked ID. Contractors will be processed through the Contractor Verification System for issuance of a CAC, if physical access to multiple Army installations and/or access to a DOD computer network is required. Non-CAC-eligible contractors will be issued local access ID that will only be used for physical access onto the single installation or facility where it is issued. Commanders and directors will use a locally produced, temporary issue, local access ID system pass with expiration date, or a pass issued by AIE or the Defense Biometric Identification System (DBIDS), if available.

1.7.4 If derogatory information is contained in the background check, unescorted access may be denied in accordance with Army Directive 2014-05 (Policy Implementation Procedures for Common Access Card Credentialing and Installation Access for Un-cleared Contractors).

a. COR will notify the 310th ESC G34 of individuals who have been denied access.

b. 310th ESC G34 will complete an Access Denial Letter and forward to COR along with an Access Control Denial Waiver Package.

c. COR provides Access Denial Letter and Access Control Denial Waiver Package to the Contractor POC.

1.7.5 In cases where an un-cleared Contractor employee, including any subcontractor employee, is denied access based on derogatory information, the individual may request a waiver.

a. Contractor POC informs the COR that employee desires to submit an Access Control Waiver Denial Application.

b. COR will forward the individual’s completed packet to the 310th ESC G34 for review.

http://jko.jten.mil/ https://www.cdse.edu/Training/eLearning/GS130

c. 310th ESC G34 will review the Access Control Denial Waiver Application in consultation with the Fort McCoy Access Control NCIC-III POC.

d. 310th ESC G34 provides a recommendation to 310th ESC Senior Leadership.

e. 310th ESC Senior Leadership, or designee, makes a final fitness determination.

f. 310th ESC G34 will notify the COR of the final fitness determination.

g. If a waiver is granted, the 310th ESC G34 will provide an Access Approval Letter to the COR. COR will then provide copy of the Access Approval Letter to the Contractor POC and the government representative for facility access and retain a copy for the COR’s files.

1.7.6 Individuals may be denied unescorted access if derogatory information includes, but is not limited to, the following:

a. The NCIC-III contains criminal information about the individual that causes the Senior Commander to determine that the individual presents a potential threat to the good order, discipline, or health and safety of the installation.

b. The installation is unable to verify the individual's claimed identity based on the reasonable belief that the individual has submitted fraudulent information concerning his or her identity in the attempt to gain access.

c. The individual has a current arrest warrant in NCIC, regardless of the offense or violation.

d. The individual is currently barred from entry or access to a Federal installation or facility.

e. The individual has been convicted of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking in humans, drug possession with intent to sell or drug distribution.

f. The individual has a U.S. conviction of espionage, sabotage, treason, terrorism, or murder.

g. The individual is a registered sex offender.

h. The individual has been convicted of a felony within the past 10 years, regardless of the offense or violation.

i. The individual has been convicted of a felony firearms or explosives violation.

j. The individual has engaged in acts or activities designed to overthrow the U.S. Government by force.

k. The individual is identified in the Terrorist Screening Data Base (TSDB) as known to be suspected of being a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity. When this capability becomes available to DoD, security personnel performing installation access control personnel will strictly follow the Federal Bureaus on Investigation’s published engagement protocols.

1.7.7 iWATCH Training. All Contractor employees, including subcontractor employees, will be briefed on the local iWATCH program (training standards provided by the requiring activity Anti- terrorism Officer (ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. The Contractor shall coordinate with the COR to get the current copy of this training within 5 days of contract start. This training is to be completed within 30 calendar days of Award and within 30 calendar days of new employees commencing performance with the results reported to the COR no later than 60 calendar days after award.

1.7.8 Activity Regulations for Contractor Access and Use of Premises

a. Follow all current Army Security Regulations concerning strict visitor control and preservation of all Government assets. Immediately report all security concerns to the COR, who will notify the Security Office.

b. The Contractor shall adhere to requirements as directed in Federal Acquisition Regulation – 52.222-54, Employment Eligibility Verification. Contractors shall be enrolled in the Department of Homeland Security E- Verify Program. Information on registration for and use of the E-Verify program can be obtained via the Internet at the Department of Homeland Security Web site: http://www.dhs.gov/E-Verify.

c. The Contractor shall ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.

d. The Contractor shall return within two business days all issued U.S. Government Common Access Cards, installation badges, and/or access passes to the COR or Designated Representative (DR) when the contract is completed or when a Contractor employee no longer requires access to the installation or facility.

e. The Contractor shall comply with all personnel identity verification procedures. Employees must be accompanied by an authorized Government employee at all times while providing services in secure areas.

f. During Force Protection Conditions (FPCON) Charlie and Delta, services are discontinued, and services shall resume when the FPCON level is reduced to level Bravo or lower.

1.8 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; performs inspections necessary in connection with contract performance; maintains written and oral communications with the Contractor concerning technical aspects of the contract; issues written interpretations of technical requirements, including Government drawings, designs, and specifications; monitors Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinates availability of Government furnished property; and provides site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.9 Designated Point of Contact (POC) and an alternate Point of Contact: The Contractor shall provide a designated POC who shall be responsible for the competent performance of the work required under the specifications of this contract NLT 5 business days after contract award and as changes occur. The name and contact information of the POC and an alternate, who shall act for the Contractor when the POC is absent, shall be designated in writing to the COR. The POC or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The POC or alternate shall be available between 7:30 am to 4:00 pm Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. The POC and alternate shall be able to read, write, speak, and understand English.

1.9.1 Supervision of Contractor Employees: The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract.

1.10 Key Control: The Contractor shall establish and implement methods of ensuring that all keys issued to the Contractor by the Government are not lost, or misplaced, and are not used by unauthorized persons. No keys issued to the Contractor by the Government shall be duplicated. NOTE: All references to keys include key cards. In the event keys, other than master keys, are lost or duplicated, the Contractor shall re-key or replace the affected lock or locks;

however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.10.1 The Contractor shall report the occurrences of a lost key immediately to the COR no later than the next business day.

http://www.dhs.gov/E-Verify

1.10.2 It is the responsibility of the Contractor to prohibit the use of keys issued by the Government by any persons other than the Contractor’s employees. It is also the responsibility of the Contractor to prohibit the opening of locked areas by the Contractor’s employees to permit entrance of persons other than Contractor’s employees engaged in the performance of assigned work in those areas.

1.10.3 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

1.11 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms:

2.1 Definitions: As used throughout this PWS, the following terms shall have the meaning set forth below:

2.1.1 Business Day: Shall mean any day banking transactions can be conducted in New York City, NY, USA and does not include any day which is a Federal or state holiday in such location.

2.1.2 Contract Administrator. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.

2.1.3 Contractor. A supplier or vendor awarded a contract to provide specific supplies or services to the government.

The term used in this contract refers to the prime.

2.1.4 Contracting Officer (KO). A person with the authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note: The KO is the only individual who can legally bind the Government.

2.1.5 Contracting Officer's Representative (COR). An employee of the U.S. Government appointed by the KO to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations.

This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. Note: This individual does NOT have authority to change the terms and conditions of the contract.

2.1.6 Cultivated Areas. Any area of earth within the boundaries of the facility that has been improved or intentionally planted such as: mulched areas, flower beds, hedge rows, or parking lot green spaces.

2.1.7 Defective Service. A service output that does not meet the standard of performance associated with the PWS.

2.1.8 Deliverable. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.9 Designated Representative. A Government employee or Contractor employee performing duties in the position approved by the COR to assist the COR with duties such as coordinating schedules with Contractors to perform work at a facility, provide facility access to Contractors, and perform inspection of Contractor’s work and provide results of their inspections back to the COR, both orally and in writing. A DR does not have the authority to assign work to Contractors or discuss Contractor performance issues; but may discuss these issues with the COR for potential further action. The only individuals with the authority to discuss Contractor performance issues are warranted KOs and CORs specifically delegated this authority by a warranted KO via an appointment letter.

2.1.10 Government-Furnished Property (GFP), Government-Furnished Equipment (GFE), or Government- Furnished Facility (GFF). Property or area in the possession of, or directly acquired by, the Government and subsequently made available to the Contractor.

2.1.11 His/Her. Wherever used in the PWS, the term “his” is meant to be synonymous with “her” unless otherwise stated. The same shall be true for him and her.

2.1.12 Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When Key Personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.13. Mechanically Remove (Vegetation). Means utilizing physical activity to remove or inhibit the growth of unwanted vegetation. Mechanical, or manual, vegetation control techniques manage vegetation populations through physical methods that remove, injure, kill, or make the growing conditions unfavorable. Some of these methods cause direct damage to unwanted vegetation through complete removal or causing a lethal injury. Other techniques, such as trimming to the height of desirable vegetation (generally grass or turf), may alter the growing environment by increasing the temperature of the soil and depriving the plants of carbon dioxide or oxygen. Mechanical control techniques shall be selective so as to have a minimal impact on non-targeted (desirable) vegetation.

2.1.14 Physical Security. Actions that prevent the loss or damage of Government property.

2.1.15 Policing (of Facility). Means to remove loose or wind-blown litter, debris, dead tree branches, brush, and leaves from all readily accessible grounds and parking areas.

2.1.16 Quality Assurance. The Government procedures to verify that services being performed by the Contractor are acceptable in accordance with established standards and requirements of this contract.

2.1.17 Quality Assurance Specialist. An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the KO in these areas.

2.1.18 Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

2.1.19 Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.20 Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.21 Workday. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.22 Work Week. Monday through Friday, except for Federal holidays, unless specified otherwise.

2.2. Acronyms:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement aFOS Area Facility Operations Specialist AQL Acceptable Quality Level AR Army Regulation AT Anti-Terrorism

ATO Anti-Terrorism Officer CA Corrective Action CAP Corrective Action Plan CFR Code of Federal Regulations CMR Contract Manpower Reporting CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative CORT Contracting Officer Representative Tracking COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD254 Department of Defense Contract Security Requirement List DES Directorate of Emergency Services DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense DR Designated Representative FAR Federal Acquisition Regulation FOS Facility Operations Specialist FSC Federal Service Code FPCON Force Protection Condition GFE Government Furnished Equipment GFF Government Furnished Facilities GFP Government Furnished Property HIPAA Health Insurance Portability and Accountability Act of 1996 IAW In accordance with iRAPT Invoicing Receipt Acceptance Property Transfer JKO Joint Knowledge Online KO Contracting Officer MEP Military Equipment Parking NET No earlier than NLT No later than OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OSHA Occupational Safety and Health Act/Agency PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RIP Reduction in Payment RD Readiness Division SDS Safety Data Sheet SUS Supplier Self Services TE Technical Exhibit TSDB Terrorist Screening Data Base UIC Unit Identification Code USAR United States Army Reserve USARC United States Army Reserve Center USARC United States Army Reserve Command WAWF Wide Area Work Flow

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. Government Furnished Items and Services

3.1 The Government will not provide any services, equipment, or materials required to complete the work under this contract.

3.2 The Government will provide access to water outlets solely for the purpose of completing the work under this contract. The Contractor (to include subcontractors) shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.3 The Government may provide access to indoor Government facilities to support the completion of the work if there is inclement weather that prevents the work from being completed outdoors.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Items and Services: The Contractor shall furnish all personnel, labor, materials, supplies, tools, labor, equipment, supervision, and services needed to perform this contract and meet the requirements of the

PWS.

PART 5

SPECIFIC TASKS

5. Specific Tasks

5.1 Purging of Tanks: The Contractor shall provide services to steam and/or air purge and visually inspect 60 M967 military fuel tanks in accordance with appropriate technical manual or bulletin listed in part 6. Depending on the Army’s mission, the need for steam or air purge may vary. It is expected that the Contractor be able to perform both steam and air purging. The Government will communicate the type of purge required at the time of scheduling which is reflected in technical manuals based off the model of tanker. This requirement shall be completed within 30 days of scheduling date.

5.1.2 It is anticipated that residual fuel will not exceed one percent of each tank’s capacity. The Contractor is responsible for disposal of residual fuel up to one percent of each tank’s capacity. If there is more than one percent of residual fuel, the Contractor shall contact the Government to coordinate removal of residual fuel. The Government is not responsible for disposal costs for fuel more than one percent of the tank’s capacity in the event the Contractor removes the residual fuel without prior coordination with the COR.

5.1.3 The Contractor shall physically access inside of the tank and completely wipe/remove residue from the side walls and/or bottom of the tank.

5.1.4 The Contractor will perform visual inspections for purging services and will ensure that no in-service tank will deteriorate below the specified limits identified in Code of Federal Regulations CFR 49 standards. The inspections must also show that no structural defect is evident that may cause leakage from or failure of the tank.

5.1.5 If at any time the Contractor is using a chemical for purging or repairs, it needs to meet the requirements in ATP 4-43. The Contractor shall maintain onsite and have readily available an inventory listing of all hazardous materials used onsite. Safety Data Sheets (SDS) will be maintained and readily available for any chemicals or hazardous materials used onsite. It is the Contractor’s responsibility to properly train his personnel on the existence and safe use and storage of chemicals and hazardous materials.

5.2 Annual Inspection Services: N/A

5.3 Equipment: A joint inspection will be conducted by the Contractor and Government POC at the time of possession to determine if there is any damage to the equipment. The Contractor shall document any damage to Government equipment upon taking possession of the equipment regardless of if the equipment is being purged on a Government or Contractor site. Documented damages will be certified by the Government at the time of documentation. Failure to do so will result in the Contractor being liable for the damages. A copy of the equipment inspection worksheet will be provided to the Government each time damage is documented.

5.4 Additional Repairs: Any repairs identified during visual or annual inspections will be handled on a case-by-case basis. In the situation where the Contractor determines that further repairs be conducted on the equipment, they are to submit a Purchase Request (PR) defining the type of repairs required. The PR for repairs shall include the issue found, the labor time for repairs, the hourly labor rate, and at least two (2) quotes annotating the necessary materials. The Contractor shall ensure the estimates identify material type, manufacture, quantity and cost. The Contractor shall submit the PR to the COR within five business days of the determination. The COR will review the request and respond to the Contractor within five business days. All repairs to include labor will be submitted to the Government and approved prior to Contractor beginning any repairs or completion of work. The Contractor shall not order and parts or conduct any repairs without written authorization from the COR to do so. Government personal on site do not have the authorization to approve any parts or repairs. In a situation where the Contractor completes repairs that have not been authorized by the COR, the Government will not be responsible for payment of those repairs.

5.5 Invoicing: All inspections/purges/repairs shall be completed within 30 days of Government request and invoiced within 30 days of service completion date. The Contractor shall produce an invoice on a monthly basis for submission to the COR for concurrence prior to submission into Procurement Integrated Enterprise Environment (PIEE), Work Area Work Flow (WAWF) module. When invoicing for repairs the Contractor shall provide at a minimum, the approved PR, an actual vs. estimated statement and receipt document(s). The actual vs. estimated statement will identify why expenses were over/underestimated. The Contractor’s documents shall be detailed to ensure tracking can be done on all items. Once the invoice is submitted to the COR, it must be reviewed and approved by the COR prior to submission into WAWF. It is suggested that the Contractor provide a draft invoice with the appropriate documentation to the COR prior to submitting it into PIEE to ensure it will be approved by the Government.

PART 6

APPLICABLE PUBLICATIONS

6. Applicable Publications: The Contractor (to include subcontractors) must abide by all applicable regulations, publications, manuals, and local policies and procedures.

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. Attachments Listing

7.1 Attachment 01 - PWS

7.2 Attachment 02 - AT-OPSEC

7.3 Attachment 03 - Wage Determination Log

File details come from the government source that posted it. Updated .