This is a 70-page solicitation document (W911SA25Q3048) for parking lot sweeping services at two Army Reserve facilities in California, with a base period from February 1, 2025 to January 31, 2026, plus four one-year options and a potential six-month extension. The services are required at Wilkson Hall ARC in Bakersfield (semi-annual sweeping) and BT Collins ARC/AMSA #98 in Sacramento (annual sweeping), with annual sweeping to occur by October 15 each year and semi-annual sweeping approximately 6 months later but before June 30.
The solicitation is set aside 100% for Service-Disabled Veteran-Owned Small Businesses under NAICS code 561790 with a $9 million size standard. Quotes are due by 10:00 AM CST on January 10, 2025, with questions due by 10:00 AM CST on January 9, 2025. Required submissions include a signed SF 1449, completed supplemental information, completed price schedule, and any signed amendments. The work involves using a regenerative air or vacuum sweeper to maintain compliance with Clean Water Act and California State Water Resources Control Board requirements. No site visit will be conducted. The contracting activity is the Army Mission and Installation Contracting Command at Fort McCoy.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911SA25Q3048 - Amendment 1.pdf | ||
| W911SA25Q3048 - Attachment 1 - Price Schedule - CUI.xlsx | XLSX spreadsheet | |
| W911SA25Q3048 - Attachment 2 - AT OPSEC.pdf | ||
| W911SA25Q3048 - Attachment 1 - Price Schedule - CUI.xlsx | XLSX spreadsheet | |
| W911SA25Q3048 - Attachment 3 - Drawings.pdf | ||
| W911SA25Q3048 - Attachment 4 - Service Ticket.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911SA25Q3048 03-Jan-2025
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
10:00 AM 10 Jan 2025
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911SA9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
LAURIE LAGO
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0012200543
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MICC - FT MCCOY
BLDG 1108 SOUTH R ST
FORT MCCOY WI 54656-5153
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W90XCV 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
63D REGIONAL SUPPORT COMMAND, USAR
230 RT JONES ROAD
MOUNTAIN VIEW CA 94043-1809
TEL: 650-526-9419 FAX: 650-526-9477
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
X 8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$9,000,000
NAICS:
561790
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF70
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
SUPPLEMENTAL INFORMATION
1. An Award for this requirement will be made pursuant to FAR 13, Simplified Acquisition Procedures.
2. The period of performance is anticipated to be 01 February 2025 to 31 January 2026 (or subsequent date), with four (4) one (1) year options periods, and a six (6) month option to extend services.
3. Quotes shall be emailed to Solicitation POC: Laurie.E.Lago.civ@army.mil. Quotes are due to the Government on or before the date/time listed on the solicitation in central time. It is the contractor’s responsibility to ensure their quote is received by the due date and time. As an Addendum to FAR 52.212-1, contractor shall submit all items in accordance with the Supplemental Information by the solicitation closing date and time. The contractor SHALL provide all required documents with submission of quotes.
Signed SF 1449 Completed information from the Supplemental Information section of the solicitation Completed Price Schedule Attachment Signed Amendments (if applicable)
If all required documents are not provided with the quote submission, your quote MAY NOT be considered for award.
4. If a quote is based on a teaming/partnering relationship or a joint venture, the contractor shall provide, with the quote, all required solicitation information for all parties including a copy of the teaming/partnering or joint venture agreement. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering or joint venture relationship.
5. This procurement is Set Aside as 100% Service-Disabled Veteran Owned Small Business NAICS Code 561790 with a size standard of $9.0 Million.
6. Period for acceptance of quotes. The contractor agrees to hold the prices in its quote firm for 90 calendar days from the date specified for receipt of quotes.
7. Site visit: ***A site visit will not be held ***
8. Written questions must be furnished to the Government no later 10:00 a.m. CT on 9 January 2025 in order to ensure a timely response is provided by the solicitation closing date. All questions are to be submitted in writing at the time indicated in the solicitation or they may not be addressed before solicitation closing date; therefore, contractors are advised to submit questions as soon as possible. Please provide your company name, telephone, point of contact, e-mail address, and solicitation number on all questions. The Government will respond to questions via the issuance of an amendment which incorporates the question and the Government’s response.
9. SAM Unique Entity ID: ______________________________.
10. TAXPAYER ID #: ______________________________.
11. CAGE CODE: ______________________________.
12. SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: An Active SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.
a. A SAM Unique Entity ID is required for SAM registration. If your company does not have a DUNS #, obtain one by calling 800-333-0505.
b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 561790, or a NAICS of similar business size, under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.
c. If the prospective awardee for this request for quotes is not actively registered in the SAM database by close of solicitation, including NAICS 561790, or a NAICS of similar business size, under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful actively registered contractor.
d. Within the SAM Representations and Certifications, please ensure you company has selected that you wish to bid on, or currently hold Department of Defense (DoD) issued or DoD funded Contracts. The DFARS provisions in SAM must also be completed by solicitation closing date and time.
e. Prospective contractors who have not completed electronic annual representations and certifications at http://www.sam.gov/ in conjunction with required registration in the System for Award Management (SAM) database, shall complete and submit FAR 52.212-3 Alternative 1 Offeror Representations and Certifications - Commercial Items and DFARS Representations and Certifications in SAM to be eligible to receive an award for this solicitation.
13. Contract Administrator: TBD at time of award.
If you have questions pertaining to this contract after contract award (i.e. questions regarding delivery, invoice procedures, etc.), please request assistance from the Contract Administrator. Be sure to include the contract number in your request for assistance. Requesting contract administration assistance from any other individual could result in a delayed response.
14. Contracting Officer: TBD at time of award.
15. Contracting Officer’s Representative (COR): TBD at the time of Award.
16. The Government intends to evaluate quotes and award a contract without discussions. Therefore, the contractor’s initial offer should contain the contractor’s best terms from a price and technical standpoint.
However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all quotes if such action is in the public interest and waive informalities and minor irregularities in quotes received.
17. Service Contract Reporting (SCR): Contractors will report manpower data relating to the performance of service contracts into the system for Award Management (SAM) (https://sam.gov) consistent with existing service contract reporting requirement under the federal acquisition regulation subpart 4.17- Service Contracts Inventory. SAM will only enable reporting for entities with contract that meet the SCR threshold at FAR 4.1703. As part of its quote, the vendor must include the estimated total cost (if any) incurred to comply with the Service Contract Reporting requirement.
18. Post Award Conference: In the event the Contracting Officer decides to conduct a Post Award Conference in accordance with DFARS 242.5, the awardee will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.
19. ABILITYONE DESIGNATED ITEMS: In accordance with 52.208-9, contractors are referred to the web site of the Committee for Purchase from People Who Are Blind or Severely Disabled, the independent federal agency that administers the AbilityOne (formerly Javits-Wagner-O'Day or JWOD) Program for the lists of designated products and services http://abilityone.gov/procurement_list/product_buy.html
20. In accordance with FAR 52.223-2, Affirmative Procurement of Bio-based Products under Services and Construction Contracts, contractors are required to submit annual bio-based reports to the reporting module in the System for Award Management (SAM) at https://www.sam.gov.
21. The “Equal Employment Opportunity Is The Law” notice (poster) referenced in FAR Clause 52.222-
26(b)(3), is located at http://www.dol.gov/ofccp/regs/compliance/posters/pdf/eeopost.pdf .
22. In accordance with FAR Clause 52.222-41(g), the contractor must notify each service employee working on this contract of the minimum wage and fringe benefits required to be paid pursuant to this contract, or shall post a copy of the wage determination and Department of Labor Form WH-1313 in a prominent place at the worksite. The applicable wage determination is incorporated into the contract. The WH-1313 poster is located at http://www.dol.gov/whd/regs/compliance/posters/sca.htm.
23. In accordance with FAR 52.222-42, In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5 332.
This Statement is for Information Only. It is not a Wage Determination.
Employee Class Monetary Wage -- Fringe Benefits
Laborer--Grounds Maintenance WG-3; Step 2
24. Required insurance:
The contractor shall provide, within ten (10) calendar days after contract award. The Contractor shall provide the Certificate of Insurance (COI) via email to the Post Award Contracting Officer and Post Award Contract Specialist. The COI shall be updated and sent to the Post Award Team on an annual basis.
In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.
Workmen’s Compensation As required by state laws
Employer’s Liability Insurance $100,000 per accident
General Liability Insurance - Bodily Injury Liability $500,000 per occurrence
Auto Liability Insurance $200,000 per person
Bodily Injury $500,000 per occurrence
Property Damage $20,000 per occurrence Contractor shall require the insurance company to specify contract number in the Description of Operation block of the Certificate of Insurance (COI) and the below statement.
"The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective- (1) For such period as the laws of the State in which this contract is to be performed prescribe; or (2) Until 30 days after the Insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer."
25. Legal compliance: The Contractor shall comply with all Federal, State, and Local Laws, codes and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with said compliance.
26. Contract performance:
Purpose. IAW with FAR Subpart 42.1500 contractor past performance information (PPI) is relevant information for future source selection purposes regarding a contractor’s actions under previously awarded contracts. It includes, for example, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; and generally, the contractor's business-like concern for the interest of the customer. Contractor past performance information is one of the tools that support Army efforts to acquire best value and is used to evaluate performance risk in source selection. The feedback provided by the government to the contractor in collecting PPI, and the knowledge that PPI will be used in future source selection decisions, should result in improved performance and a greater contractor focus on customer satisfaction.
Contractor Performance Assessment Reports System (CPARS): CPARS shall be prepared IAW AFARS Subpart 42 upon physical completion of the contract. If the period of performance will exceed 18 months, an “interim” assessment report shall be prepared at the completion of 12 months performance and annually thereafter until the contract is physically complete. An out-of-cycle or “addendum” report may be prepared if there is a need to record an extraordinary event prior to the next regularly scheduled evaluation or if it is necessary to report a meaningful occurrence during the period between physical completion of the contract and contract closeout. Additionally, addendum reports may be prepared to record contractor’s performance relative to contract closeout and other administrative requirements (e.g.
final indirect cost proposals, technical data, etc.).
Completion Due Date. The government will complete the CPARS within 60 days after the end of the assessment rating period (if applicable).
Evaluators. The Contracting Officer and the Contracting Officer’s Representative will jointly complete the performance assessment.
Contracts Performance Elements. The contractor’s performance shall be assessed in accordance with elements and rating system set forth in AFARS Subpart 42.
Contractor Review. The Contracting Officer will furnish a copy of the CPARS to the contractor requesting that the contractor submit comments, rebutting statements, and/or additional information to the Contracting Officer within 30 calendar days of receipt. Failure to respond within the designated timeframe will be taken as agreement with the assessment.
Contract Concurrence. Where a contractor concurs with, or takes no exception to a CPARS, such report shall be considered final and releasable for use in source selection and other deliberative purposes.
Contractor Rebuttal. Where a contractor takes exception to a performance report, the Contracting Officer will review the contractor’s rebuttal or comments and make appropriate changes. If the Contracting Officer makes changes, the changed rating will be reflected in the narrative. The Contracting Officer will make all reasonable efforts to reconcile the report and the contractor’s comments. However, it is not necessary that they reach agreement on the report where such is clearly impracticable. The contractor’s rebuttal or comments shall be made part of the CPARS.
Resolving Disagreements between the Government and the Contractor. In the event disagreements between the parties regarding the CPARS occur, the Contracting Officer will review the rebuttal and make appropriate changes. If no agreement is reached, the CPARS is forwarded to the Reviewing Official (Director of Contracting) along with the Contracting Officer’s Findings and Recommendation and supporting documentation. The decision of the Reviewing Official is final. Copies of the CPARS and the contractor’s response and review comments, if any, shall be retained as part of the evaluation.
Release of Contractor Performance Evaluation Information. The evaluation will not be released to other than government personnel and the contractor whose performance is evaluated. The performance evaluation information will be input into the applicable module within Contractor Performance Assessment Reporting System (CPARS) database (or Government system in use at time of the evaluation).
Source Selection Information. Departments and agencies will electronically access the CPARS information to support future award decisions.
27. Alternate disputes resolution: In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, Subparagraph (d) (2) (1) (B) (2), the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable, in accordance with the authority and requirements of the ADR Act.
28. Solicitation Attachments:
a. Attachment 1 – Price Schedule
b. Attachment 2 – AT OPSEC
c. Attachment 3 - Drawing
d. Attachment 3 – Service Ticket
PWS
PERFORMANCE WORK STATEMENT (PWS)
Region 6 Parking Lot Sweeping
09DEC2024
Part 1 General Information
1. General: This is a non-personal services contract to provide parking lot sweeping services with a regenerative air or vacuum sweeper as defined in this Performance Work Statement (PWS) for the 63d Readiness Division (RD).
1.1 Description of Services/Introduction: The contractor shall provide all personnel, labor, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform parking lot sweeping services as defined in the PWS except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: Performance Work Statement (Includes associated Performance Requirements Summary (PRS): The 63d RD is a geographically aligned and dispersed organization, building readiness by providing seamless, efficient, and continual Base Operations (BASOPS) services primarily to Army Reserve Soldiers, Civilians, Family members and units operating in the 63d RD region. This region, which covers seven states stretching from California to Arkansas, across the western lower tier of the continental United States, includes over 200 individual sites with approximately over 9 million square feet of building area. The 63d RD is headquartered in Mountain View, CA. The United States Army Reserve Command requires that Army and Armed Forces Reserve Centers are operated, managed, and maintained in accordance with applicable regulations and that they support the requirements of the commander to train for and succeed in wartime environments. To accomplish this, the 63d RD requires contractor training support to educate current and new Facility Coordinators throughout its Area of Operations (AO) on adherence to facility management procedures detailed in AR 140-483 and the 63d RD PAM 420-1.
1.3 Scope: The Contractor shall provide non-personal service(s). Unless otherwise explicitly stated, the contractor shall furnish all labor, management, travel, supplies, equipment, materials, and vehicles to perform the work described herein. The contractor shall comply with applicable federal, state, and local laws, regulations, and guidance;
and perform all work in accordance with these requirements and any applicable agreements. All work performed by the contractor under this firm fixed price (FFP) contract will be accomplished in a manner that conforms to this Technical PWS.
Annual and semi-annual parking lot sweeping, for paved Military Equipment Parking (MEP) and Privately Operated Vehicle (POV) areas, is required for compliance with the federal Clean Water Act, Section 402: National Pollution Discharge Elimination System;
and in accordance with the requirements of the California State Water Resources Control Board’s Industrial General Permit (IGP) for Storm Water Discharges Associated with Industrial Activities (General Permit No. CAS000001) that certain facilities in California retain. The Contractor shall provide street sweeping with a commercial regenerative air or vacuum sweeper. Annual sweeping shall occur before October 15 of each year. If a facility requires semi-annual sweeping it shall occur approximately 6 months after annual sweeping, but before June 30 of following calendar year.
NPDES facilities to be swept:
1. CA001, Wilkson Hall ARC, 4101 Chester Avenue, Bakersfield, California 93301-1141 (Semi-Annual Sweeping)
2. CA062, BT Collins ARC/AMSA #98, 6270 Midway Street, Sacramento, California 95828-0907 (Annual Sweeping)
1.4 Period of Performance: The period of performance (POP) shall be for 1 Base Period and 4 12-month Option Periods with a potential 6-month option to extend services.
1.5 Objectives: Parking lots accumulate pollutants that, when combined with stormwater, can lead to water quality impacts. Street sweeping can minimize some of these pollutants, including particulates and sediment. An effective lot sweeping program can minimize pollutants in stormwater and help meet regulatory requirements. The objective of this contract is for the contractor to perform annual and semi-annual parking lot sweeping services with a regenerative air or vacuum sweeper in a manner that will help the facility retain compliance with the California State Water Resources Control Board’s IGP. At times, as dedected in annual storm water samples, the amount of Total Suspended Solids (TSS) being discharged from each facility is out-of compliance.
Therefore, parking lot sweeping is recommended by the 63d’s Qualified Industrial Stormwater Practitioner (#000802) as a Best Management Practice (BMP) to help reduce the amount of TSS being discharged from each facility. The parking lot sweeping BMP is documented in the Stormwater Pollution Prevention Plan prepared for each facility.
1.6 General Information:
1.6.1 Quality Control Plan (QCP): Quality Control is the responsibility of the Contractor.The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within ten (10) days after date of contract award.
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the contractor. If the Government has provided comments, the Contractor shall then have (30) days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than (10) days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;
(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals);
(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;
(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;
(e) How the Contractor will ensure all keys issued will remain controlled items (Paragraph 1.7 Key Control);
(f) How the Contractor will inventory and track maintenance of all Government
Provided Equipment / Materials;
(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and
(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.
1.6.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP).
This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.6.2.1 Contractual Nonconforming Performance: CARs formerly Nonconformance Reports (NCR)) are used for managing contractual nonconformances on ACC administered contracts. Nonconformance occurs when a contractor fails to meet contract requirements or specifications. The COR will verbally notify the contractor and document in Product Data Reporting and Evaluation Program (PDREP) each time nonconforming service or supplies have been identified and request the contractor to correct the defect to conform with contract requirements. Resolution of nonconformance identified at the subcontractor level shall be addressed with the prime contractor. CARs are issued, processed, and closed IAW ACC Acquisition Instruction (AI) 46-2 and FAR subpart 46.407 (nonconforming supplies or services).
Level I: A Level I CAR describes a deficiency on a product or service and is not a systemic breakdown of a process or system. It includes those nonconformances that are minor in nature and can be promptly corrected by the contractor, present no need for root cause analysis, no determination if other contract requirements are affected, present no need for further preventive action, and do not materially reduce the usability of the supplies, services, construction, or deliverables. While the Government must document the nonconformance and the contractor must correct the nonconformance, further actions and Government follow-up are not required, and no written response from the contractor is needed. Level I CARs are considered closed immediately upon issuance.
Level II: A Level II CAR describes deficiencies in a contractor’s processes or systems but are not significant deficiencies. Level II CARs shall require the contractor to correct the nonconformance, perform root cause, and develop and provide a Corrective Action Plan (CAP) acceptable to the government. Some examples of systems affected may be quality inspection/management systems, and CBS identified in DFARS 242.70, or issues such as:
Multiple deficiencies on products or services indicating a systemic issue throughout the process, or, An escalation of repetitive Level I CARs for the same or similar nonconformance demonstrating the contractor is failing to institute effective corrective action and/or failing to implement effective quality and/or internal control(s).
Level III: A Level III CAR describes deficiencies in a contractor’s system that is affecting a contracts or program’s ability to meet cost, schedule, or performance requirements, or are:
A significant deficiency pursuant to DFARS 252.242-7005(b), “Contractor Business Systems” (CBS), or, A failure to respond to Level II CARs, or to remedy a recurring nonconformance.
The contractor shall be required to provide a CAP that is acceptable to the government.
Level IV: A Level IV CAR documents a critical nonconformance of such serious nature that is issued to the contractor’s business segment or corporate management for their attention to both the nonconforming condition and the company’s corrective action, or when a Level III CAR has been ineffective. A Level IV CAR will result in a mandatory review of available contractual remedies, such as cost disallowance, reduction or suspension of payments, revocation of government assumption of risk of loss, CBS disapproval, or suspension of all product and service acceptance activities. Contractual remedies will be implemented IAW applicable FAR/DFARS clauses and/or ACC Acquisition Instructions if applicable. Action to suspend product or service acceptance will be accomplished via a Level IV CAR. The contractor shall be required to provide a CAP that is acceptable to the government.
Overarching CAR Process Flow. The following outlines the normal process flow for the corrective action process. Follow the steps provided within PDREP CAR Module User Guide.
NOTE: Steps in subparagraphs (f)-(j) below do not apply to Level I CARs as they are considered closed immediately upon issuance.
a. Identify a contract nonconformance.
b. Create a CAR.
c. Review the CAR.
d. Coordinate and approve the CAR.
e. Issue the CAR to the contractor.
f. Receive and review the contractor’s CAP.
g. Accept/reject the contractor’s CAP.
h. Oversee contractor corrective action using a risk-based approach.
i. Receive notification from the contractor that corrective action is accomplished.
j. Verify corrective action was accomplished satisfactorily.
k. Close the CAR.
1.6.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g.
deliverables, submittals, etc.) deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.
1.6.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st Jan M. L. King Memorial Day 3rd Monday Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.6.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ.
Please refer to the following.
1.6.4.1 Government Facility Office Hours: The Government facility office hours are 8:00 am to 4:00 pm (0800 to 1600) Monday through Friday except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.6.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 8:00 am to 4:00 pm (0800 to 1600) Monday through Friday.
1.6.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 8:00 am to 4:00 pm (0800 to 1600) Monday through Friday. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.6.5 Training Holidays: The 63D RD has historically granted military personnel training holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.
1.6.6 Place of Performance: The work to be performed under this contract will be performed at the following locations:
1. CA001, Wilkson Hall ARC, 4101 Chester Avenue, Bakersfield, California 93301- 1141 (Semi-Annual Sweeping)
2. CA062, BT Collins ARC/AMSA #98, 6270 Midway Street, Sacramento, California 95828-0907 (Annual Sweeping)
1.6.7 Lost and Found Property: It is the responsibility of the Contractor to ensure that all items of possible personal or monetary value found by the Contractor’s employees are turned into the Contracting Officer Representative (COR).
1.6.8 Damages Caused by the Contractor: The Contractor shall be held accountable and liable to the Government for any damages to Government facilities, furnishings, equipment, or grounds caused by the Contractor or his employees. The Contractor shall instruct his employees to immediately inform the Contracting Officer Representative (COR) of any damages to property resulting from the performance of their duties.
1.6.9 Circumstances to Be Reported: The Contractor or the Contractor’s employees shall report any circumstances of needed repair of the facility or unusual activity in an area which may affect the performance of the work, present unhealthy or hazardous conditions, or create any delays or interference with the work caused by the employees of the Government. Such report shall be made immediately upon discovery by the Contractor to the COR.
1.6.10 Hazardous Materials: The Contractor shall provide an inventory listing of all hazardous materials used onsite. Safety Data Sheets (SDS) will be maintained and readily available for any chemicals or hazardous materials used onsite. It is the Contractor’s responsibility to properly train his personnel on the existence and safe use and storage of chemicals and hazardous materials.
1.6.11 Loss of Contractor Property: The Contractor shall be responsible to retain supplies and equipment in a safe and secure manner. The Government will not be held liable for any loss of supplies or equipment owned by the Contractor; nor the loss of any personal property belonging to employees of the Contractor.
1.6.12 The POC shall meet with COR to discuss immediate problem areas. The POC shall respond by phone or email to the COR within two (2) hours after notification of deficiencies and correct the deficiency(s) the next business day. The Contractor shall provide the telephone number and email of the POC to the COR.
1.7 Security Requirements:
1.7.1 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
1.7.2 Background Checks: Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.7.3 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use.
1.7.4 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: The following personnel are considered key personnel by the Government:The Contractor shall provide a Program/Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Program/Contract Manager, who shall act for the Contractor when the Program/Contract Manager is absent shall be provided in writing to the Contracting Officer no later than five (5) days after contract award and as changes occur.The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or Alternate Contract Manager shall be available between 7:30 a.m.
and 4:00 p.m, Monday through Friday except federal holidays. The POC(s) and alternates shall be able to read, write, speak, and understand English.
1.11 Identification of Contractor Employees: The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a recent color photo of the employee, prior to them entering Government facilities. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include subcontractors) employee shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit.
The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued identification cards shall be furnished to the COR prior to the listed employees entering Government facilities and updated as needed to reflect Contractor and Subcontractor personnel changes. All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials.
They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.12 Supervision of Contractor Employees: The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or Subcontractor employees.
1.13 Activity Regulations for Contractor Access and Use of Premises:
1.13.1 Follow all current Army Security Regulations concerning strict visitor control and preservation of all Government assets. Immediately report all security concerns to the Contracting Officer, who will notify the Security Office.
1.13.2 The Contractor shall ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.
1.13.3 The Contractor shall return within two business days all issued U.S. Government Common Access Cards, installation badges, and/or access passes to the COR when the contract is completed or when a Contractor employee no longer requires access to the installation or facility.
1.13.4 The Contractor shall comply with all personnel identity verification procedures.
Employees must be accompanied by an authorized Government employee at all times while providing services in secure areas.
1.13.5 During Force Protection Conditions (FPCON) Charlie and Delta, services are discontinued and services shall resume when the FPCON level is reduced to level Bravo or lower.
1.14 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/, the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.15 Safety: The following provides information pertaining to Safety and Accident Prevention: The contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.
1.15.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236- 13, Accident Prevention (November 1991), the references contained therein (e.g. U.S.
Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)).
1.16 Environmental Compliance: The following provides information on Environmental Compliance.
1.16.1 Environmental Compliance Plan and Program: The Contractor shall ensure that all of its operations and activities conform to the 63D RD’s environmental policy requirements. The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities on 63D RD’s sites are conducted in accordance with the 63D RD’s Spill Prevention and Response Plan, Solid Waste Policy, Final Governing Standards-Germany, and applicable German environmental laws/standards.
1.17 Required Training: The following provides information on training requirements.
1.17.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within thirty (30) days after contract start date or effective date of incorporation of this requirement into the contract, whichever applicable. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within sixty (60) days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies.
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within sixty (60) days after completion of the training.
1.17.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within thirty (30) days of employment under this contract. Verification of the training shall be provided to the COR within sixty (60) days after completion of the training. OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .