W911SA23Q3097 Solicitation (f) 20230915.pdf

PDF 608 KB Posted

Attached to
Industrial Wood Waste Grinding at Garrison, Fort McCoy, WI
Solicitation number
W911SA23Q3097
Issued by

About this file

This solicitation requests proposals for industrial wood waste grinding services at Fort McCoy in Wisconsin. The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort McCoy is seeking a contractor to grind wood debris including tree stumps, brush, logs and branches into wood chips no larger than four inches at multiple locations over a one-year base period with four one-year option periods. The incumbent contractor is Cornerstone Demolition and the total contract value for the previous contract was $262,500. Quotes are due by 10:00 AM on September 29, 2023.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W911SA23Q3097 15-Sep-2023

b. TELEPHONE NUMBER

608-388-1253

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 29 Sep 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W911SA9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

KRISTINE SCHOLZ

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0011946649

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

MICC - FT MCCOY

BLDG 1108 SOUTH R ST

FORT MCCOY WI 54656-5153

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W5CD3E 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

DIRECTORATE OF PUBLIC WORKS

DIRECTORATE OF PUBLIC WORKS

2171 S 8TH AVE

FORT MCCOY WI 54656

TEL: FAX:

(608) 388-3798FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

113310

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF86

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W911SA23Q3097

Section SF 1449 - CONTINUATION SHEET

SUPPLEMENTAL INFORMATION

1. An Award for this requirement will be made pursuant to FAR 13.5, Simplified Procedures for Certain Commercial Items.

2. This requirement will be awarded as a firm fixed price (FFP), Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The Government reserves the right to order the maximum quantities and is only obligated to order the minimum guarantee. It is the unilateral right of the Government to exercise the option year(s) of this contract.

3. The period of performance is anticipated to be 15 October 2023 to 14 October 2024, with four (4) one (1) year options periods, and a six (6) month option to extend services.

4. Quotes shall be emailed to Kristine.k.scholz.civ@army.mil. Quotes are due to the Government on or before the date/time listed on the solicitation in central time. It is the contractor’s responsibility to ensure their quote is received by the due date and time. As an Addendum to FAR 52.212-1, contractor shall submit all items in accordance with the Supplemental Information by the solicitation closing date and time. The contractor SHALL provide all required documents with submission of quotes.

Signed SF 1449 Completed information from the Supplemental Information section of the solicitation Completed Price Schedule Attachment Signed Amendments (if applicable)

If all required documents are not provided with the quote submission, your quote MAY NOT be considered for award.

5. If a quote is based on a teaming/partnering relationship or a joint venture, the contractor shall provide, with the quote, all required solicitation information for all parties including a copy of the teaming/partnering or joint venture agreement. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering or joint venture relationship.

6. This procurement is Set Aside as Unrestricted NAICS Code 113310 with a size standard of 500 employees.

7. Prior Contract Information Previous Contract Number: W911SA21D3004 Incumbent Contractor: Cornerstone Demolition Total Contract Value (TCV): $262,500.00* *TCV calculated with base, all options and a six (6) month option to extend services.

8. Period for acceptance of quotes. The contractor agrees to hold the prices in its quote firm for 90 calendar days from the date specified for receipt of quotes.

9. Site visit: ***A site visit will be held Wednesday, 20 September 2023 at the 10:00am (local time): US

Army Garrison, 2171 South 8th Avenue, Fort McCoy, WI 54656

The POC for the solicitation is Kristine Scholz, email: Kristine.k.scholz.civ@army.mil

For Site Visit information, see Site Visit clause 52.237-1. Unless you already have a permanent vehicle pass, you will be required to obtain a one-day vehicle pass. You will be required to present the following information: (1) vehicle registration, (2) valid driver’s license, (3) or car rental agreement (if applicable).

Attendees at the pre-proposal conference/site visit are cautioned that the Government will not wait for anyone who is late or lost and will not hold another pre-proposal conference/site visit. Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a formal written amendment issued by the Fort McCoy Contracting Office.

10. Written questions must be furnished to the Government no later than 10:00am (local time) on 21 September

2023 in order to ensure a timely response is provided by the solicitation closing date. All questions are to be submitted in writing at the time indicated in the solicitation or they may not be addressed before solicitation closing date; therefore, contractors are advised to submit questions as soon as possible. Please provide your company name, telephone, point of contact, e-mail address, and solicitation number on all questions. The Government will respond to questions via the issuance of an amendment which incorporates the question and the Government’s response.

11. SAM Unique Entity ID: ______________________________.

12. TAXPAYER ID #______________________________.

13. CAGE CODE __________________________________.

14. The guaranteed minimum is as follows:

Minimum Guarantee is 1 (EACH) Mobilization to Fort McCoy (CLIN 0001).

The guaranteed minimum for the base year is $6,426.73. There is no guaranteed minimum for the option periods. The maximums for this contract are specified in the CLIN Structure.

The first task order requirement is estimated to start 15 October 2023.

The government will award one (1) contract as a result of this solicitation.

In accordance with FAR clause 52.216-22, "Indefinite Quantity", the quantities specified in the price schedule are estimates only and are not purchased by this contract.

15. In accordance with FAR Clause 52.216-18, “Ordering,”:

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued prior to the expiration of the contract.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) A delivery order or task order is considered "issued" when--

(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;

(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or

(3) If sent electronically, the Government either--

(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or

(ii) Distributes the delivery order or task order via email to the Contractor's email address.

(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.

16. SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: An Active SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.

a. A SAM Unique Entity ID is required for SAM registration. If your company does not have a DUNS #, obtain one by calling 800-333-0505.

b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 113310, or a NAICS of similar business size, under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.

c. If the prospective awardee for this request for quotes is not actively registered in the SAM database by close of solicitation, including NAICS 113310, or a NAICS of similar business size, under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful actively registered contractor.

d. Within the SAM Representations and Certifications, please ensure you company has selected that you wish to bid on, or currently hold Department of Defense (DoD) issued or DoD funded Contracts. The DFARS provisions in SAM must also be completed by solicitation closing date and time.

e. Prospective contractors who have not completed electronic annual representations and certifications at http://www.sam.gov/ in conjunction with required registration in the System for Award Management (SAM) database, shall complete and submit FAR 52.212-3 Alternative 1 Offeror Representations and Certifications - Commercial Items and DFARS Representations and Certifications in SAM to be eligible to receive an award for this solicitation.

17. Contract Administrator: TBD at time of award.

If you have questions pertaining to this contract after contract award (i.e. questions regarding delivery, invoice procedures, etc.), please request assistance from the Contract Administrator. Be sure to include the contract number in your request for assistance. Requesting contract administration assistance from any other individual could result in a delayed response.

18. Contracting Officer: TBD at time of award.

19. Contracting Officer’s Representative (COR): TBD at the time of Award.

20. The Government intends to evaluate quotes and award a contract without discussions. Therefore, the contractor’s initial offer should contain the contractor’s best terms from a price and technical standpoint.

However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all quotes if such action is in the public interest and waive informalities and minor irregularities in quotes received.

21. Service Contract Reporting (SCR): Contractors will report manpower data relating to the performance of service contracts into the system for Award Management (SAM) (https://sam.gov) consistent with existing service contract reporting requirement under the federal acquisition regulation subpart 4.17- Service Contracts Inventory. SAM will only enable reporting for entities with contract that meet the SCR threshold at FAR 4.1703. As part of its quote, the vendor must include the estimated total cost (if any) incurred to comply with the Service Contract Reporting requirement.

22. Post Award Conference: In the event the Contracting Officer decides to conduct a Post Award Conference in accordance with DFARS 242.5, the awardee will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.

23. ABILITYONE DESIGNATED ITEMS: In accordance with 52.208-9, contractors are referred to the web site of the Committee for Purchase from People Who Are Blind or Severely Disabled, the independent federal agency that administers the AbilityOne (formerly Javits-Wagner-O'Day or JWOD) Program for the lists of designated products and services http://abilityone.gov/procurement_list/product_buy.html

24. In accordance with FAR 52.223-2, Affirmative Procurement of Bio-based Products under Services and Construction Contracts, contractors are required to submit annual bio-based reports to the reporting module in the System for Award Management (SAM) at https://www.sam.gov.

25. The “Equal Employment Opportunity Is The Law” notice (poster) referenced in FAR Clause 52.222-

26(b)(3), is located at http://www.dol.gov/ofccp/regs/compliance/posters/pdf/eeopost.pdf .

26. In accordance with FAR Clause 52.222-41(g), the contractor must notify each service employee working on this contract of the minimum wage and fringe benefits required to be paid pursuant to this contract or shall post a copy of the wage determination and Department of Labor Form WH-1313 in a prominent place at the worksite. The applicable wage determination is incorporated into the contract. The WH-1313 poster is located at http://www.dol.gov/whd/regs/compliance/posters/sca.htm.

27. In accordance with FAR 52.222-42, In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5 332.

This Statement is for Information Only. It is not a Wage Determination.

Employee Class Monetary Wage -- Fringe Benefits Logging Heavy Equipment

Operator WG-8; Step 2

28. Required insurance:

The contractor shall provide, within ten (10) calendar days after contract award. The Contractor shall provide the Certificate of Insurance (COI) via email to the Post Award Contracting Officer and Post Award Contract Specialist. The COI shall be updated and sent to the Post Award Team on an annual basis.

In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.

Workmen’s Compensation As required by state laws

Employer’s Liability Insurance $100,000 per accident General Liability Insurance - Bodily Injury Liability $500,000 per occurrence

Auto Liability Insurance $200,000 per person

Bodily Injury $500,000 per occurrence

Property Damage $20,000 per occurrence

Contractor shall require the insurance company to specify contract number in the Description of Operation block of the Certificate of Insurance (COI) and the below statement.

"The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective- (1) For such period as the laws of the State in which this contract is to be performed prescribe; or (2) Until 30 days after the Insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer."

29. Legal compliance: The Contractor shall comply with all Federal, State, and Local Laws, codes and regulations applicable to his performance under this contract and shall be solely responsible for all costs associated with said compliance.

30. Contract performance:

Purpose. IAW with FAR Subpart 42.1500 contractor past performance information (PPI) is relevant information for future source selection purposes regarding a contractor’s actions under previously awarded contracts. It includes, for example, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; and generally, the contractor's business-like concern for the interest of the customer. Contractor past performance information is one of the tools that support Army efforts to acquire best value and is used to evaluate performance risk in source selection. The feedback provided by the government to the contractor in collecting PPI, and the knowledge that PPI will be used in future source selection decisions, should result in improved performance and a greater contractor focus on customer satisfaction.

Contractor Performance Assessment Reports System (CPARS): CPARS shall be prepared IAW AFARS Subpart 42 upon physical completion of the contract. If the period of performance will exceed 18 months, an “interim” assessment report shall be prepared at the completion of 12 months performance and annually thereafter until the contract is physically complete. An out-of-cycle or “addendum” report may be prepared if there is a need to record an extraordinary event prior to the next regularly scheduled evaluation or if it is necessary to report a meaningful occurrence during the period between physical completion of the contract and contract closeout. Additionally, addendum reports may be prepared to record contractor’s performance relative to contract closeout and other administrative requirements (e.g.

final indirect cost proposals, technical data, etc.).

Completion Due Date. The government will complete the CPARS within 60 days after the end of the assessment rating period (if applicable).

Evaluators. The Contracting Officer and the Contracting Officer’s Representative will jointly complete the performance assessment.

Contracts Performance Elements. The contractor’s performance shall be assessed in accordance with elements and rating system set forth in AFARS Subpart 42.

Contractor Review. The Contracting Officer will furnish a copy of the CPARS to the contractor requesting that the contractor submit comments, rebutting statements, and/or additional information to the Contracting Officer within 30 calendar days of receipt. Failure to respond within the designated timeframe will be taken as agreement with the assessment.

Contract Concurrence. Where a contractor concurs with, or takes no exception to a CPARS, such report shall be considered final and releasable for use in source selection and other deliberative purposes.

Contractor Rebuttal. Where a contractor takes exception to a performance report, the Contracting Officer will review the contractor’s rebuttal or comments and make appropriate changes. If the Contracting Officer makes changes, the changed rating will be reflected in the narrative. The Contracting Officer will make all reasonable efforts to reconcile the report and the contractor’s comments. However, it is not necessary that they reach agreement on the report where such is clearly impracticable. The contractor’s rebuttal or comments shall be made part of the CPARS.

Resolving Disagreements between the Government and the Contractor. In the event disagreements between the parties regarding the CPARS occur, the Contracting Officer will review the rebuttal and make appropriate changes. If no agreement is reached, the CPARS is forwarded to the Reviewing Official (Director of Contracting) along with the Contracting Officer’s Findings and Recommendation and supporting documentation. The decision of the Reviewing Official is final. Copies of the CPARS and the contractor’s response and review comments, if any, shall be retained as part of the evaluation.

Release of Contractor Performance Evaluation Information. The evaluation will not be released to other than government personnel and the contractor whose performance is evaluated. The performance evaluation information will be input into the applicable module within Contractor Performance Assessment Reporting System (CPARS) database (or Government system in use at time of the evaluation).

Source Selection Information. Departments and agencies will electronically access the CPARS information to support future award decisions.

31. Alternate disputes resolution: In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, Subparagraph (d) (2) (1) (B) (2), the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable, in accordance with the authority and requirements of the ADR Act.

PWS

PERFORMANCE WORK STATEMENT (PWS)

Industrial Wood Waste Grinding Directorate of Public Works (DPW), Fort McCoy, Wisconsin

PART 1

GENERAL INFORMATION

1.1. General. This is a firm fixed price non-personal services contract to provide Industrial Wood Waste Grinding services at Fort McCoy, WI. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.2. Scope of Work. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform industrial wood waste grinding as defined in this PWS for Fort McCoy. The Contractor shall perform to the standards in this contract.

1.2.1. Contractor's work and responsibility shall include, but is not limited to, all job planning, programming, scheduling, administration, inspection, and management necessary to accomplish the required specified services.

Contractor shall assure that all work is accomplished in accordance with contract requirements, all applicable laws, and regulations and/or written directives issued by the Contracting Officer or their authorized representative. The Contractor shall perform to the standards in this contract.

1.2.2. Unless law or regulation specifically requires a particular process, the contractor is free to determine "how" to do the work, subject to the overall expectation that the contractor will use the most cost-effective methods appropriate to satisfy the Installation needs. The nature of the work requires the contractor to use flexible employment and scheduling techniques to minimize cost and maximize performance outcomes, to adapt to varying workload requirements.

1.3. Place of Performance: The work to be performed under this contract will be performed on Fort McCoy, WI.

1.3.1 Fort McCoy is situated on approximately 60,000 acres in the Coulee Region of West Central Wisconsin. It is located on Hwy 21 between Sparta and Tomah. Fort McCoy’s primary mission is to underpin readiness of force by serving as a training center and support site for power projection missions. As a Total Force Training Center, Fort McCoy’s primary responsibility is providing quality training facilities for military forces which require the generation of wood waste materials from various projects that occur on the installation.

1.4. Period of Performance: The period of performance shall be for one (1) Base Period of 12 months and four (4) 12-month option periods.

1.4.1. The Government reserves the right to extend the term of this contract at the prices set forth in Section B in accordance with the terms and conditions contained in clause 52.217-9 entitled, “Option to Extend the Term of the Contact”.

1.5. Hours of Operation. The contractor is responsible for conducting business, between the hours of 7:00am – 4:00pm, Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Contractor daily working hours may only be extended with prior COR coordination and approval. The contractor shall comply with all applicable Federal, State, and local laws, regulations and directives.

1.6. Federal Government Holidays.

New Year’s Day 1st day of January Martin Luther King Jr.'s Birthday 3rd Monday of January Presidents Day 3rd Monday of February Memorial Day Last Monday of May Juneteenth 3rd Monday of June Independence Day 4th day of July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11th day of November Thanksgiving Day 4th Thursday of November Christmas Day 25th day of December

1.6.1. When a holiday falls on a Sunday, the following Monday will be observed as a holiday and when a holiday falls on a Saturday, the proceeding Friday is observed as a holiday by U.S. Government Agencies. Any other Congressional or Presidential imposed Federal Holiday is also recognized.

1.6.2. When required services occur on holidays, work will be performed on either the previous or following workday, unless specified otherwise.

1.7. Point of Contact Information. The contractor shall provide a Point of Contact (POC) and other key personnel responsible for the performance of the work. The POC shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The POC shall be available to meet with the Contracting Officer (KO) or Contracting Officer’s Representative (COR) within two (2) business days of request within normal operating hours, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. The contractor shall respond to emails or phone calls within 24 hours during normal business hours. The contractor shall provide an emergency POC name and telephone number. The emergency POC shall be available 24 hours a day, 7 days a week. A list of these key personnel by position, including contact information, shall be submitted by email to the COR no later than (NLT) fifteen (15) working days prior to the contract start date and updated NLT five (5) working days prior to new employees commencing performance under this contract when personnel changes occur.

1.8. Employees: The selection, assignment and management of contractor employees is the responsibility of the Contractor; however, the Government reserves the right to restrict the employment under this contract of any contractor employee, or prospective contractor employee who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest or is in violation of Department of Army policies or procedures.

1.9. Contractor Personnel Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government.

The Contractor shall ensure that personnel present a professional appearance. This shall be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges containing the company name and the employee’s picture and name. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring that any contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. In accordance with DOD Directive 5500.7-R, “Joint Ethics Regulation”, Contractor employees must avoid improperly influenced in the execution of their duties under the contract. Particular attention should be paid to acceptance of gifts/ gratuities, and on non-disclosure of sensitive or classified information. The Contractor shall ensure employee conduct complies with 41 U.S.C. 423 relative to release of acquisition related information or actions or discussions which may prejudice future competitions. The Contractor shall ensure no contractor employees conduct political related activities or events on the US Army Facilities.

1.10. Access and General Protection/Security Policy and Procedures. The contractor and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. The contractor and all associated subcontractors’ employees shall also comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13) and the Real ID Act of 2005. Applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The Government may require monthly participation in the Installation Random Antiterrorism Program.

1.11. Identification (ID) of Contractor Employees. The Contractor shall provide each employee, to include subcontractor employees, an ID Badge, which includes at a minimum, the company Name, employee Name and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor employee shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor shall be responsible for collection of ID Badges upon completion of the contract or termination of an employee. The contractor shall maintain a current listing of all employees with an ID badge, providing service under this contract on an employee roster. The roster shall also identify the employee’s name, position title, and whether or not they are full- time or part-time employees. The employee roster shall be submitted by email to the COR NLT two (2) working days after the contract full performance start date and provide updated copies to the COR by the 2nd workday of the month as changes occur. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.12. Vehicle Access and Identification. The Contractor shall ensure all employees requiring access to the installation have completed all requirements and obtained authorization from the Fort McCoy Police Department.

Vehicle passes must also be obtained, and all contractor-owned and operated vehicles must be clearly identified with the company name. Vehicles shall be operated in a safe and prudent manner IAW Installation traffic rules and regulations. The Government reserves the right to search all vehicles entering or exiting the installation and limit or deny access to the installation as required.

1.12.1. Licensing and Insurance. The Contractor shall be responsible to ensure that all Federal, State, County insurance and licensing, certification requirements and permits are met and kept current. Employees must have a valid driver’s license and/or Commercial Driver’s License (CDL) as required for the type and class of vehicles used in the performance of this contract. The Contractor shall provide documentation of employee licensing and certification upon request to the COR.

1.13. Physical Security. The contractor shall be responsible for safeguarding all government equipment, information, and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.14. Restricted Areas. During the course of the contract, certain areas/sites may be restricted or closed to contractor personnel. The Contractor shall comply with all regulations and entry requirements to include signing in or obtaining an entry badge and/or waiting for an escort. Photography is prohibited without the written permission from the Government.

1.15. Organizational Conflict of Interest. Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in Federal Acquisition Regulation (FAR) Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.16. Post Award Conference/Periodic Progress Meetings. The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.

Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.17. Quality Control (QC). QC is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government. A formal Quality Control Plan (QCP) is not required for this commercial service. However, the contractor shall maintain an inspection system commensurate with commercial practices to ensure the Contractor only tenders for acceptance those items or services that conform to the requirements of this contract.

1.18. Quality Assurance (QA). The Government will evaluate the contractor’s performance under this contract and reserves the right to inspect or test any supplies or services that have been tendered for acceptance.

1.18.1. Non-conforming Supplies or Services. When a contractor’s performance does not meet contract requirements and/or approved work schedules and/or timeframes it is considered non-conformance. Non-conforming services shall be re-performed at no increase in contract price. If non-conforming services cannot be re-performed, are recurring, or the services fail to achieve to the performance standard listed within the specific task and/or Performance Requirements Summary (PRS), the Government may reject the nonconforming service(s) and document the contractor’s performance and may issue a Nonconformance Report (NCR). Non-conformance will be classified in one of three categories: level I (Minor), level II (Major) or level III (Critical). The Government may re-inspect work designated for re-performance or late performance. The Government can reduce payment to the contractor IAW the PRS or reduce payment to reflect the value of the services performed or may perform the services and charge the Contractor for any related cost incurred and/or may terminate this contract for cause.

1.18.1.1. Level I (Minor) non-conformance. Defined as a non-conformance that is not likely to materially reduce the usability of the supplies or services for their intended purpose or is a departure from established standards having little bearing on the effective use or operation of the supplies or services. Minor non-conformance usually can be corrected on the spot, where no further corrective action (CA) response is necessary and can be issued by the COR to the contractor. Minor non-conforming services shall be re-performed within a specified time frame at no increase in contract price. If minor non-conformances are recurring or re-performance is not completed in full and within the specified time a Level II non-conformance may be issued to the contractor by the KO.

1.18.1.2 Level II (Major) non-conformance. Defined as a non-conformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose. Recurring Minor non-conformances, or a non-responsive contractor, indicating a trend or failure of the contractor’s quality control, can also be classified as a Major non-conformance. Major non-conformances will result in the issuance of a written NCR from the KO to the contractor requiring the development of a Corrective Action Plan (CAP) by the contractor which identifies the root cause, CA for the root cause, CA for the specific non-conformance and the date CAs will be completed.

1.18.1.3 Level III (Critical) non-conformance. Defined as a non-conformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; is likely to prevent performance of a vital agency mission; is for a repeated or uncorrected level II NCRs; or is for a non-responsive contractor to a level II NCR. Critical non-conformances shall result in the issuance of a written NCR from the KO, or higher level within the contracting office, to the contractor requiring the development of a CAP by the contractor which identifies the root cause, CA for the root cause, CA for the specific non-conformance and the date CAs will be completed.

1.19. Government Observations. Federal and State Government personnel, other than the KO and COR, may from time-to-time, with the KO’s or COR’s coordination, observe or inspect contractor operations. However, these personnel may not interfere with the Contractor’s performance.

1.20. Environmental Controls. Compliance with Laws and Regulations: The Contractor shall be knowledgeable of and comply with all applicable Federal, State, Interstate and local laws and permits, regulations and requirements regarding environmental protections. This includes Army regulations, operating procedures, and permit conditions.

Contractor operations are subject to environmental compliance inspections without notice. In the event environmental laws/regulations changed during the term of this contract, the Contractor is required to comply as such laws come into effect.

1.20.1 Notification of Environmental Spills. If the Contractor spills or releases any material in performance of this contract or any other substance contained in 40 CFR 302 into the environment, the Contractor or its agent shall immediately report the incident to the Police Desk by calling 911, and the COR.

1.20.1.1. Liability. The Contractor shall assume liability for acts or omission in regard to compliance with Federal, State and local environmental statues, regulations and applicable guidelines, including, but not limited to, fines or penalties associated with enforcement actions and costs for environmental restoration (removal actions, remedial actions, and corrective actions). The Contractor and any subcontractor shall assume liability in the event that their actions result in the release of hazardous substance into the environment. The liability for the spill or release of such substance’s rests solely with the Contractor and its agent. The Contractor and any subcontractors shall be responsible for documentation, reporting, assessment, and remedial action requirements associated with such release and restoration of any damages.

1.20.2. Environmental Pollution Prevention. The Contractor shall perform all work so as to minimize environmental pollution or degradation of the environment of natural/cultural resources. The Contractor shall comply with all Federal, State, and local regulations and guidelines, while on the installation to ensure safe working conditions for contractor personnel and a safe environment for the occupants of Army facilities.

1.20.3. Environmental Requirement for Utilizing Recoverable Materials. The Federal Government is committed to the protection of the environment. To advance this goal at Fort McCoy, the Contractor shall utilize recovered materials to the maximum extent practicable IAW the Environmental Protection Agency’s (EPA) Comprehensive Procurement Guidelines (CPG) and Federal Acquisition Regulations (FAR) Clause 52.223-4, Recovered materials Certification.

1.21. Safety and Health Standards. The Contractor shall conform to the safety requirements contained in this contract for all activities related to the accomplishment of work. The Contractor shall initiate and maintain programs to comply with all applicable Federal, State, local laws and regulations and equipment operator manuals. Areas of compliance include, but not limited to, the provisions listed in Part 6.

1.22. Government and Personal Property. The Contractor shall be responsible for safeguarding all Government property. The Contractor shall conduct work so that Government property, personnel and work areas shall be protected at all times from inconvenience, damage, or injury. In the event of loss or damage of any nature, caused by contractor operations or employees, due to improper protection, precaution, or safety measures, such damages shall be repaired, or such property shall be replaced by the Contractor at their expense. In the event the Contractor does not satisfactorily repair or replace such damages, the Government reserves the right to make necessary correction and the Contractor shall reimburse the Government for all labor and materials costs associated with repairs or replacement.

1.22.1 Mishaps. In the event of any mishap to property or person(s), the Contractor shall take reasonable and prudent action to establish control of the mishap scene, prevent further damage to persons or property and notify emergency services by calling 911. The Contractor shall remain on-scene until released by the Fort McCoy Police Department.

1.22.2. Mishap Reporting. The Contractor shall record and report promptly (within one (1) hour) to the COR all available facts relating to each instance of damage to Government property, Personal property or any personal injury(ies). Initial notification may be made by phone and followed up by a written report.

1.23. Subcontracting. The Contractor shall include a clause in all subcontracts to comply with all safety, legal, environmental, operations to include cooperation and assistance in mishap reporting and investigations.

1.24. Emergency Services

1.24.1. Security and Fire Protection: In case of emergency, dial 911 from any base phone. The Contractor may call the Fort McCoy Police at 608-388-2000 or Fire Department at 608-388-2508 for assistance while performing services and or requirements under this contract.

1.24.2. Emergency Medical Treatment: In the event of a severe emergency during hours of operation, call 911 for response and transport, if necessary, to an emergency medical facility. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment.

1.24.2.1. The Contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the KO or COR, by phone call, within 30 minutes of the incident.

1.24.3. Traffic Accidents: If the contractor is involved in a traffic accident, the contractor shall notify the Directorate of Emergency Services (DES) immediately at 608-388-2000, and provide the Installation Safety Office at 608-388-6451, a verbal report within four (4) hours and a complete written report of each occurrence within three

(3) working days of each occurrence. The contractor is responsible for all tickets, fees, and other costs associated with traffic violations or accidents that are incurred by the contractor, while performing work under this contract.

DES contact numbers: Ambulance/Fire/Police Emergencies. 9-1-1; Law Enforcement Non-Emergency.608-388- 2000.

PART 2

DEFINITIONS & ACRONYMS

2.1. DEFINITIONS

2.1.1. ACCEPTANCE QUALITY LIMIT (AQL). The allowable variance from a standard before the Government will determine a specific service to be unsatisfactory. The maximum percent defective, maximum number of defects per hundred units, or total number of defects in the lot that will be considered as an acceptable variance from a standard. An AQL does not imply that the contractor may knowingly perform in a defective manner. It implies only that the Government recognized that defective performance might happen unintentionally.

2.1.2. AVERAGE END VOLUME. The procedure for calculating the volume of wood chips.

between two cross sections, the cross-sectional areas are averaged and multiplied by the distance between cross sections to determine the volume.

2.1.3. BEST EFFORT. That effort expended by the Contractor to perform within the awarded ceiling price all work specified in this task order (TO) and all other obligations under this TO and the basic contract. This effort includes providing required qualified personnel, properly supervised, and following industry accepted methodologies and other practices. The effort is further characterized by operating at all times with the Government’s best interest in mind, using effective methods and demonstrating sound cost control.

Failure to provide this required effort may result in the withholding of payment for services expended that do not qualify as best effort or a reduction in the payment to reflect decreased value of services received.

2.1.4. CONTINGENCY OPERATIONS. Unanticipated increases or decrease in the level of service required.

2.1.5. CONTRACT ADMINISTRATOR. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.

2.1.6. CONTRACT DISCREPANCY REPORT. A report used to document unsatisfactory contractor performance.

The CDR requires the contractor to explain, in writing, why performance is unsatisfactory; how performance shall be returned to satisfactory levels; and how recurrence of the problem shall be…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .