This document outlines a federal contract opportunity for repairing storm water drainage at Building 2000 on Fort McCoy in Wisconsin. The solicitation number is W911SA23B2001 and will be issued as an IFB seeking a single-award, firm fixed-price contract for work to be completed within 60 days of the notice to proceed. The requirement valued between $500,000 and $1 million will be set aside 100% for small businesses and awarded under NAICS code 237310 with a size standard of $39.5 million. The Mission and Installation Contracting Command at Fort McCoy will issue the solicitation. Interested parties should monitor the Interested Vendors List for associated documents and amendments rather than contacting the contracting specialist directly.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Geotechnical Investigation and Pavement Design
Building 2000 Pavements Contract No. W911SA-19-D-2001
USAMC 162583
Fort McCoy, Wisconsin | December 10, 2021
Geotechnical Investigation and Pavement Design Building 2000
Fort McCoy, Wisconsin
Prepared for:
US Army
Prepared by:
Short Elliott Hendrickson Inc.
3535 Vadnais Center Drive
St. Paul, MN 55110
I,Wayne Wambold, hereby certify that I am a licensed professional engineer in the State of Wisconsin in accordance with the requirements of ch. A-E 4, Wis. Adm. Code; that this document has been prepared in accordance with the Rules of Professional Conduct in
ch. A-E 8, Wis. Adm. Code; and that, to the best of my knowledge, all information contained in this document is correct and the document was prepared in compliance with all applicable requirements in chs. NR 500 to 538, Wis. Adm. Code.
DRAFT
Wayne Wambold, PE PE Number Date
SEH is a registered trademark of Short Elliott Hendrickson Inc.
GEOTECHNICAL INVESTIGATION AND PAVEMENT DESIGN USAMC 162583
i
Contents 1 Introduction
2 Scope of Services
3 Geotechnical Investigation
3.1 Field Investigation
3.2 Laboratory Testing
3.3 Site Conditions
4 Pavement Evaluation
4.1 Proposed Pavement Section
4.2 Construction Considerations
5 Infiltration Basin Considerations
6 Basis of Recommendations
7 References
List of Tables Table 1 – Ground Water Summary Table 2 – Pavement Testing Result Summary Table 3 – Design Estimated Traffic Table 4 – Design Pavement Section
List of Appendices Factual Report of Subsurface Exploration – Proposed Site Improvement Building
2000 (AET Report No. P-0006246 dated October 13, 2021) PCASE Results
USAMC 162583
Geotechnical Investigation and Pavement Design Building 2000 - Fort McCoy, Wisconsin Prepared for US Army
1 Introduction Improvements are planned at Building 2000 in Fort McCoy, Wisconsin. The improvements are intended to improve drainage around the existing building and pavements by constructing new ditches, culverts, or catchments. Additionally, existing pavements are deteriorated and will be reconstructed. Refer to Figure 1 for approximate extents of pavement improvements.
Figure 1. Building 2000 and approximate extends of pavement reconstruction
This report presents the results of the geotechnical investigation and pavement design for proposed improvements around Building 2000 at Fort McCoy in Wisconsin.
GEOTECHNICAL INVESTIGATION AND PAVEMENT DESIGN USAMC 1625832583
2 Scope of Services The scope of services for this investigation included 10 soil borings performed within the existing pavements and surrounding areas and eight pavement cores. The soil borings were standard penetration test (SPT) borings and were drilled in general conformance with ASTM D-1586 to ten feet below grade. Laboratory testing was conducted to aid in classifying site soils.
SEH geotechnical staff evaluated the subsurface conditions and determined parameters used for the pavement design. The following documents below were used for pavement design. Although the project Statement of Work does not require conformance with UFC standards, these were used as guidelines for pavement design with other design engineering based on soils, site use, and local conditions for general parking lot design. These references below are the primary documents used for design for the roads and parking areas. They are also referenced at the end of this report for more detailed information.
1. UFC 3-250-01 Pavement Design for Roads and Parking Areas
2. PCASE version 2.09.06 software.
3 Geotechnical Investigation
3.1 Field Investigation
The subsurface investigation included 10 SPT borings to depths ranging from 5 to 15 feet.
Pavement cores were obtained at 8 select locations. Water levels were recorded after each bore hole was completed. The results of the field exploration program including boring/test locations and borings logs are provided in Appendix A.
3.2 Laboratory Testing
Soil samples were placed in water-tight jars and brought to American Engineering Testing (AET) for classification tests consisting of moisture content tests and sieve analysis tests. Laboratory test results are in Appendix A.
3.3 Site Conditions
Site soils primarily consist of fine- to medium-grained silty sand and sand with varying amounts of silt. The sand varied from very loose to dense. Native sands encountered below surficial fill and pavement layers generally contained low amounts of fines (4 to 8 percent or less passing the No.
200 Sieve). Per UFC 3-250-01, sandy soils with percent fines ranging from 4 to 8 would be classified in Frost Group S2 and F2.
3.3.1 Ground Water
Water levels were checked after each bore hole was completed. The following table is a summary of the results.
Table 1 – Ground Water Summary
Soil Boring
No.
Location
Surface Elevation
(feet)
Ground Water Depth (feet)
Ground Water Elevation (feet)
SB-01 North Drive 853.5 -1 -1 SB-02 North Drive 853.5 -1 -1 SB-03 North Drainage Area 853.0 -1 -1 SB-04 North Drive 854.5 -1 -1 SB-05 Parking 853.5 -1 -1 SB-06 Parking 853.5 -1 -1 SB-07 East Drainage Area, North End 854.0 10.6 843.4 SB-08 Parking 853.0 -1 -1 SB-09 Interior Drainage 852.5 -1 -1 SB-12 East Drainage Area, North End 851.5 10.4 841.1
1. No free water was observed in the borings for the short duration the boreholes remained open prior to backfilling.
3.3.2 Summary of Pavement Cores
AET performed pavement cores. Table 2 summarizes average pavement thicknesses observed at selected locations. Refer to Appendix A for AET’s report and photos of core samples.
Table 2 – Pavement Testing Result Summary
4 Pavement Evaluation PCASE software version 2.09.06 was used to evaluate the existing pavement using the layer elastic design criteria.
Soil Boring No. Bituminous Thickness (in)
Aggregate Base Thickness (in)
Subgrade Description
SB-01 4 6.5 SP
SB-02 2 10.75 SP-SM
SB-04 3.5 8.25 SP-SM
SB-05 2.5 4 SP
SB-06 3.75 4.75 SP-SM
SB-08 2.75 6.75 SP-SM
SB-10 3 -1 -1
SB-11 3.5 -1 -1
1. Pavement core only aggregate base and subgrade not directly sampled or measured.
Based on discussions with base staff, the traffic mix and volume were estimated for a 25-year design period. The design estimated traffic for the pavements is summarized in Table 3.
Table 3 – Design Estimated Traffic
Vehicles Weight (lb) Passes 1
Car, Passenger 3000 1,365,000 Truck, Large Pickup or SUV 7500 910,000
Truck, 3 Axle 35000 13,000 Truck, 4 Axle 40000 1,300
1. Design passes considering 25-year design period.
4.1 Proposed Pavement Section
The recommended pavement section for Building 2000 is summarized below.
Table 4 – Design Pavement Section
Pavement Layer Thickness (inches) Material or Preparation Requirements
Asphalt Wear Course 1.75 4 LT 58-28 S Asphalt Base Course 1.75 4 LT 58-28 S
Graded-Crushed Aggregate Base 6
Compacted 100% of Standard Proctor Maximum Density
Subgrade NA
Compacted upper 8 inches to 95% of Standard Proctor Maximum Density
4.2 Construction Considerations
4.2.1 Winter Construction
This work at this site is not recommended for winter construction. The following recommendations are provided in the event construction occurs during winter conditions. Do not place asphalt concrete on frozen ground. All ice and snow should be removed from areas to receive fill. No fill should be placed on frozen ground or ground that contains snow or ice.
Utilization of material which requires on-site moisture modification(s) will be impractical and difficult to control compaction levels.
5 Infiltration Considerations Construction of drainage swales or basins to encourage infiltration for manage stormwater at this site appears feasible. Surficial topsoil, pavement, and fill are generally underlain by sandy soils containing relatively low fines contents. Groundwater was observed at approximate depths of 10 ½ feet
The hydraulic conductivity can be estimated for granular materials based on the effective grain size having finer than 10 percent, the percent passing the No. 200 sieve, and the porosity per Equation 20-16 in UFC 3-250-01. The following table estimates hydraulic conductivity based on gradations performed on samples at Boring SB-1, SB-2, SB-3, SB-6, SB-7, SB-8, and SB-12.
Boring ID Depth (ft) Finer than
No. 200 Sieve (%)
Effective Grainsize at 10 percent, D10 (mm)
Porosity, n
Hydraulic Conductivity
(ft/day) Eqn. 20-16 per
UFC 3-250-01
1 1.4 4.2 0.085 0.38 10.4 2 1.5 7.5 0.088 0.38 7.8 3 5 0.3 0.169 0.38 139.2 6 1.3 4.5 0.093 0.38 11.4 7 5 3.5 0.155 0.38 28.3 8 1.6 4.6 0.087 0.38 10.2 12 5 0.1 0.202 0.38 349.1 12 7 2.3 0.113 0.38 22.8
We do not recommend using the estimated hydraulic conductivity ranges for design of infiltration features directly, as these don’t consider that long term infiltration rates may be reduced by siltation and/or biofouling. For design of infiltration features, WDNR Technical Standard 1002 estimates an infiltration rate of 0.50 inches per hour for fine sand soils encountered in the borings.
6 Basis of Recommendations The analysis, conclusions, and recommendations contained in this report are based on the data obtained from the soil borings, the locations of which are indicated in this report, and our interpretation of that data with respect to the proposed structures.
Ground water conditions are extremely susceptible to fluctuation. The period of observation in any one borehole was relatively short and changes can be expected to occur during flooding, due to rainfall or irrigation, spring thaw, drainage and other seasonal and periodic cycles not evident when the observations were made.
This report is intended for use in preparing the plans and specifications for the facility at the location indicated in this report. Use for any other structure or purpose is not recommended without review by a competent professional familiar with the soils at the site and implications with regard to the proposed facilities.
7 References Department of Defense (February 2019) Unified Facility Criteria UFC 3-250-01, Pavement Design for Roads and Parking Areas.
ASTM International (1992) ASTM D-1586, Method for Penetration Test and Split Barrel Sampling of Soils.
B. A. Brown (1988) Bedrock Geology of Wisconsin – West Central Sheet. Wisconsin Geological and Natural History Survey Map
Appendix A Factual Report of Subsurface Exploration – Proposed Site Improvement Building 2000 (AET Report No.
P-0006246 dated October 13, 2021)
FACTUAL REPORT OF
SUBSURFACE EXPLORATION
Proposed Site Improvements Fort McCoy – Building 2000 Fort McCoy, Wisconsin AET Project No. P-0006246
Date:
October 13, 2021
Prepared for:
Short Elliot Hendrickson, Inc.
3535 Vadnais Center Drive St. Paul, Minnesota 55110
This document shall not be reproduced, except in full, without written approval of American Engineering Testing, Inc.
1837 County Highway OO ▪ Chippewa Falls, WI 54729 ▪ 715-861-5045 ▪ Fax 651-651-1379 ▪ www.amengtest.com
AN AFFIRMATIVE ACTION AND EQUAL OPPORTUNITY EMPLOYER
Page i
A AMERICAN
ENGINEERING
TESTING, INC.
October 13, 2021
Mr. Brett Larsen, P.E.
Short Elliot Hendrickson, Inc.
3535 Vadnais Center Drive St. Paul, Minnesota 55110
RE: Factual Report of Subsurface Exploration Proposed Site Improvements Fort McCoy – Building 2000 Fort McCoy, Wisconsin AET Project No. P-0006246
Dear Mr. Larsen:
We are pleased to present the results of our subsurface exploration program we performed for your site improvements project in Fort McCoy, Wisconsin. These services were performed according to our proposal to you dated June 1, 2021.
We are submitting an electronic (PDF) version of this report to you. Unless you request otherwise, we will not submit any printed copies of this report to you.
We have enjoyed working with you on this phase of the project. Please contact us if you have questions about this report or require further assistance.
Sincerely, American Engineering Testing, Inc.
Logan W. Dodd, E.I.T.
Geotechnical Engineer
Factual Report of Subsurface Exploration Proposed Site Improvements; Fort McCoy – Building 2000 Fort McCoy, Wisconsin AMERICAN October 13, 2021 ENGINEERING AET Project No. P-0006246 TESTING, INC.
Copyright 2021 American Engineering Testing, Inc.
All Rights Reserved
Unauthorized use or copying of this document is strictly prohibited by anyone other than the client for the specific project.
Page ii
Signature Page
Prepared for: Prepared by:
Mr. Brett Larsen, P.E. American Engineering Testing, Inc.
Short Elliot Hendrickson, Inc. 1837 County Highway OO 3535 Vadnais Center Drive Chippewa Falls, Wisconsin 54729 St. Paul, Minnesota 55110 (715) 861-5045/www.amengtest.com
Report Authored By: Review Conducted By:
Logan W. Dodd, E.I.T. Blake E. Snyder, P.E. (WI) Geotechnical Engineer Geotechnical Engineer
Fort McCoy, Wisconsin AMERICAN October 13, 2021 ENGINEERING AET Project No. P-0006246 TESTING, INC.
Page iii
TABLE OF CONTENTS
Transmittal Letter ............................................................................................................................. i Signature Page ................................................................................................................................ ii TABLE OF CONTENTS ............................................................................................................... iii
1.0 INTRODUCTION
2.0 SCOPE OF SERVICE
3.0 SUBSURFACE EXPLORATION AND LABORATORY TESTING
4.0 SITE CONDITIONS
4.1 Surface Observations
4.2 Subsurface Soils
4.3 Groundwater
5.0 ASTM STANDARDS
6.0 LIMITATIONS
APPENDIX A Geotechnical Field Exploration and Testing Boring Log Notes Unified Soil Classification System Figure 1 – Boring and DCP Locations Subsurface Boring Logs Gradation Curves Dynamic Cone Penetrometer Test Results Core Pictures SBD-10793 – Soil Evaluation-Storm
APPENDIX B Geotechnical Report Limitations and Guidelines for Use
Fort McCoy, Wisconsin AMERICAN October 13, 2021 ENGINEERING AET Project No. P-0006246 TESTING, INC.
1.0 INTRODUCTION
Short Elliot Hendrickson, Inc. (SEH) is providing engineering services for site improvements at Building 2000 at Fort McCoy in Fort McCoy, Wisconsin. Planned improvements include drainage improvements and pavement replacement. To assist with planning and design, Mr. Brett Larsen, P.E. of SEH, authorized American Engineering Testing, Inc. (AET) to conduct a subsurface exploration program at the site. This factual report presents the results of the above services.
2.0 SCOPE OF SERVICE
AET's services were performed according to our proposal to SEH dated June 1, 2021. The authorized scope consists of the following:
• Eight pavement cores with accompanying dynamic cone penetrometer testing.
• Ten standard penetration test borings to depths of 5 to 15 feet each.
• Visual/manual classification and limited laboratory testing of the recovered soil samples.
• Preparation of this factual report.
These services are intended for geotechnical purposes. The scope is not intended to explore for the presence or extent of environmental contamination.
3.0 SUBSURFACE EXPLORATION AND LABORATORY TESTING
Our subsurface exploration program for this project consisted of drilling ten borings with standard penetration testing (SPT) on September 20 and 21, 2021. We also conducted eight pavement cores with dynamic cone penetrometer (DCP) tests. SEH selected the number, depths, and locations of the borings and DCP tests. They also marked the boring and test locations and provided the surface elevations at each location. The approximate boring and DCP locations are shown on Figure 1 in Appendix A.
Prior to drilling, we contacted Wisconsin Diggers Hotline to locate public underground utilities at the site. We drilled the borings using 3¼-inch-inside-diameter hollow-stem augers. Refer to Appendix A for details on the drilling and sampling methods, the classification methods, and the water level measurement details.
The boring logs are found in Appendix A and contain information concerning soil layering, geologic description, moisture condition, and USCS classifications. Relative density or
Fort McCoy, Wisconsin AMERICAN consistency is also noted for the natural soils, which are based on the standard penetration resistance (N-value).
The DCP field data results, as well as pictures of the eight pavement cores, are found in Appendix A. Note that some of the cores were not recovered in their entirety, and thus the downhole measurement on the boring log may differ from what appears in the core picture.
Wisconsin Department of Safety and Professional Services (DSPS) form SBD-10793 “Soil Evaluation – Storm” is included in Appendix A. This form includes USDA soil classifications, hydraulic application rates established by State of Wisconsin code (based on soil texture), and other characteristics of the soils we encountered in borings SB-07 and SB-12.
Including the requested laboratory testing, we performed thirty-eight moisture content tests, five wash gradation (percent passing the P200 sieve) tests, and twelve sieve analyses on the recovered soil samples. The moisture content and percent of silt/clay particles (%-200) test results are shown on the boring log, adjacent to the sample on which each test was performed. The sieve analysis results are shown on a separate page following the boring logs in Appendix A.
4.0 SITE CONDITIONS
4.1 Surface Observations
On the day we drilled the project area consisted of open lawn space, multiple buildings, and existing pavement areas. The ground surface was relatively flat with a maximum elevation difference among our borings of about 3 feet.
4.2 Subsurface Soils
We measured about 2 to 4 inches of bituminous pavement at the surface of borings SB-01, SB-02, SB-04, SB-05, SB-06, SB-08, SB-10, and SB-11, and about 5 to 20 inches of topsoil at the surface of borings SB-03, SB-07, SB-09, and SB-12. Underlying the pavement and/or topsoil we encountered fill to depths of about 10 inches to 4 feet in each boring, except borings SB-03 and SB-12; the fill depth was not measured in SB-10 or SB-11 since those were pavement core only locations. The fill layer directly below the pavement (possible weathered sandstone) appears to have been placed with the intent to be the base course layer, however the material generally does not meet WisDOT 305 requirements for dense-graded base. The fill soils generally consisted of
Fort McCoy, Wisconsin AMERICAN sand with varying silt and gravel contents. The underlying naturally occurring soils were coarse alluvium consisting of loose to dense sand with varying silt and gravel contents.
4.3 Groundwater
We measured groundwater at depths of 10.6 and 10.4 feet in borings SB-07 and SB-12, respectively, which correspond to elevations of 843.4 and 841.1 feet. We did not encounter groundwater in any other borings drilled for this project. Because the coarse alluvium is relatively fast draining, it is our opinion these depths approximately corresponded to the static water table on the days we drilled. However, groundwater levels will fluctuate due to varying seasonal and annual rainfall and snow melt amounts and other factors. Piezometers would be needed to obtain long-term groundwater level measurements, which was beyond our scope of service.
5.0 ASTM STANDARDS
When we refer to an ASTM Standard in this report, we mean that our services were performed in general accordance with that standard. Compliance with any other standards referenced within the specified standard is neither inferred nor implied.
6.0 LIMITATIONS
Within the limitations of scope, budget, and schedule, we have endeavored to perform our services according to generally accepted geotechnical engineering practices at this time and location. Other than this, no warranty, either express or implied, is intended. Important information regarding risk management and proper use of this report is given in Appendix B entitled “Geotechnical Report Limitations and Guidelines for Use.”
Proposed Site Improvements; Building 2000 – Fort McCoy Fort McCoy, Wisconsin AMERICAN
Geotechnical Field Exploration and Testing
Boring Log Notes Unified Soil Classification System
Figure 1 – Boring and DCP Locations Subsurface Boring Logs
Gradation Curves Dynamic Cone Penetrometer Test Results
Core Pictures SBD-10793 – Soil Evaluation-Storm
SBDSBD
SBD
Appendix A - Page 1 of 2 AMERICAN ENGINEERING TESTING, INC.
A.1 FIELD EXPLORATION
The subsurface conditions at the site were explored by drilling ten standard penetration test borings. The boring locations are shown on Figure 1.
A.2 SAMPLING METHODS
A.2.1 Split-Spoon Samples (SS) Standard penetration (split-spoon) samples were collected in general accordance with ASTM: D1586. The ASTM test method consists of driving a 2-inch O.D. split-barrel sampler into the in-situ soil with a 140-pound hammer dropped from a height of 30 inches. After an initial set of 6 inches, the number of hammer blows to drive the sampler the next 12 inches is known as the standard penetration resistance or N-value.
In the past, standard penetration N-value tests were performed using a rope and cathead for the lift and drop system. The energy transferred to the split-spoon sampler was typically limited to about 60% of its potential energy due to the friction inherent in that system. That converted energy provided what is known as an N60 blow count.
Most drill rigs today incorporate an automatic hammer lift and drop system, which has higher energy efficiency and subsequently results in lower N-values than the traditional N60 values. We use a Pile Driving Analyzer (PDA) and an instrumented rod to measure the actual energy generated by the automatic hammer system. The drill rig (AET rig number 30) we used for this project has a measured energy transfer ratio of 91%. The N-values reported on the boring logs and the corresponding relative densities and consistencies have been converted to N60 values using the following formula (results were rounded down to the nearest whole number):
𝑁𝑁 = �𝐸𝐸𝐸𝐸𝐸𝐸
� ∗ Nf
Where: N = corrected N-value ETR = hammer energy transfer ratio Nf = uncorrected field N-value
A.2.2 Sampling Limitations Unless actually observed in a sample, contacts between soil layers are estimated based on the spacing of samples and the action of drilling tools. Cobbles, boulders, and other large objects generally cannot be recovered from test borings, and they may be present in the ground even if they are not noted on the boring logs.
Determining the thickness of “topsoil” layers is usually limited, due to variations in topsoil definition, sample recovery, and other factors. Visual-manual description often relies on color for determination, and transitioning changes can account for significant variation in thickness judgment. Accordingly, the topsoil thickness presented on the logs should not be the sole basis for calculating topsoil stripping depths and volumes. If more accurate information is needed relating to thickness and topsoil quality definition, alternate methods of sample retrieval and testing should be employed.
A.3 CLASSIFICATION METHODS
Soil descriptions shown on the boring logs are based on the Unified Soil Classification System (USCS). The USCS is described in ASTM: D2487 and D2488. Where laboratory classification tests (sieve analysis or Atterberg Limits) have been performed, accurate classifications per ASTM: D2487 are possible. Otherwise, soil descriptions shown on the boring logs are visual-manual judgments.
Charts are attached which provide information on the USCS, the descriptive terminology, and the symbols used on the boring logs.
The boring logs include descriptions of apparent geology. The geologic depositional origin of each soil layer is interpreted primarily by observation of the soil samples, which can be limited. Observations of the surrounding topography, vegetation, and development can sometimes aid this judgment.
Appendix A - Page 2 of 2 AMERICAN ENGINEERING TESTING, INC.
A.4 WATER LEVEL MEASUREMENTS
The ground water level measurements are shown at the bottom of the boring logs. The following information appears under “Water Level Measurements” on the logs:
• Date and Time of measurement
• Sampled Depth: lowest depth of soil sampling at the time of measurement
• Casing Depth: depth to bottom of casing or hollow-stem auger at time of measurement
• Cave-in Depth: depth at which measuring tape stops in the borehole
• Water Level: depth in the borehole where free water is encountered
• Drilling Fluid Level: same as Water Level, except that the liquid in the borehole is drilling fluid
The true location of the water table at the boring locations may be different than the water levels measured in the boreholes. This is possible because there are several factors that can affect the water level measurements in the borehole. Some of these factors include:
permeability of each soil layer in profile, presence of perched water, amount of time between water level readings, presence of drilling fluid, weather conditions, and use of borehole casing.
A.5 TEST STANDARD LIMITATIONS
Field and laboratory testing is done in general conformance with the described procedures. Compliance with any other standards referenced within the specified standard is neither inferred nor implied.
A.6 SAMPLE STORAGE
Unless notified to do otherwise, we routinely retain representative samples of the soils recovered from the borings for a period of 30 days.
01REP052 (12/08) AMERICAN ENGINEERING TESTING, INC.
BORING LOG NOTES
DRILLING AND SAMPLING SYMBOLS TEST SYMBOLS
Symbol Definition Symbol Definition
B, H, N: Size of flush-joint casing CA: Crew Assistant (initials) CAS: Pipe casing, number indicates nominal diameter in inches CC: Crew Chief (initials) COT: Clean-out tube DC: Drive casing; number indicates diameter in inches DM: Drilling mud or bentonite slurry DR: Driller (initials) DS: Disturbed sample from auger flights FA: Flight auger; number indicates outside diameter in inches HA: Hand auger; number indicates outside diameter HSA: Hollow stem auger; number indicates inside diameter in inches LG: Field logger (initials) MC: Column used to describe moisture condition of samples and for the ground water level symbols N (BPF): Standard penetration resistance (N-value) in blows per foot (see notes) NQ: NQ wireline core barrel PQ: PQ wireline core barrel RD: Rotary drilling with fluid and roller or drag bit REC: In split-spoon (see notes) and thin-walled tube sampling, the recovered length (in inches) of sample.
In rock coring, the length of core recovered (expressed as percent of the total core run). Zero indicates no sample recovered.
REV: Revert drilling fluid SS: Standard split-spoon sampler (steel; 1" is inside diameter; 2" outside diameter); unless indicated otherwise
SU Spin-up sample from hollow stem auger TW: Thin-walled tube; number indicates inside diameter in inches WASH: Sample of material obtained by screening returning rotary drilling fluid or by which has collected inside the borehole after “falling” through drilling fluid
WH: Sampler advanced by static weight of drill rod and 140-pound hammer
WR: Sampler advanced by static weight of drill rod 94mm: 94 millimeter wireline core barrel ▼: Water level directly measured in boring
: Estimated water level based solely on sample appearance
CONS: One-dimensional consolidation test DEN: Dry density, pcf DST: Direct shear test E: Pressuremeter Modulus, tsf HYD: Hydrometer analysis LL: Liquid Limit, % LP: Pressuremeter Limit Pressure, tsf OC: Organic Content, % PERM: Coefficient of permeability (K) test; F - Field;
L - Laboratory PL: Plastic Limit, % qp: Pocket Penetrometer strength, tsf (approximate) qc: Static cone bearing pressure, tsf qu: Unconfined compressive strength, psf R: Electrical Resistivity, ohm-cms RQD: Rock Quality Designation of Rock Core, in percent
(aggregate length of core pieces 4" or more in length as a percent of total core run)
SA: Sieve analysis TRX: Triaxial compression test VSR: Vane shear strength, remolded (field), psf VSU: Vane shear strength, undisturbed (field), psf WC: Water content, as percent of dry weight %-200: Percent of material finer than #200 sieve
STANDARD PENETRATION TEST NOTES
The standard penetration test consists of driving the sampler with a 140 pound hammer and counting the number of blows applied in each of three 6" increments of penetration. If the sampler is driven less than 18" (usually in highly resistant material), permitted in ASTM: D1586, the blows for each complete 6" increment and for each partial increment is on the boring log. For partial increments, the number of blows is shown to the nearest 0.1' below the slash.
The length of sample recovered, as shown on the “REC” column, may be greater than the distance indicated in the N column. The disparity is because the N-value is recorded below the initial 6" set (unless partial penetration defined in ASTM: D1586 is encountered) whereas the length of sample recovered is for the entire sampler drive (which may even extend more than 18").
01CLS021 (07/08) AMERICAN ENGINEERING TESTING, INC.
UNIFIED SOIL CLASSIFICATION SYSTEM
ASTM Designations: D 2487, D2488
AMERICAN
ENGINEERING
TESTING, INC.
Criteria for Assigning Group Symbols and Group Names Using Laboratory TestsA
Soil Classification Notes ABased on the material passing the 3-in (75-mm) sieve.
BIf field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name.
CGravels with 5 to 12% fines require dual symbols:
GW-GM well-graded gravel with silt GW-GC well-graded gravel with clay GP-GM poorly graded gravel with silt GP-GC poorly graded gravel with clay DSands with 5 to 12% fines require dual symbols:
SW-SM well-graded sand with silt SW-SC well-graded sand with clay SP-SM poorly graded sand with silt SP-SC poorly graded sand with clay
(D30)2
ECu = D60 /D10, Cc = D10 x D60
FIf soil contains >15% sand, add “with sand” to group name.
GIf fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
HIf fines are organic, add “with organic fines” to group name.
IIf soil contains >15% gravel, add “with gravel” to group name.
JIf Atterberg limits plot is hatched area, soil is a CL-ML silty clay.
KIf soil contains 15 to 29% plus No. 200 add “with sand” or “with gravel”, whichever is predominant.
LIf soil contains >30% plus No. 200, predominantly sand, add “sandy” to group name.
MIf soil contains >30% plus No. 200, predominantly gravel, add “gravelly” to group name.
NPl>4 and plots on or above “A” line.
OPl<4 or plots below “A” line.
PPl plots on or above “A” line.
QPl plots below “A” line.
RFiber Content description shown below.
Group Symbol
Group NameB
Coarse-Grained Soils More than 50% retained on No. 200 sieve
Gravels More than 50% coarse fraction retained on No. 4 sieve
Clean Gravels Less than 5% finesC
Cu>4 and 1<Cc<3E GW Well graded gravelF
Cu<4 and/or 1>Cc>3E GP Poorly graded gravelF
Gravels with Fines more than 12% fines C
Fines classify as ML or MH GM Silty gravelF.G.H
Fines classify as CL or CH GC Clayey gravelF.G.H
Sands 50% or more of coarse fraction passes No. 4 sieve
Clean Sands Less than 5% finesD
Cu>6 and 1<Cc<3E SW Well-graded sandI
Cu<6 and/or 1>Cc>3E SP Poorly-graded sandI
Sands with Fines more than 12% fines D
Fines classify as ML or MH SM Silty sandG.H.I
Fines classify as CL or CH SC Clayey sandG.H.I
Fine-Grained Soils 50% or more passes the No. 200 sieve
(see Plasticity Chart below)
Silts and Clays Liquid limit less than 50 inorganic PI>7 and plots on or above “A” lineJ
CL Lean clayK.L.M
PI<4 or plots below “A” lineJ
ML SiltK.L.M organic Liquid limit–oven dried <0.75 Liquid limit – not dried
OL Organic clayK.L.M.N
Organic siltK.L.M.O
Silts and Clays Liquid limit 50 or more inorganic PI plots on or above “A” line CH Fat clayK.L.M
PI plots below “A” line MH Elastic siltK.L.M organic Liquid limit–oven dried <0.75 Liquid limit – not dried
OH Organic clayK.L.M.P
Organic siltK.L.M.Q
Highly organic soil
Primarily organic matter, dark in color, and organic in odor
PT PeatR
3 2 ½ 1 ¾ 4 10 20 40 60 140 200
Sieve NumberScreen Opening (in.)
50 10 5 1.0 0.10.5
PARTICLE SIZE IN MILLIMETERS
SIEVE ANALYSIS
PE
RC
EN
T
P
AS
SI
NG
PE
RC
EN
T
R
ET
AI
NE
D
D60 = 15mm
D30 = 2.5mm
D10 = 0.075mm
Cu = = = 200D60
D10
0.075 Cc = = = 5.6(D30)
D10 x D60
2.5
0.075 x 15
2 2
CL-ML
For classification of fine-grained soils and fine-grained fraction of coarse-grained soils.
Equation of "A"-line Horizontal at PI = 4 to LL = 25.5.
then PI = 0.73 (LL-20)
Equation of "U"-line Vertical at LL = 16 to PI = 7.
then PI = 0.9 (LL-8)
"A" LINE
"U" L
INE
CL O
R O
L
CH OR O
H
10 20 30 40 50 60 70 80 90 100 110 0 0
PL
AS
TI
CI
TY
IN
DE
X
(P I)
LIQUID LIMIT (LL)
Plasticity Chart
ADDITIONAL TERMINOLOGY NOTES USED BY AET FOR SOIL IDENTIFICATION AND DESCRIPTION
Grain Size Term Particle Size
Boulders Over 12" Cobbles 3" to 12" Gravel #4 sieve to 3" Sand #200 to #4 sieve Fines (silt & clay) Pass #200 sieve
Gravel Percentages Term Percent
A Little Gravel 3% - 14% With Gravel 15% - 29% Gravelly 30% - 50%
Consistency of Plastic Soils Term N-Value, BPF
Very Soft less than 2 Soft 2 - 4 Firm 5 - 8 Stiff 9 - 15 Very Stiff 16 - 30 Hard Greater than 30
Relative Density of Non-Plastic Soils Term N-Value, BPF
Very Loose 0 - 4 Loose 5 - 10 Medium Dense 11 - 30 Dense 31 - 50 Very Dense Greater than 50
Moisture/Frost Condition (MC Column)
D (Dry): Absence of moisture, dusty, dry to touch.
M (Moist): Damp, although free water not visible. Soil may still have a high water content (over “optimum”).
W (Wet/ Free water visible, intended to Waterbearing): describe non-plastic soils.
Waterbearing usually relates to sands and sand with silt.
F (Frozen): Soil frozen
Layering Notes
Laminations: Layers less than ½" thick of differing material or color.
Lenses: Pockets or layers greater than ½" thick of differing material or color.
Peat Description
Fiber Content Term (Visual Estimate)
Fibric Peat: Greater than 67% Hemic Peat: 33 – 67% Sapric Peat: Less than 33%
Organic Description (if no lab tests) Soils are described as organic, if soil is not peat and is judged to have sufficient organic fines content to influence the Liquid Limit properties.
Slightly organic used for borderline cases.
Root Inclusions With roots: Judged to have sufficient quantity of roots to influence the soil properties.
Trace roots: Small roots present, but not judged to be in sufficient quantity to significantly affect soil properties.
ML OR OL
MH OR OH
SB-01
SB-02
SB-05
SB-08
SB-03
SB-04
SB-07
SB-06
SB-10
SB-12
SB-09
SB-11
Figure 1 - Boring and DCP Locations Proposed Site Improvements Fort McCoy - Building 2000 AET Project No. P-0006246 Date: October 13, 2021
Soil Boring, Pavement Core, and DCP
Pavement Core and DCP
Soil Boring
About 4.0 inches of bituiminous pavement FILL (about 6.5 inches), silty sand, fine to medium grained, a little gravel, greenish brown, moist (SM) SAND, fine grained, brown and dark brown, moist, possible fill (SP)
SAND, fine grained, brown, moist, medium dense (SP)
SAND WITH SILT, fine grained, brown, moist, loose (SP-SM)
End of boring at 6.0 feet
853.2
852.6
851.5
849.5
847.5
PAVEMENT
FILL
COARSE
ALLUVIUM
CORE
SS
SS
SS
M
M
M
LG: 30
WATER
LEVEL
DR:
9/21/21
6.0" Pavement Core
3.25" HSA
SURFACE ELEVATION:
BORING
COMPLETED:
DATE
6.0
DEPTH:
DRILLING
FLUID LEVEL
853.5
CAVE-IN
DEPTH
CASING
DEPTH
SAMPLED
DEPTH
9/21/21
TIME
DRILLING METHOD NOTE: REFER TO
THE ATTACHED
SHEETS FOR AN
EXPLANATION OF
TERMINOLOGY ON
THIS LOG
Rig:
6.0
GM
0-4.0"
4.0"-4.0' None4.0
WATER LEVEL MEASUREMENTS
None
TT
qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-01 (p. 1 of 1)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G D
T
/1
2/
About 2.0 inches of bituminous pavement FILL (about 1.5 inches), silty sand, fine grained, a little gravel, greenish brown, moist, with lenses of sandy lean clay
(SM)
About 2.0 inches of bituminous pavement FILL (about 7.25 inches), silty sand, fine grained, greenish brown, moist (SM) FILL, sand with silt, fine to medium grained, very dark brown, moist
(SP-SM)
SAND WITH SILT, fine to medium grained, dark brown, moist, loose
(SP-SM)
SAND, fine to medium grained, grayish brown to light brown, medium dense
(SP)
End of boring at 6.0 feet
853.3 853.2 853.0
852.4
851.5
849.8
847.5
PAVEMENT
FILL
PAVEMENT
FILL
COARSE
ALLUVIUM
CORE
SS
SS
SS
M
M
M
LG: 30
WATER
LEVEL
DR:
9/21/21
6.0" Pavement Core
3.25" HSA
SURFACE ELEVATION:
BORING
COMPLETED:
DATE
6.0
DEPTH:
DRILLING
FLUID LEVEL
853.5
CAVE-IN
DEPTH
CASING
DEPTH
SAMPLED
DEPTH
9/21/21
TIME
DRILLING METHOD NOTE: REFER TO
THE ATTACHED
SHEETS FOR AN
EXPLANATION OF
TERMINOLOGY ON
THIS LOG
Rig:
5.7
GM
0-2.0"
2.0"-4.0' None4.0
WATER LEVEL MEASUREMENTS
None
TT
qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-02 (p. 1 of 1)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
Sandy SILT with organics, very dark brown, moist (OL) SAND WITH SILT, fine to medium grained, dark brown, moist, loose to medium dense, with trace roots from 5 inches to 2 feet (SP-SM)
SAND, fine to medium grained, yellowish brown to grayish brown, moist, loose to medium dense (SP)
SAND, fine grained, a little gravel, white and orangish brown, moist to wet, dense (SP)
End of boring at 10.0 feet
852.6
850.0
845.0
843.0
TOPSOIL
COARSE
ALLUVIUM
SS
SS
SS
SS
SS
M
M
M
M
M/W
LG: 30
WATER
LEVEL
DR:
9/21/21
3.25" HSA
SURFACE ELEVATION:
BORING
COMPLETED:
DATE
10.0
10.0
DEPTH:
DRILLING
FLUID LEVEL
853.0
CAVE-IN
DEPTH
CASING
DEPTH
SAMPLED
DEPTH
9/21/21
9/21/21
TIME
DRILLING METHOD NOTE: REFER TO
THE ATTACHED
SHEETS FOR AN
EXPLANATION OF
TERMINOLOGY ON
THIS LOG
Rig:
8.3
8.3
GM
0-8.0' None
None
8.0
8.0
WATER LEVEL MEASUREMENTS
None
None
TT
qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-03 (p. 1 of 1)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
About 3.5 inches of bituminous pavement FILL (about 8.25 inches), silty sand with gravel, fine grained, dark greenish brown, moist (SM) SAND WITH SILT, fine grained, dark brown, moist (SP-SM)
SILTY SAND, fine to medium grained, dark brown, moist, medium dense (SM)
SAND, fine to medium grained, light brown, moist, loose (SP)
End of boring at 6.0 feet
854.2
853.5
852.5
850.5
848.5
PAVEMENT
FILL
COARSE
ALLUVIUM
CORE
SS
SS
SS
M
M
M
LG: 30
WATER
LEVEL
DR:
9/20/21
6.0" Pavement Core
3.25" HSA
SURFACE ELEVATION:
BORING
COMPLETED:
DATE
6.0
DEPTH:
DRILLING
FLUID LEVEL
854.5
CAVE-IN
DEPTH
CASING
DEPTH
SAMPLED
DEPTH
9/20/21
TIME
DRILLING METHOD NOTE: REFER TO
THE ATTACHED
SHEETS FOR AN
EXPLANATION OF
TERMINOLOGY ON
THIS LOG
Rig:
5.6
GM
0-3.5"
3.5"-4.0' None4.0
WATER LEVEL MEASUREMENTS
None
TT
qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-04 (p. 1 of 1)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
About 2.5 inches of bituminous pavement FILL (about 4.0 inches), layers of gravelly sand with silt and silty sand, fine to medium and fine grained, brown and greenish brown, moist, with lenses of sandy lean clay FILL, sand with silt, fine grained, very dark brown, moist (SP-SM) FILL, sand, fine to medium grained, brown, moist (SP) SILTY SAND, fine to medium grained, dark brown, moist, medium dense (SM)
SAND, fine to medium grained, brown to light brown, moist, loose to medium dense (SP)
SAND, fine grained, white, medium dense (SP)
End of boring at 10.0 feet
853.3
853.0
851.5
851.1
849.5
845.5
843.5
PAVEMENT
FILL
COARSE
ALLUVIUM
CORE
SS
SS
SS
SS
SS
M
M
M
M
M
LG: 30
WATER
LEVEL
DR:
9/21/21
6.0" Pavement Core
3.25" HSA
SURFACE ELEVATION:
BORING
COMPLETED:
DATE
10.0
DEPTH:
DRILLING
FLUID LEVEL
853.5
CAVE-IN
DEPTH
CASING
DEPTH
SAMPLED
DEPTH
9/21/21
TIME
DRILLING METHOD NOTE: REFER TO
THE ATTACHED
SHEETS FOR AN
EXPLANATION OF
TERMINOLOGY ON
THIS LOG
Rig:
9.7
GM
0-2.5"
2.5"-8.0' None8.0
WATER LEVEL MEASUREMENTS
None
TT
qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-05 (p. 1 of 1)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
About 3.75 inches of bituminous pavement FILL (about 4.75 inches), layers of gravelly sand with silt and silty sand, fine to coarse and fine grained, brown and greenish brown, moist, with laminations of sandy lean clay FILL, sand, fine grained, a little gravel, brown, moist, with lenses of silty sand
(SP)
SAND WITH SILT, fine to medium grained, brown, moist, medium dense
(SP-SM)
SAND, fine to medium grained, light brown to light gray, moist, medium dense (SP)
SAND, fine grained, light gray, moist, medium dense (SP)
End of boring at 10.0 feet
853.2
852.8
851.5
849.5
845.5
843.5
PAVEMENT
FILL
COARSE
ALLUVIUM
CORE
SS
SS
SS
SS
SS
M
M
M
M
M
LG: 30
WATER
LEVEL
DR:
9/21/21
6.0" Pavement Core
3.25" HSA
SURFACE ELEVATION:
BORING
COMPLETED:
DATE
10.0
DEPTH:
DRILLING
FLUID LEVEL
853.5
CAVE-IN
DEPTH
CASING
DEPTH
SAMPLED
DEPTH
9/21/21
TIME
DRILLING METHOD NOTE: REFER TO
THE ATTACHED
SHEETS FOR AN
EXPLANATION OF
TERMINOLOGY ON
THIS LOG
Rig:
9.7
GM
0-3.75"
3.75"-8.0' None8.0
WATER LEVEL MEASUREMENTS
None
TT
qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-06 (p. 1 of 1)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
FILL, silty sand with organics, fine to medium grained, very dark brown, moist
(SM)
FILL, sand with silt, fine to medium grained, dark brown, moist (SP-SM)
SAND, fine to medium grained, dark brown, moist, loose (SP)
SAND, fine to medium grained, light gray, moist, medium dense, with sandstone pieces (SP)
SAND, fine to medium grained, brown to light gray, moist to waterbearing, loose to medium dense (SP)
852.3
850.0
848.0
846.0
TOPSOIL /
FILL
FILL
COARSE
ALLUVIUM
SS
SS
SS
SS
SS
SS
M
M
M
M
M
M/W
LG: 30
WATER
LEVEL
DR:
9/21/21
3.25" HSA
SURFACE ELEVATION:
BORING
COMPLETED:
DATE
16.0
16.0
16.0
16.0
DEPTH:
DRILLING
FLUID LEVEL
854.0
CAVE-IN
DEPTH
CASING
DEPTH
SAMPLED
DEPTH
9/21/21
9/21/21
9/21/21
9/21/21
TIME
DRILLING METHOD NOTE: REFER TO
THE ATTACHED
SHEETS FOR AN
EXPLANATION OF
TERMINOLOGY ON
THIS LOG
Rig:
13.5
13.1
12.7
12.7GM
0-14.0' None
None
None
None
14.0
14.0
14.0
14.0
WATER LEVEL MEASUREMENTS
11.5
11.3
10.8
10.6TT
qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-07 (p. 1 of 2)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
SAND, fine to medium grained, brown to light gray, moist to waterbearing, loose to medium dense (SP) (continued)
End of boring at 16.0 feet 838.0
SS
SS
W
W qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-07 (p. 2 of 2)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
About 2.75 inches of bituminous pavement FILL (about 6.75 inches), gravelly silty sand, fine to coarse grained, brown, moist (SM) FILL, silty sand with gravel, fine grained, greenish brown, moist (SM) FILL, sand, fine grained, dark brown to brown, moist (SP) SAND WITH SILT, fine to medium grained, dark brown, moist, medium dense (SP-SM)
SAND, fine to medium grained, dark brown to brown, moist, medium dense
(SP)
End of boring at 6.0 feet
852.8
852.3
851.9
851.0
849.0
847.0
PAVEMENT
FILL
COARSE
ALLUVIUM
CORE
SS
SS
SS
M
M
M
LG: 30
WATER
LEVEL
DR:
9/20/21
6.0" Pavement Core
3.25" HSA
SURFACE ELEVATION:
BORING
COMPLETED:
DATE
6.0
DEPTH:
DRILLING
FLUID LEVEL
853.0
CAVE-IN
DEPTH
CASING
DEPTH
SAMPLED
DEPTH
9/20/21
TIME
DRILLING METHOD NOTE: REFER TO
THE ATTACHED
SHEETS FOR AN
EXPLANATION OF
TERMINOLOGY ON
THIS LOG
Rig:
5.8
GM
0-2.75"
2.75"-4.0' None4.0
WATER LEVEL MEASUREMENTS
None
TT
qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-08 (p. 1 of 1)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
FILL, silty sand with organics, fine to medium grained, very dark brown, moist
(SM)
FILL, gravelly silty sand, fine to medium grained, brown, moist, with lenses of sandy lean clay (SM) FILL, silty sand, fine to medium grained, dark brown, moist (SM) SAND WITH SILT, fine to medium grained, brown, moist, medium dense
(SP-SM)
SAND, fine to medium grained, brown to white, moist, medium dense (SP)
End of boring at 10.0 feet
852.0
851.4
850.5
849.5
842.5
TOPSOIL /
FILL
FILL
COARSE
ALLUVIUM
SS
SS
SS
SS
SS
M
M
M
M
M
LG: 30
WATER
LEVEL
DR:
9/21/21
3.25" HSA
SURFACE ELEVATION:
BORING
COMPLETED:
DATE
10.0
DEPTH:
DRILLING
FLUID LEVEL
852.5
CAVE-IN
DEPTH
CASING
DEPTH
SAMPLED
DEPTH
9/21/21
TIME
DRILLING METHOD NOTE: REFER TO
THE ATTACHED
SHEETS FOR AN
EXPLANATION OF
TERMINOLOGY ON
THIS LOG
Rig:
10.0
GM
0-8.0' None8.0
WATER LEVEL MEASUREMENTS
None
TT
qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-09 (p. 1 of 1)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
About 3.0 inches of bituminous pavement End of pavement core at 3.0 inches
852.3 PAVEMENT CORE
LG: NA
WATER
LEVEL
DR:
9/20/21
6.0" Pavement Core
SURFACE ELEVATION:
BORING
COMPLETED:
DATE
NA
DEPTH:
DRILLING
FLUID LEVEL
852.5
CAVE-IN
DEPTH
CASING
DEPTH
SAMPLED
DEPTH
9/20/21
TIME
DRILLING METHOD NOTE: REFER TO
THE ATTACHED
SHEETS FOR AN
EXPLANATION OF
TERMINOLOGY ON
THIS LOG
Rig:
NA
GM
0-3.0"
NANA
WATER LEVEL MEASUREMENTS
None
TT
qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-10 (p. 1 of 1)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
About 3.5 inches of bituminous pavement End of pavement core at 3.5 inches
852.2 PAVEMENT CORE
LG: NA
WATER
LEVEL
DR:
9/20/21
6.0" Pavement Core
SURFACE ELEVATION:
BORING
COMPLETED:
DATE
NA
DEPTH:
DRILLING
FLUID LEVEL
852.5
CAVE-IN
DEPTH
CASING
DEPTH
SAMPLED
DEPTH
9/20/21
TIME
DRILLING METHOD NOTE: REFER TO
THE ATTACHED
SHEETS FOR AN
EXPLANATION OF
TERMINOLOGY ON
THIS LOG
Rig:
NA
GM
0-3.5"
NANA
WATER LEVEL MEASUREMENTS
None
TT
qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-11 (p. 1 of 1)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
Sandy SILT with organics, very dark brown, moist (OL)
SAND WITH SILT, fine to medium grained, brown, moist, very loose to loose (SP-SM)
SAND, fine to medium grained, brown to light brown, moist, loose to medium dense (SP)
SAND, fine grained, yellowish brown, moist, medium dense (SP)
SAND, fine to medium grained, light grayish brown, moist to waterbearing, loose to medium dense (SP)
850.9
848.5
845.5
843.5
TOPSOIL
COARSE
ALLUVIUM SS
SS
SS
SS
SS
SS
M
M
M
M
M
M/W
LG: 30
WATER
LEVEL
DR:
9/21/21
3.25" HSA
SURFACE ELEVATION:
BORING
COMPLETED:
DATE
12.0
12.0
DEPTH:
DRILLING
FLUID LEVEL
851.5
CAVE-IN
DEPTH
CASING
DEPTH
SAMPLED
DEPTH
9/21/21
9/21/21
TIME
DRILLING METHOD NOTE: REFER TO
THE ATTACHED
SHEETS FOR AN
EXPLANATION OF
TERMINOLOGY ON
THIS LOG
Rig:
10.6
10.4
GM
0-14.0' None
None
10.0
10.0
WATER LEVEL MEASUREMENTS
10.4
10.4
TT
qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-12 (p. 1 of 2)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
SAND, fine to medium grained, light grayish brown, moist to waterbearing, loose to medium dense (SP) (continued)
End of boring at 16.0 feet 835.5
SS
SS
W
W qp %-#200
ELEV.
FEET
P-0006246
GEOLOGY
AMERICAN
ENGINEERING
TESTING, INC.
MC
MATERIAL DESCRIPTION
REC
IN.
AET JOB NO:
PROJECT:
LOG OF BORING NO.
01-DHR-060
PLWC
DEPTH
IN
FEET
FIELD & LABORATORY TESTS
SAMPLE
TYPEN
LL
03/2011
SUBSURFACE BORING LOG
Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
SB-12 (p. 2 of 2)
A E
T
C O
R P
W -E
LE
V
P -0
F O
R T
M C
C O
Y
B D
3.
G P
J A
E T
C
P T
W
E
LL
.G
0.0010.010.1110100
3/4 30 medium
D10 coarse
4 14081.5 6 200100
GRAIN SIZE IN MILLIMETERS
Specimen Identification
Specimen Identification
MC% LL PL PI Cc
SILT OR CLAY
GRADATION CURVES
0.0
1.2
0.0
0.0
27.6
%Sand %Silt %Clay
95.8
75.1
92.5
99.7
51.6
%Gravel
SAND
fine
D30
D60
U.S. SIEVE NUMBERS
20161410
U.S. SIEVE OPENING IN INCHES HYDROMETER
2.8
3.3
2.1
0.84
1.27
0.86
SB-02
SB-02
SB-03
SB-06
1.4'
0.8'
1.5'
5.0'
0.5'
1.4'
0.8'
1.5'
5.0'
0.5'
SB-01
SB-02
SB-02
SB-03
SB-06
1/2
P E R C E N T
F I N E R
B Y
W E I G H T
Sand, f grained (SP)
Silty sand, f grained (SM)
Sand with silt, f to m grained (SP-SM)
Sand, f to m grained (SP)
Silty sand with gravel, f to c grained (SM)
3/8
4.75
9.50
4.75
4.75
19.00
0.23
0.14
0.29
0.36
1.56
0.128
0.084
0.180
0.229
0.112
Classification Cu
D100
6 70504
GRAVEL
fine
COBBLES
coarse
0.0846
0.0877
0.1689
4.2
23.6
7.5
0.3
20.8
9/21/21 Proposed Site Improvements; Fort McCoy - Building 2000; Fort McCoy, Wisconsin
PROJECT AET JOB NO.
DATE
P-0006246
AMERICAN
0.0010.010.1110100
3/4 30 medium
D10 coarse
4 14081.5 6 200100
GRAIN SIZE IN MILLIMETERS
Specimen Identification
Specimen Identification
MC% LL PL PI Cc
SILT OR CLAY
GRADATION CURVES
6.8
0.3
33.9
22.0
0.0
%Sand %Silt %Clay
88.7
96.1
47.2
48.2
95.4
%Gravel
SAND
fine
D30
D60
U.S. SIEVE NUMBERS
20161410
U.S.…