W911SA22B2007 Attachment 5 BID SCHEDULE FLOORING IDIQ FY22-FY25.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Flooring IDIQ Fort McCoy WI Federal contract opportunity
Solicitation number
W911SA22B2007
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort McCoy

View the file

Other files for this federal contract opportunity

Other files attached to Flooring IDIQ Fort McCoy WI, newest first.
File Type Posted
W911SA22B2007 Bid Abstract.pdf PDF
W911SA22B2007 Site Visit Sign In Sheet.pdf PDF
W911SA22B2007 Attachment 1 AT OPSEC.pdf PDF
W911SA22B2007 Attachment 3 Drawings.pdf PDF
W911SA22B2007 Attachment 4 Wage Determination - 10242022.pdf PDF
W911SA22B2007 Attachment 6 SF24.pdf PDF
W911SA22B2007 Solicitation.pdf PDF
W911SA22B2007 Attachment 2 Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clin 0001 Base

BID SCHEDULE

BASE YEAR FY22 - FY25

FLOORING IDIQ CONTRACT

FORT MCCOY, WISCONSIN

Furnish all labor, tools, equipment, materials, transportation, and supervision to install flooring at Fort McCoy, Wisconsin in accordance with specifications and drawings.
BUILDING NUMBER
CLIN 0001
LINE ITEMDESIGNATIONQUANTITYU/MUNIT PRICEAMOUNT
ARemoval of Resilient Flooring (Non-Asbestos)20000SF$0.00
BRemoval of Ceramic or Quarry Tile900SF$0.00
CRemoval of Carpet or Carpet Tile1000SY$0.00
DRemoval of Gypcrete underlayment4000SF$0.00
ERemoval of Asbestos Flooring4000SF$0.00
FRemoval of Stair Treads and Risers250LF$0.00
GRemoval of Resilient Stair Stringers250LF$0.00
HRemove, Store, and Reinstall Furniture / Appliances12500SF$0.00
IRemove and Reinstall Toilets18EA$0.00
JRemove and Reinstall Toilet Partitions125LF$0.00
KRemove and Reinstall Doors25EA$0.00
LTrim Wood Doors8EA$0.00
MTrim Metal Doors8EA$0.00
NInstall Plywood Subfloor2000SF$0.00
OFurnish and Install Vinyl Tile (VCT)10000SF$0.00
PFurnish and Install LVT Flooring (FLOATING)2500SF$0.00
QFurnish and Install LVT Flooring (GLUE DOWN)850SF$0.00
RFurnish and Install Rubber Tile400SF$0.00
SFurnish and Install Rubber Sheet Flooring7500SF$0.00
TFurnish and Install Heat or Cold Welds2000LF$0.00
UFurnish and Install Chemical Welds300LF$0.00
VFurnish and Install Vinyl and Rubber Flash Coving750LF$0.00
WFurnish and Install Glue Down Carpet1000SY$0.00
XFurnish and Install Carpet Tiles500SY$0.00
YFurnish and Install Ceramic Floor Tile Including Base600SF$0.00
ZFurnish and Install Quarry Floor Tile Including Base350SF$0.00
AAFurnish and Install Wall Tile Including All Components350SF$0.00
BBFurnish and Install Rubber Stair Treads and Risers250LF$0.00
CCFurnish and Install Rubber Stringers250LF$0.00
DDFurnish and Install Resilient Cove Base9000LF$0.00
EEFurnish and Install Resilient Transitions150LF$0.00
FFFurnish and Install Base & Shoe Moulding800LF$0.00
GGFurnish and Install Cementitious Underlayment20000SF$0.00
HHFurnish and Install Cementitious Self-Leveling1000SF$0.00
IIFurnish and Install Backer Board600SF$0.00
JJFurnish and Install FRP750SF$0.00
KKRepair Drywall200SF$0.00
LLPaint Walls1500SF$0.00
CLIN 0001 TOTAL$0.00
CLIN 0001UNFORSEEN CONDITIONS
LINE ITEMDESIGNATIONQUANTITYU/MUNIT PRICEAMOUNT
ARemove Cementitious Underlayment5000SF$0.00
BReplace Subfloor5000SF$0.00
CReplace Plank Flooring5000SF$0.00
DReplace Floor Joists375LF$0.00
EReplace Rim Joists200LF$0.00
FRemoval of Additional Layer(s) of Asbestos Flooring5000SF$0.00
GRemoval of Additional Layer(s) of Flooring7500SF$0.00
HInstall 2x4 Sleepers5000LF$0.00
IInstall Additional Plywood Subfloor7500SF$0.00
CLIN 0002 TOTAL$0.00
CLIN 0001 TOTAL$0.00
CLIN 0002 TOTAL$0.00
BASE YEAR TOTAL$0.00
BASE YR$0.00
OPT YR 1$0.00
OTP YR 2$0.00
$0.00

Opt Year 1 Clin 1001

BID SCHEDULE

OPTION YEAR 1 FY22 - FY25

FLOORING IDIQ CONTRACT

FORT MCCOY, WISCONSIN

Furnish all labor, tools, equipment, materials, transportation, and supervision to install flooring at Fort McCoy, Wisconsin in accordance with specifications and drawings.
BUILDING NUMBER
CLIN 1001
LINE ITEMDESIGNATIONQUANTITYU/MUNIT PRICEAMOUNT
ARemoval of Resilient Flooring (Non-Asbestos)20000SF$0.00$0.00
BRemoval of Ceramic or Quarry Tile900SF$0.00$0.00
CRemoval of Carpet or Carpet Tile1000SY$0.00$0.00
DRemoval of Gypcrete underlayment4000SF$0.00$0.00
ERemoval of Asbestos Flooring4000SF$0.00$0.00
FRemoval of Stair Treads and Risers250LF$0.00$0.00
GRemoval of Resilient Stair Stringers250LF$0.00$0.00
HRemove, Store, and Reinstall Furniture / Appliances12500SF$0.00$0.00
IRemove and Reinstall Toilets18EA$0.00$0.00
JRemove and Reinstall Toilet Partitions125LF$0.00$0.00
KRemove and Reinstall Doors25EA$0.00$0.00
LTrim Wood Doors8EA$0.00$0.00
MTrim Metal Doors8EA$0.00$0.00
NInstall Plywood Subfloor2000SF$0.00$0.00
OFurnish and Install Vinyl Tile (VCT)10000SF$0.00$0.00
PFurnish and Install LVT Flooring (FLOATING)2500SF$0.00$0.00
QFurnish and Install LVT Flooring (GLUE DOWN)850SF$0.00$0.00
RFurnish and Install Rubber Tile400SF$0.00$0.00
SFurnish and Install Rubber Sheet Flooring7500SF$0.00$0.00
TFurnish and Install Heat or Cold Welds2000LF$0.00$0.00
UFurnish and Install Chemical Welds300LF$0.00$0.00
VFurnish and Install Vinyl and Rubber Flash Coving750LF$0.00$0.00
WFurnish and Install Glue Down Carpet1000SY$0.00$0.00
XFurnish and Install Carpet Tiles500SY$0.00$0.00
YFurnish and Install Ceramic Floor Tile Including Base600SF$0.00$0.00
ZFurnish and Install Quarry Floor Tile Including Base350SF$0.00$0.00
AAFurnish and Install Wall Tile Including All Components350SF$0.00$0.00
BBFurnish and Install Rubber Stair Treads and Risers250LF$0.00$0.00
CCFurnish and Install Rubber Stringers250LF$0.00$0.00
DDFurnish and Install Resilient Cove Base9000LF$0.00$0.00
EEFurnish and Install Resilient Transitions150LF$0.00$0.00
FFFurnish and Install Base & Shoe Moulding800LF$0.00$0.00
GGFurnish and Install Cementitious Underlayment20000SF$0.00$0.00
HHFurnish and Install Cementitious Self-Leveling1000SF$0.00$0.00
IIFurnish and Install Backer Board600SF$0.00$0.00
JJFurnish and Install FRP750SF$0.00$0.00
KKRepair Drywall200SF$0.00$0.00
LLPaint Walls1500SF$0.00$0.00
CLIN 1001 TOTAL$0.00
CLIN 1002UNFORSEEN CONDITIONS
LINE ITEMDESIGNATIONQUANTITYU/MUNIT PRICEAMOUNT
ARemove Cementitious Underlayment5000SF$0.00$0.00
BReplace Subfloor5000SF$0.00$0.00
CReplace Plank Flooring5000SF$0.00$0.00
DReplace Floor Joists375LF$0.00$0.00
EReplace Rim Joists200LF$0.00$0.00
FRemoval of Additional Layer(s) of Asbestos Flooring5000SF$0.00$0.00
GRemoval of Additional Layer(s) of Flooring7500SF$0.00$0.00
HInstall 2x4 Sleepers5000LF$0.00$0.00
IInstall Additional Plywood Subfloor7500SF$0.00$0.00
CLIN 1002 TOTAL$0.00
CLIN 1001 TOTAL$0.00
CLIN 1002 TOTAL$0.00
OPTION YR 1 TOTAL$0.00

Opt Year 2 Clin 2001

BID SCHEDULE

OPTION YEAR 2 FY22 - FY25

FLOORING IDIQ CONTRACT

FORT MCCOY, WISCONSIN

Furnish all labor, tools, equipment, materials, transportation, and supervision to install flooring at Fort McCoy, Wisconsin in accordance with specifications and drawings.
BUILDING NUMBER
CLIN 2001
LINE ITEMDESIGNATIONQUANTITYU/MUNIT PRICEAMOUNT
ARemoval of Resilient Flooring (Non-Asbestos)20000SF$0.00$0.00
BRemoval of Ceramic or Quarry Tile900SF$0.00$0.00
CRemoval of Carpet or Carpet Tile1000SY$0.00$0.00
DRemoval of Gypcrete underlayment4000SF$0.00$0.00
ERemoval of Asbestos Flooring4000SF$0.00$0.00
FRemoval of Stair Treads and Risers250LF$0.00$0.00
GRemoval of Resilient Stair Stringers250LF$0.00$0.00
HRemove, Store, and Reinstall Furniture / Appliances12500SF$0.00$0.00
IRemove and Reinstall Toilets18EA$0.00$0.00
JRemove and Reinstall Toilet Partitions125LF$0.00$0.00
KRemove and Reinstall Doors25EA$0.00$0.00
LTrim Wood Doors8EA$0.00$0.00
MTrim Metal Doors8EA$0.00$0.00
NInstall Plywood Subfloor2000SF$0.00$0.00
OFurnish and Install Vinyl Tile (VCT)10000SF$0.00$0.00
PFurnish and Install LVT Flooring (FLOATING)2500SF$0.00$0.00
QFurnish and Install LVT Flooring (GLUE DOWN)850SF$0.00$0.00
RFurnish and Install Rubber Tile400SF$0.00$0.00
SFurnish and Install Rubber Sheet Flooring7500SF$0.00$0.00
TFurnish and Install Heat or Cold Welds2000LF$0.00$0.00
UFurnish and Install Chemical Welds300LF$0.00$0.00
VFurnish and Install Vinyl and Rubber Flash Coving750LF$0.00$0.00
WFurnish and Install Glue Down Carpet1000SY$0.00$0.00
XFurnish and Install Carpet Tiles500SY$0.00$0.00
YFurnish and Install Ceramic Floor Tile Including Base600SF$0.00$0.00
ZFurnish and Install Quarry Floor Tile Including Base350SF$0.00$0.00
AAFurnish and Install Wall Tile Including All Components350SF$0.00$0.00
BBFurnish and Install Rubber Stair Treads and Risers250LF$0.00$0.00
CCFurnish and Install Rubber Stringers250LF$0.00$0.00
DDFurnish and Install Resilient Cove Base9000LF$0.00$0.00
EEFurnish and Install Resilient Transitions150LF$0.00$0.00
FFFurnish and Install Base & Shoe Moulding800LF$0.00$0.00
GGFurnish and Install Cementitious Underlayment20000SF$0.00$0.00
HHFurnish and Install Cementitious Self-Leveling1000SF$0.00$0.00
IIFurnish and Install Backer Board600SF$0.00$0.00
JJFurnish and Install FRP750SF$0.00$0.00
KKRepair Drywall200SF$0.00$0.00
LLPaint Walls1500SF$0.00$0.00
CLIN 2001 TOTAL$0.00
CLIN 2002UNFORSEEN CONDITIONS
LINE ITEMDESIGNATIONQUANTITYU/MUNIT PRICEAMOUNT
ARemove Cementitious Underlayment5000SF$0.00$0.00
BReplace Subfloor5000SF$0.00$0.00
CReplace Plank Flooring5000SF$0.00$0.00
DReplace Floor Joists375LF$0.00$0.00
EReplace Rim Joists200LF$0.00$0.00
FRemoval of Additional Layer(s) of Asbestos Flooring5000SF$0.00$0.00
GRemoval of Additional Layer(s) of Flooring7500SF$0.00$0.00
HInstall 2x4 Sleepers5000LF$0.00$0.00
IInstall Additional Plywood Subfloor7500SF$0.00$0.00
CLIN 2002 TOTAL$0.00
CLIN 2001 TOTAL$0.00
CLIN 2002 TOTAL$0.00
OPTION YR 2 TOTAL$0.00

File details come from the government source that posted it. Updated .