W911SA21T2000 Amendment 0001.docx
DOCX document 35 KB Posted
- Attached to
- B1364 Increase Hot Water Capabilities Federal contract opportunity
- Solicitation number
- W911SA21T2000
About this file
This document contains an amendment to a federal solicitation for increasing hot water capabilities at a barracks facility on Fort McCoy, Wisconsin. The solicitation will be issued as a Request for Quotes to provide all labor, materials, equipment, transportation, and supervision necessary to complete the work. The requirement is set aside for small businesses with a size standard of $16.5 million. Quotes are due by July 21, 2021. The period of performance is 120 days from notice to proceed. The magnitude is between $100,000 to $500,000. Interested vendors can subscribe to receive notifications of solicitation postings and amendments on SAM.gov. Site visits will be conducted following COVID-19 safety protocols with a maximum of two attendees per firm.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SA21T2000 Amendment 0002.docx | DOCX document | |
| W911SA21T2000 Attachment 4 Wage Determination 9 July 2021.docx | DOCX document | |
| W911SA21T2000 Attachment 2 Specifications 8 July 2021.pdf | ||
| W911SA21T2000 Site-visit sign-in.pdf | ||
| W911SA21T2000 Attachment 2 Specifications.pdf | ||
| W911SA21T2000 Attachment 1 AT OPSEC.pdf | ||
| W911SA21T2000 Attachment 5 SF 24 Sample.pdf | ||
| W911SA21T2000 Solicitation.docx | DOCX document | |
| W911SA21T2000 Attachment 3 Drawings.pdf | ||
| W911SA21T2000 Attachment 4 Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SA21T2000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 13-Jul-2021 02:30 PM to 21-Jul-2021 02:30 PM.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
QUESTIONS AND ANSWERS
Is the existing hot water piping in the corridors to be CPVC per 22 11 26 – 7? CPVC Pipe: ASTM F441/F441M, Schedule 80, chlorinated polyvinyl chloride (CPVC) material. Fittings: ASTM F439, CPVC, Schedule 80, socket type Joints: ASTM D2846/D2846M, solvent weld with ASTM F493 solvent cement. Prime joints with a contrasting color.
ANSWER: Use section 22 11 26 par 2.01 A or B. Sub paragraphs C & D not used for this contract.
Is it the intention for the piping in the hallways and outside of the mechanical room to be per the above specification for CPVC or is it at the discretion of the contractor or is it the intention for the piping to be copper or other types of piping listed ?
ANSWER: See answer text for question 1.
Is it the intention for the piping within the mechanical room to be per the above specifications for CPVC or is it at the discretion of the contractor or is it the intention for the piping to be copper or other types of piping listed?
ANSWER: See answer text for question 1.
What is the current installed brand and style of ceiling tiles?
ANSWER: Brand Name unavailable, See section 09 51 10.
If tiles are damaged during repairs is a new tile installed in its place acceptable or is the owner going to require replacement of a larger area to match and if so to what extent?
ANSWER: The contractor has to estimate how tiles will be damaged and have to be replaced. The replacements must match, see section 09 51 10.
I do not see in the specifications if factory start up is required for the new water heaters. Is this required?
ANSWER: Install new water heaters in accordance with manufacturer’s recommendations.
Will the building be occupied at any time during the construction? And if so to what extent is domestic hot water going to be required and where? Or is the intention for the GC to provide alternate facilities for rest rooms etc.?
ANSWER: Training will be occurring, the classrooms/restrooms will be required for use. Billeting will be unoccupied. Cold water service is required, hot water service is not required. See amended specification section 01 12 10 par 1.01 C.
If domestic hot water is to remain to an area, what is the intention to accomplish this? Or will cold water only and hand sanitizer would suffice?
ANSWER: See answer to question 7.
After repairs, is the building required to be disinfected with chlorine and if so to what extent. Reference section 22 11 26 – 14 3.07. If so is this just the hot water portion of the piping or the entire building?
ANSWER: See Par 3.06, it requires to test domestic water piping system in accordance with applicable codes, disinfect system accordingly.
Section 22 11 26 – 14 3.07 calls for a new water service is this required or are hidden items in the spec like this to be ignored and are to just pay attention to the specs where they apply to the drawings?
ANSWER: There is no reference to a new water service in par 3.07. A new water service is not required as per par 3.05.
If we are held to the entire specification how are we to bid not knowing the owners intentions and then be held to the more stringent concern of spec and plans?
ANSWER: This is too general of a statement to answer. Bid it to the specification and drawing requirements.
Are we to match the existing pipe insulation materials or simply follow the specs? We see Rubatex Rubber type insulation installed but 22 11 26 2.16 A. calls out: Domestic hot, cold and re-circulated hot water piping shall be insulated with 1” thickness glass fiber insulation meeting current energy and building code. Insulation shall include vapor barrier and all service jacket.
ANSWER: Follow the specification.
The following have been modified:
SUPPLEMENTAL INFORMATION
Contract Specialist:
Michelle Harvey Phone: 608-388-1250 E-mail: michelle.m.harvey3.civ@mail.mil
Contracting Officer:
Steve Bailey Phone: 608-388-6077 Email: steven.m.bailey2.civ@mail.mil
CONTRACT MAGNITUDE: The magnitude of this contract is between $100,000 and $500,000
Any questions concerns, verification or clarification of information of the documents included in the solicitation package shall be submitted in writing and submitted to the Contract Specialist identified herein no later than 11:00 AM, local time CST on 01 July 2021. Include in the subject line of the email the Government’s solicitation number; failure to do so will lessen the Government’s ability to ensure all questions are considered during the bidding process. Provide your company name, POC and contact information in the body of the email.
Include the following with the quote package:
| Completed SF1442 with acknowledgement of all amendments |
| Completed SF 24, if quote exceeds $150,000.00 |
| Any additional verification documents |
Quotes shall be submitted via email to michelle.m.harvey3.civ@mail.mil by the due date and time listed in Block 13.
SITE VISIT: In response to the COVID-19 pandemic and the President’s declaration of a National Emergency concerning COVID-19 on 13 March 2020, MICC Ft McCoy is following the recommended safety guidelines imposed by the World Health Organization (WHO) and the Centers for Disease Control and Prevention (CDC) to mitigate the spread of COVID-19, therefore, the procedures for Site Visits are hereby changed as detailed in the following paragraphs.
1. RSVP for site visit are required 48 hours before the site visit, if the site visit is on Tuesday, all site visit RSVPs are due on the preceding Friday– Please email the Contract Specialist if your company will be attending and how many people from your firm will be attending. – please include the solicitation number in the subject line of the email and the words “site visit”.
2. The names of people who are projected to attend, may change, especially due to any COV19 symptoms, we are not collecting people’s names, but rather the quantity of people who are attending. We will be limiting the groups to 10 at a time, therefore there will be staggering of groups if necessary.
3. Two people per firm are allowed to attend the site visit only; this includes any subcontractors who wish to attend. A Prime contractor can bring a subcontractor but then they have met their two person limit. Please clarify in your email to the Contract Specialist, how many people will be attending.
4. Face masks must be worn by all attending parties, we will not be providing face masks, ensure you bring one with you.
5. Six feet social distancing space to be accommodated at all times.
6. Bathrooms are accessible before and after the site visit for hand washing
7. Violation of these rules will be grounds for the person to be removed from the site visit
These ground rules will be followed by all attending the site visit and those conducting the site visit. This is to ensure the safety of the entire acquisition team, including the people attending and conducting the site visits. These measures ensure that all parties are following the CDC Guidelines to prevent the spread of COV19. If you have any symptoms or are unsure of your COV19 status, please do not attend the site visit. Please follow CDC Guidelines for self isolation if you have any symptoms as identified by the CDC.
Please ensure you arrive at Fort McCoy early enough to gain access to the installation prior to the beginning of the site visit. All parties will meet at the Contracting Office before visiting any site locations. Late arrivals will not be accommodated nor will any additional site visits be scheduled.
Please utilize the time before the site visit to become familiar with the documents.
In accordance with DPAP changes to reporting requirements under FAR 52.223-2, Affirmative Procurement of Bio-based Products under Service and Construction Contracts, contractors are now required to submit annual bio-based reports to the new reporting module in the System for Award Management (SAM). SAM can be accessed at www.sam.gov
The “Equal Employment Opportunity Is the Law” notice (poster) referenced in FAR clause 52.222-26(b)(3), Equal Opportunity, is located at http://www.dol.gov/ofccp/regs/compliance/posters/ofccpost.htm
In accordance with FAR 22.404-10, the contractor must post a copy of the wage determination and Department of Labor Form WH-1321 in a prominent place where employees working on federal construction contracts can easily see it. The applicable wage determination is incorporated into the contract at Section H. The WH-1321 poster is located at http://www.dol.gov/compliance/guide/index.htm
VETS-4212 Registration: You shall register on the VETS-4212 site to be considered for award. http://www.dol.cov/vets/vets-4212.html if you have a Government contract or subcontract in the amount of $150,000 or more that was entered into or modified on or after December 1, 2003.
still be required to negotiate quantities/specifications for the project with agreement/approval by the ordering official.
ATTACHMENTS: All referenced documents for this solicitation are available at the Government Point of Entry at https://beta.sam.gov Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
Attachments listed below will be incorporated into the resultant contract.
W911SA21T2000 Attachment 1 AT OPSEC W911SA21T2000 Attachment 2 Specifications 8 July 2021 W911SA21T2000 Attachment 3 Drawings W911SA21T2000 Attachment 4 Wage Determination W911SA21T2000 Attachment 5 SF 24 Sample
EVALUATION OF QUOTES
BASIS OF AWARD
This requirement shall be awarded utilizing Simplified Acquisition Procedures in accordance with Federal Acquisition Regulation (FAR) Part 13, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). Award will be made with reasonable promptness to the responsible bidder submitting the lowest responsive bid in accordance with requirements and provisions herein.
EVALUATION CRITERIA
The Government will evaluate quotes received in response to this solicitation solely on the basis of price and price related factors. Offerors shall submit a price for the item specified in the Schedule of Supplies/Services. No quote for a quantity less than that specified in the Schedule will be accepted. All prices quoted in response to this solicitation much include all costs associated with work elements, including but not limited to; applicable State taxes, permits, licensures, overall project management, superintendence, and quality control necessary for the planning and execution of work requirements throughout the performance period.
Only the Awardee will be required to provide Performance and Payment (P&P) Bonds, as is stated in this solicitation, P&P Bonds are not required to accompany the contractors bid.
Please fill out and provide:
DUNS ________________________________________
TAXPAYER ID # _______________________________
CAGE CODE__________________________________
(End of Summary of Changes) image1.wmf