W911SA20B2004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

CONTRACTOR Q&A

Q1. Is the government’s intention to have the new shade structure tie into the existing shed?

A1. No

Q2. Can plans and specs be provided for the building that the new shade structure will tie into / supplement?

A2. There will be no tying into the building.

Q3. Power will have to be pulled from shop adjacent to shade structure for the LED lights, will this be allowable from Panel M3A?

A3. Yes but only if there is space in the panel that is available and it will support the new load.

Q4. Will a copy of the sign in register be posted publicly or can it be sent to me?

A4. The site visit sign in sheet has been posted to the beta.SAM website.

Q5. What are the dimensions of the as built single slope lean-to on site (width x length x height at high side/low side)?

A5. The intent is not to tie in to existing building so the dimensions will not be relevant to this SOW.

Q6. Is there a soils report?

A6. No

Q7. Do we sawcut existing asphalt or will there be a slab to level the foundation?

A7. Foundation will be concrete footings. To establish the footings existing asphalt will be saw cut.

Q8. Do the soils need to be hauled off or is there somewhere on site to move to?

A8. Haul Off

Q9. Gutter and downspouts were not spec’d, will they be required?

A9. Yes, see SOW 4.1.5

Q10. Since the new structure will be higher than the existing, should the new overlap/cantilever over the old.

A10. Yes, gutters and downspouts will control water for the overlap over the old roof.

Q11. The new structure will have to have footings 3’ from existing and on frame line 4 a footing will be required at the abutment of the existing approx. 3ft in. Can we do this?

A11. Yes

Q12. The lot slopes in the area of the new canopy, so the foundation design will have to correct the slope. Will there be a requirement for a civil engineering certification for the foundation?

A12. No this is a cover only there will be no slab in this SOW.

Q13. Will the Government remove all materials (tires/wheels, etc.) that are currently in the work area?

A13. Yes

(End of Summary of Changes) image1.wmf