W911SA20B20040001 Solicitation Amendment 0001.docx
DOCX document 28 KB Posted
- Attached to
- 63rd RD MAID-IQ Region 3, AZ, NM, NV
- Solicitation number
- W911SA20B2004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911SA20B2004 Abstract of Offers.pdf | ||
| W911SA20B2004 Attachment 7 Wage Determinations.docx | DOCX document | |
| W911SA20B2004 Site Visit Sign In Sheet.pdf | ||
| W911SA20B2004 Attachment 4 SOW Seed Project.docx | DOCX document | |
| W911SA20B2004 Attachment 1 AT OPSEC.pdf | ||
| W911SA20B2004 Attachment 8 SF24.pdf | ||
| W911SA20B2004 Solicitation.docx | DOCX document | |
| W911SA20B2004 Attachment 6 Breakdown of Cost.xlsx | XLSX spreadsheet | |
| W911SA20B2004 Attachment 3 SOW.docx | DOCX document | |
| W911SA20B2004 Attachment 5 Drawings Seed Project.pdf | ||
| W911SA20B2004 Attachment 2 AT OPSEC Seed Project.pdf | ||
| W911SA20B2004 Attachment 7 Wage Determinations.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SA20B2004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
CONTRACTOR Q&A
Q1. Is the government’s intention to have the new shade structure tie into the existing shed?
A1. No
Q2. Can plans and specs be provided for the building that the new shade structure will tie into / supplement?
A2. There will be no tying into the building.
Q3. Power will have to be pulled from shop adjacent to shade structure for the LED lights, will this be allowable from Panel M3A?
A3. Yes but only if there is space in the panel that is available and it will support the new load.
Q4. Will a copy of the sign in register be posted publicly or can it be sent to me?
A4. The site visit sign in sheet has been posted to the beta.SAM website.
Q5. What are the dimensions of the as built single slope lean-to on site (width x length x height at high side/low side)?
A5. The intent is not to tie in to existing building so the dimensions will not be relevant to this SOW.
Q6. Is there a soils report?
A6. No
Q7. Do we sawcut existing asphalt or will there be a slab to level the foundation?
A7. Foundation will be concrete footings. To establish the footings existing asphalt will be saw cut.
Q8. Do the soils need to be hauled off or is there somewhere on site to move to?
A8. Haul Off
Q9. Gutter and downspouts were not spec’d, will they be required?
A9. Yes, see SOW 4.1.5
Q10. Since the new structure will be higher than the existing, should the new overlap/cantilever over the old.
A10. Yes, gutters and downspouts will control water for the overlap over the old roof.
Q11. The new structure will have to have footings 3’ from existing and on frame line 4 a footing will be required at the abutment of the existing approx. 3ft in. Can we do this?
A11. Yes
Q12. The lot slopes in the area of the new canopy, so the foundation design will have to correct the slope. Will there be a requirement for a civil engineering certification for the foundation?
A12. No this is a cover only there will be no slab in this SOW.
Q13. Will the Government remove all materials (tires/wheels, etc.) that are currently in the work area?
A13. Yes
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it. Updated .