Base Year
| BID SCHEDULE--BASE YEAR FY19-20 |
| ASPHALT PAVING IDIQ CONTRACT |
| FORT MCCOY, WISCONSIN |
| Furnish all labor,equipment, and material to deliver, construct, repair, and/or replace Asphalt pavements at Fort McCoy, Wisconsin, in accordance with specifications and drawings. |
| CLIN 0001 | |||||
| ITEM | DISIGNATION | QUANTITY | U/M | UNIT PRICE | AMOUNT |
| 0001 | Full Depth Patch | 2000 | SY | $0.00 | |
| 0002 | Pavement Removal < 4" | 10000 | SY | $0.00 | |
| 0003 | Pavement Removal > 4" | 4000 | CY | $0.00 | |
| 0004 | Pulverizing | 21875 | SY | $0.00 | |
| 0005 | Pavement Milling | 500 | SY | $0.00 | |
| 0006 | Subgrade/Subbase Preparation | 100000 | SY | $0.00 | |
| 0007 | Excavation | 5000 | CY | $0.00 | |
| 0008 | Subbase Material | 5000 | CY | $0.00 | |
| 0009 | Base Course Material | 5625 | CY | $0.00 | |
| 0010 | Prepare Existing Base | 100000 | SY | $0.00 | |
| 0011 | 2" Asphalt Lower Layer | 100000 | SY | $0.00 | |
| 0012 | 2" Asphalt Upper Layer | 100000 | SY | $0.00 | |
| 0013 | Shoulder Aggregate | 2800 | CY | $0.00 | |
| 0014 | Tack Coat | 100000 | SY | $0.00 | |
| 0015 | Pavement Marking--Roads | 15625 | LF | $0.00 | |
| 0016 | Parking Lot Marking | 438 | SP | $0.00 | |
| 0017 | Paint Symbols | 25 | EA | $0.00 | |
| 0018 | Striping Crosswalks | 1125 | LF | $0.00 | |
| 0019 | Layout of Pavement Marking, Mobilization | 13 | EA | $0.00 | |
| 0020 | 12" DIA HDPE Smooth Bore Culvert | 250 | LF | $0.00 | |
| 0021 | 18" DIA HDPE Smooth Bore Culvert | 250 | LF | $0.00 | |
| 0022 | 24" DIA HDPE Smooth Bore Culvert | 250 | LF | $0.00 | |
| 0023 | 12" DIA HDPE Smooth Bore Apron | 50 | EA | $0.00 | |
| 0024 | 18" DIA HDPE Smooth Bore Apron | 50 | EA | $0.00 | |
| 0025 | 24" DIA HDPE Smooth Bore Apron | 50 | EA | $0.00 | |
| 0026 | Topsoil | 500 | CY | $0.00 | |
| 0027 | Seeding | 25000 | SY | $0.00 | |
| 0028 | Saw Cut Pavement | 938 | LF | $0.00 | |
| 0029 | Adjust Water Valve | 10 | EA | $0.00 | |
| 0030 | Adjust Manholes | 10 | EA | $0.00 | |
| 0031 | Adjust Hand Hole | 10 | EA | $0.00 | |
| 0032 | Adjust Catch Basin | 10 | EA | $0.00 | |
| 0033 | Install and Remove Silt Fence | 500 | LF | $0.00 | |
| 0034 | Install Erosion Control Blanket | 2500 | SY | $0.00 | |
| 0035 | Install Geotextile Fabric | 25000 | SY | $0.00 |
| TOTAL CLIN 0001 | $0.00 | ||||
| CLIN 0002 | |||||
| ITEM | DESIGNATION | QUANTITY | U/M | UNIT PRICE | AMOUNT |
| 0001 | Deliver Hot Mix Asphalt to Locations at Fort McCoy | 2500 | TON | $0.00 |
TOTAL CLIN 0002 $0.00
TOTAL CLINS 0001 and 0002 $0.00
| BASE YEAR TOTAL | $ - 0 |
| OPTION YEAR 1 TOTAL | $ - 0 |
| OPTION YEAR 2 TOTAL | $ - 0 |
| OFFERORS TOTAL PRICE | $ - 0 |
| OPTION TO INCREASE QTY BY 30% | $ - 0 |
| TOTAL EVALUATED PRICE | $ - 0 |
Option Year 1
| BID SCHEDULE--OPTION YEAR 1-FY 20-21 |
| ASPHALT PAVING IDIQ CONTRACT |
| FORT MCCOY, WISCONSIN |
| Furnish all labor,equipment, delivery, and material to construct, repair, and/or replace Asphalt pavements at Fort McCoy, Wisconsin, in accordance with specifications and drawings. |
| CLIN 1001 | |||||
| ITEM | DISIGNATION | QUANTITY | U/M | UNIT PRICE | AMOUNT |
| 1001 | Full Depth Patch | 2000 | SY | $0.00 | |
| 1002 | Pavement Removal < 4" | 10000 | SY | $0.00 | |
| 1003 | Pavement Removal > 4" | 4000 | CY | $0.00 | |
| 1004 | Pulverizing | 21875 | SY | $0.00 | |
| 1005 | Pavement Milling | 500 | SY | $0.00 | |
| 1006 | Subgrade/Subbase Preparation | 100000 | SY | $0.00 | |
| 1007 | Excavation | 5000 | CY | $0.00 | |
| 1008 | Subbase Material | 5000 | CY | $0.00 | |
| 1009 | Base Course Material | 5625 | CY | $0.00 | |
| 1010 | Prepare Existing Base | 100000 | SY | $0.00 | |
| 1011 | 2" Asphalt Lower Layer | 100000 | SY | $0.00 | |
| 1012 | 2" Asphalt Upper Layer | 100000 | SY | $0.00 | |
| 1013 | Shoulder Aggregate | 2800 | CY | $0.00 | |
| 1014 | Tack Coat | 100000 | SY | $0.00 | |
| 1015 | Pavement Marking--Roads | 15625 | LF | $0.00 | |
| 1016 | Parking Lot Marking | 438 | SP | $0.00 | |
| 1017 | Paint Symbols | 25 | EA | $0.00 | |
| 1018 | Striping Crosswalks | 1125 | LF | $0.00 | |
| 1019 | Layout of Pavement Marking, Mobilization | 13 | EA | $0.00 | |
| 1020 | 12" DIA HDPE Smooth Bore Culvert | 250 | LF | $0.00 | |
| 1021 | 18" DIA HDPE Smooth Bore Culvert | 250 | LF | $0.00 | |
| 1022 | 24" DIA HDPE Smooth Bore Culvert | 250 | LF | $0.00 | |
| 1023 | 12" DIA HDPE Smooth Bore Apron | 50 | EA | $0.00 | |
| 1024 | 18" DIA HDPE Smooth Bore Apron | 50 | EA | $0.00 | |
| 1025 | 24" DIA HDPE Smooth Bore Apron | 50 | EA | $0.00 | |
| 1026 | Topsoil | 500 | CY | $0.00 | |
| 1027 | Seeding | 25000 | SY | $0.00 | |
| 1028 | Saw Cut Pavement | 938 | LF | $0.00 | |
| 1029 | Adjust Water Valve | 10 | EA | $0.00 | |
| 1030 | Adjust Manholes | 10 | EA | $0.00 | |
| 1031 | Adjust Hand Hole | 10 | EA | $0.00 | |
| 1032 | Adjust Catch Basin | 10 | EA | $0.00 | |
| 1033 | Install and Remove Silt Fence | 500 | LF | $0.00 | |
| 1034 | Install Erosion Control Blanket | 2500 | SY | $0.00 | |
| 1035 | Install Geotextile Fabric | 25000 | SY | $0.00 |
| TOTAL CLIN 1001 | $0.00 | ||||
| CLIN 1002 | |||||
| ITEM | DESIGNATION | QUANTITY | U/M | UNIT PRICE | AMOUNT |
| 1002 | Deliver Hot Mix Asphalt to Locations at Fort McCoy | 2500 | TON | $0.00 |
TOTAL CLIN 1002 $0.00
TOTAL CLINS 1001 and 1002 $0.00
Option Year 2
| BID SCHEDULE--OPTION YEAR-2 FY21-22 |
| ASPHALT PAVING IDIQ CONTRACT |
| FORT MCCOY, WISCONSIN |
| Furnish all labor,equipment, delivery, and material to construct, repair, and/or replace Asphalt pavements at Fort McCoy, Wisconsin, in accordance with specifications and drawings. |
| CLIN 2001 | |||||
| ITEM | DISIGNATION | QUANTITY | U/M | UNIT PRICE | AMOUNT |
| 2001 | Full Depth Patch | 2000 | SY | $0.00 | |
| 2002 | Pavement Removal < 4" | 10000 | SY | $0.00 | |
| 2003 | Pavement Removal > 4" | 4000 | CY | $0.00 | |
| 2004 | Pulverizing | 21875 | SY | $0.00 | |
| 2005 | Pavement Milling | 500 | SY | $0.00 | |
| 2006 | Subgrade/Subbase Preparation | 100000 | SY | $0.00 | |
| 2007 | Excavation | 5000 | CY | $0.00 | |
| 2008 | Subbase Material | 5000 | CY | $0.00 | |
| 2009 | Base Course Material | 5625 | CY | $0.00 | |
| 2010 | Prepare Existing Base | 100000 | SY | $0.00 | |
| 2011 | 2" Asphalt Lower Layer | 100000 | SY | $0.00 | |
| 2012 | 2" Asphalt Upper Layer | 100000 | SY | $0.00 | |
| 2013 | Shoulder Aggregate | 2800 | CY | $0.00 | |
| 2014 | Tack Coat | 100000 | SY | $0.00 | |
| 2015 | Pavement Marking--Roads | 15625 | LF | $0.00 | |
| 2016 | Parking Lot Marking | 438 | SP | $0.00 | |
| 2017 | Paint Symbols | 25 | EA | $0.00 | |
| 2018 | Striping Crosswalks | 1125 | LF | $0.00 | |
| 2019 | Layout of Pavement Marking, Mobilization | 13 | EA | $0.00 | |
| 2020 | 12" DIA HDPE Smooth Bore Culvert | 250 | LF | $0.00 | |
| 2021 | 18" DIA HDPE Smooth Bore Culvert | 250 | LF | $0.00 | |
| 2022 | 24" DIA HDPE Smooth Bore Culvert | 250 | LF | $0.00 | |
| 2023 | 12" DIA HDPE Smooth Bore Apron | 50 | EA | $0.00 | |
| 2024 | 18" DIA HDPE Smooth Bore Apron | 50 | EA | $0.00 | |
| 2025 | 24" DIA HDPE Smooth Bore Apron | 50 | EA | $0.00 | |
| 2026 | Topsoil | 500 | CY | $0.00 | |
| 2027 | Seeding | 25000 | SY | $0.00 | |
| 2028 | Saw Cut Pavement | 938 | LF | $0.00 | |
| 2029 | Adjust Water Valve | 10 | EA | $0.00 | |
| 2030 | Adjust Manholes | 10 | EA | $0.00 | |
| 2031 | Adjust Hand Hole | 10 | EA | $0.00 | |
| 2032 | Adjust Catch Basin | 10 | EA | $0.00 | |
| 2033 | Install and Remove Silt Fence | 500 | LF | $0.00 | |
| 2034 | Install Erosion Control Blanket | 2500 | SY | $0.00 | |
| 2035 | Install Geotextile Fabric | 25000 | SY | $0.00 |
| TOTAL CLIN 2001 | $0.00 | ||||
| CLIN 2002 | |||||
| ITEM | DESIGNATION | QUANTITY | U/M | UNIT PRICE | AMOUNT |
| 2002 | Deliver Hot Mix Asphalt to Locations at Fort McCoy | 2500 | TON | $0.00 |
TOTAL CLIN 2002 $0.00
TOTAL CLINS 2001 and 2002 $0.00