Base Year
| BID SCHEDULE--BASE YEAR |
| CONCRETE PAVING REQUIRMENTS CONTRACT FY19-FY22 |
| FORT MCCOY, WISCONSIN |
| Furnish all labor,equipment, and material to construct, repair, and/or replace Portland cement concrete pavements, sidewalks, and curb and gutter, Fort McCoy, Wisconsin, in accrordance with specifications and drawings. |
| ITEM | DISIGNATION | QUANTITY | U/M | UNIT PRICE | AMOUNT |
| 0001 | Pavement Removal< 4" | 1000 | SY | $ - 0 | |
| 0002 | Pavement Removal> 4" | 1000 | CY | $ - 0 | |
| 0003 | Excavation | 1750 | CY | $ - 0 | |
| 0004 | Subgrade/Subbase Preparation | 4000 | SY | $ - 0 | |
| 0005 | In-Place Subbase Material (Fill) | 600 | CY | $ - 0 | |
| 0006 | In-Place Base Course Material (3/4") | 600 | CY | $ - 0 | |
| 0007 | In-Place Base Course Material (3" breaker) | 300 | CY | $ - 0 | |
| 0008 | Prepare Existing Base | 2400 | SY | $ - 0 | |
| 0009 | Install Shoulder Aggregate | 400 | CY | $ - 0 | |
| 0010 | Formwork for Concrete-4 inches | 3000 | LF | $ - 0 | |
| 0011 | Formwork for Concrete-6 inches | 3000 | LF | $ - 0 | |
| 0012 | Formwork for Concrete-8 inches | 2500 | LF | $ - 0 | |
| 0013 | Formwork for Concrete-10 inches | 2000 | LF | $ - 0 | |
| 0014 | Formwork for Concrete-12 inches | 2000 | LF | $ - 0 | |
| 0015 | Concrete Reinforcement-#4 Bars | 5 | TON | $ - 0 | |
| 0016 | Concrete Reinforcement Welded Wire Mesh 6x6 | 2000 | SY | $ - 0 | |
| 0017 | Concrete Pavement-4" | 450 | CY | $ - 0 | |
| 0018 | Concrete Pavement-6" | 450 | CY | $ - 0 | |
| 0019 | Concrete Pavement-8" | 450 | CY | $ - 0 | |
| 0020 | Concrete Pavement-10" | 500 | CY | $ - 0 | |
| 0021 | Concrete Pavement-12" | 550 | CY | $ - 0 | |
| 0022 | Expansion Joint Material | 3000 | LF | $ - 0 | |
| 0023 | Load/Stockpile Excess Base Gravel | 400 | CY | $ - 0 | |
| 0024 | Concrete Curbing-30 inch Machine Formed | 500 | LF | $ - 0 | |
| 0025 | Concrete Curbing-30 inch Hand Formed | 300 | LF | $ - 0 | |
| 0026 | Concrete Curbing-Mountable Machine Formed | 600 | LF | $ - 0 | |
| 0027 | Concrete Curbing-Mountable Hand Formed | 600 | LF | $ - 0 | |
| 0028 | Pavement Tie Joint | 900 | LF | $ - 0 | |
| 0029 | Doweled Contraction Joint | 800 | LF | $ - 0 | |
| 0030 | Longitudinal Tie Bar | 800 | LF | $ - 0 | |
| 0031 | Topsoil | 500 | CY | $ - 0 | |
| 0032 | Seeding | 8000 | SY | $ - 0 | |
| 0033 | Saw Cut Pavement | 1000 | LF | $ - 0 | |
| 0034 | 6" PVC Culvert Pipe | 200 | LF | $ - 0 | |
| 0035 | 12" PVC Culvert Pipe | 200 | LF | $ - 0 | |
| 0036 | 15" Corrugated Culvert | 200 | LF | $ - 0 | |
| 0037 | Adjust Water Valve | 20 | EA | $ - 0 | |
| 0038 | Adjust Curb Stop | 20 | EA | $ - 0 | |
| 0039 | Adjust Manholes | 20 | EA | $ - 0 | |
| 0040 | Remove trees >12" | 75 | EA | $ - 0 | |
| 0041 | Place Geotextile Fabric | 1000 | SY | $ - 0 | |
| 0042 | Installation of chain link fence | 500 | LF | $ - 0 | |
| 0043 | Removal of chain link fence | 500 | LF | $ - 0 | |
| 0044 | Installation of 12' gate | 6 | EA | $ - 0 | |
| 0045 | Install Erosion Control Blanket | 2000 | SY | $ - 0 | |
| 0046 | Install and Remove Silt Fence | 750 | LF | $ - 0 | |
| 0047 | Install Detectable Warning Plates | 100 | SF | $ - 0 | |
| 0048 | Install Joint Sealant | 3000 | LF | $ - 0 | |
| 0049 | Install Pipe Bollard | 40 | EA | $ - 0 | |
| 0050 | Install Concrete Mow Strip Under Chain Link Fence | 500 | LF | $ - 0 | |
| 0051 | Install Concrete Sealer | 60,000 | SF | $ - 0 | |
| Total | $ - 0 | ||||
| BASE YEAR TOTAL | $ - 0 | ||||
| OPTION YEAR 1 TOTAL | $ - 0 | ||||
| OPTION YEAR 2 TOTAL | $ - 0 | ||||
| OFFERORS TOTAL PRICE | $ - 0 | ||||
| OPTION TO INCREASE QTY BY 30% | $ - 0 | ||||
| TOTAL EVALUATED PRICE | $ - 0 |
Option Year 1
| BID SCHEDULE--OPTION YEAR ONE- |
| CONCRETE PAVING REQUIRMENTS CONTRACT FY19-FY22 |
| FORT MCCOY, WISCONSIN |
| Furnish all labor,equipment, and material to construct, repair, and/or replace Portland cement concrete pavements, sidewalks, and curb and gutter, Fort McCoy, Wisconsin, in accrordance with specifications and drawings. |
| ITEM | DISIGNATION | QUANTITY | U/M | UNIT PRICE | AMOUNT |
| 1001 | Pavement Removal< 4" | 1000 | SY | $ - 0 | |
| 1002 | Pavement Removal> 4" | 1000 | CY | $ - 0 | |
| 1003 | Excavation | 1750 | CY | $ - 0 | |
| 1004 | Subgrade/Subbase Preparation | 4000 | SY | $ - 0 | |
| 1005 | In-Place Subbase Material (Fill) | 600 | CY | $ - 0 | |
| 1006 | In-Place Base Course Material (3/4") | 600 | CY | $ - 0 | |
| 1007 | In-Place Base Course Material (3" breaker) | 300 | CY | $ - 0 | |
| 1008 | Prepare Existing Base | 2400 | SY | $ - 0 | |
| 1009 | Install Shoulder Aggregate | 400 | CY | $ - 0 | |
| 1010 | Formwork for Concrete-4 inches | 3000 | LF | $ - 0 | |
| 1011 | Formwork for Concrete-6 inches | 3000 | LF | $ - 0 | |
| 1012 | Formwork for Concrete-8 inches | 2500 | LF | $ - 0 | |
| 1013 | Formwork for Concrete-10 inches | 2000 | LF | $ - 0 | |
| 1014 | Formwork for Concrete-12 inches | 2000 | LF | $ - 0 | |
| 1015 | Concrete Reinforcement-#4 Bars | 5 | TON | $ - 0 | |
| 1016 | Concrete Reinforcement Welded Wire Mesh 6x6 | 2000 | SY | $ - 0 | |
| 1017 | Concrete Pavement-4" | 450 | CY | $ - 0 | |
| 1018 | Concrete Pavement-6" | 450 | CY | $ - 0 | |
| 1019 | Concrete Pavement-8" | 450 | CY | $ - 0 | |
| 1020 | Concrete Pavement-10" | 500 | CY | $ - 0 | |
| 1021 | Concrete Pavement-12" | 550 | CY | $ - 0 | |
| 1022 | Expansion Joint Material | 3000 | LF | $ - 0 | |
| 1023 | Load/Stockpile Excess Base Gravel | 400 | CY | $ - 0 | |
| 1024 | Concrete Curbing-30 inch Machine Formed | 500 | LF | $ - 0 | |
| 1025 | Concrete Curbing-30 inch Hand Formed | 300 | LF | $ - 0 | |
| 1026 | Concrete Curbing-Mountable Machine Formed | 600 | LF | $ - 0 | |
| 1027 | Concrete Curbing-Mountable Hand Formed | 600 | LF | $ - 0 | |
| 1028 | Pavement Tie Joint | 900 | LF | $ - 0 | |
| 1029 | Doweled Contraction Joint | 800 | LF | $ - 0 | |
| 1030 | Longitudinal Tie Bar | 800 | LF | $ - 0 | |
| 1031 | Topsoil | 500 | CY | $ - 0 | |
| 1032 | Seeding | 8000 | SY | $ - 0 | |
| 1033 | Saw Cut Pavement | 1000 | LF | $ - 0 | |
| 1034 | 6" PVC Culvert Pipe | 200 | LF | $ - 0 | |
| 1035 | 12" PVC Culvert Pipe | 200 | LF | $ - 0 | |
| 1036 | 15" Corrugated Culvert | 200 | LF | $ - 0 | |
| 1037 | Adjust Water Valve | 20 | EA | $ - 0 | |
| 1038 | Adjust Curb Stop | 20 | EA | $ - 0 | |
| 1039 | Adjust Manholes | 20 | EA | $ - 0 | |
| 1040 | Remove trees >12" | 75 | EA | $ - 0 | |
| 1041 | Place Geotextile Fabric | 1000 | SY | $ - 0 | |
| 1042 | Installation of chain link fence | 500 | LF | $ - 0 | |
| 1043 | Removal of chain link fence | 500 | LF | $ - 0 | |
| 1044 | Installation of 12' gate | 6 | EA | $ - 0 | |
| 1045 | Install Erosion Control Blanket | 2000 | SY | $ - 0 | |
| 1046 | Install and Remove Silt Fence | 750 | LF | $ - 0 | |
| 1047 | Install Detectable Warning Plates | 100 | SF | $ - 0 | |
| 1048 | Install Joint Sealant | 3000 | LF | $ - 0 | |
| 1049 | Install Pipe Bollard | 40 | EA | $ - 0 | |
| 1050 | Install Concrete Mow Strip Under Chain Link Fence | 500 | LF | $ - 0 | |
| 1051 | Install Concrete Sealer | 60,000 | SF | $ - 0 | |
| Total | $ - 0 |
Option Year 2
| BID SCHEDULE--OPTION YEAR TWO |
| CONCRETE PAVING REQUIRMENTS CONTRACT FY19-FY22 |
| FORT MCCOY, WISCONSIN |
| Furnish all labor,equipment, and material to construct, repair, and/or replace Portland cement concrete pavements, sidewalks, and curb and gutter, Fort McCoy, Wisconsin, in accrordance with specifications and drawings. |
| ITEM | DISIGNATION | QUANTITY | U/M | UNIT PRICE | AMOUNT |
| 2001 | Pavement Removal< 4" | 1000 | SY | $ - 0 | |
| 2002 | Pavement Removal> 4" | 1000 | CY | $ - 0 | |
| 2003 | Excavation | 1750 | CY | $ - 0 | |
| 2004 | Subgrade/Subbase Preparation | 4000 | SY | $ - 0 | |
| 2005 | In-Place Subbase Material (Fill) | 600 | CY | $ - 0 | |
| 2006 | In-Place Base Course Material (3/4") | 600 | CY | $ - 0 | |
| 2007 | In-Place Base Course Material (3" breaker) | 300 | CY | $ - 0 | |
| 2008 | Prepare Existing Base | 2400 | SY | $ - 0 | |
| 2009 | Install Shoulder Aggregate | 400 | CY | $ - 0 | |
| 2010 | Formwork for Concrete-4 inches | 3000 | LF | $ - 0 | |
| 2011 | Formwork for Concrete-6 inches | 3000 | LF | $ - 0 | |
| 2012 | Formwork for Concrete-8 inches | 2500 | LF | $ - 0 | |
| 2013 | Formwork for Concrete-10 inches | 2000 | LF | $ - 0 | |
| 2014 | Formwork for Concrete-12 inches | 2000 | LF | $ - 0 | |
| 2015 | Concrete Reinforcement-#4 Bars | 5 | TON | $ - 0 | |
| 2016 | Concrete Reinforcement Welded Wire Mesh 6x6 | 2000 | SY | $ - 0 | |
| 2017 | Concrete Pavement-4" | 450 | CY | $ - 0 | |
| 2018 | Concrete Pavement-6" | 450 | CY | $ - 0 | |
| 2019 | Concrete Pavement-8" | 450 | CY | $ - 0 | |
| 2020 | Concrete Pavement-10" | 500 | CY | $ - 0 | |
| 2021 | Concrete Pavement-12" | 550 | CY | $ - 0 | |
| 2022 | Expansion Joint Material | 3000 | LF | $ - 0 | |
| 2023 | Load/Stockpile Excess Base Gravel | 400 | CY | $ - 0 | |
| 2024 | Concrete Curbing-30 inch Machine Formed | 500 | LF | $ - 0 | |
| 2025 | Concrete Curbing-30 inch Hand Formed | 300 | LF | $ - 0 | |
| 2026 | Concrete Curbing-Mountable Machine Formed | 600 | LF | $ - 0 | |
| 2027 | Concrete Curbing-Mountable Hand Formed | 600 | LF | $ - 0 | |
| 2028 | Pavement Tie Joint | 900 | LF | $ - 0 | |
| 2029 | Doweled Contraction Joint | 800 | LF | $ - 0 | |
| 2030 | Longitudinal Tie Bar | 800 | LF | $ - 0 | |
| 2031 | Topsoil | 500 | CY | $ - 0 | |
| 2032 | Seeding | 8000 | SY | $ - 0 | |
| 2033 | Saw Cut Pavement | 1000 | LF | $ - 0 | |
| 2034 | 6" PVC Culvert Pipe | 200 | LF | $ - 0 | |
| 2035 | 12" PVC Culvert Pipe | 200 | LF | $ - 0 | |
| 2036 | 15" Corrugated Culvert | 200 | LF | $ - 0 | |
| 2037 | Adjust Water Valve | 20 | EA | $ - 0 | |
| 2038 | Adjust Curb Stop | 20 | EA | $ - 0 | |
| 2039 | Adjust Manholes | 20 | EA | $ - 0 | |
| 2040 | Remove trees >12" | 75 | EA | $ - 0 | |
| 2041 | Place Geotextile Fabric | 1000 | SY | $ - 0 | |
| 2042 | Installation of chain link fence | 500 | LF | $ - 0 | |
| 2043 | Removal of chain link fence | 500 | LF | $ - 0 | |
| 2044 | Installation of 12' gate | 6 | EA | $ - 0 | |
| 2045 | Install Erosion Control Blanket | 2000 | SY | $ - 0 | |
| 2046 | Install and Remove Silt Fence | 750 | LF | $ - 0 | |
| 2047 | Install Detectable Warning Plates | 100 | SF | $ - 0 | |
| 2048 | Install Joint Sealant | 3000 | LF | $ - 0 | |
| 2049 | Install Pipe Bollard | 40 | EA | $ - 0 | |
| 2050 | Install Concrete Mow Strip Under Chain Link Fence | 500 | LF | $ - 0 | |
| 2051 | Install Concrete Sealer | 60,000 | SF | $ - 0 | |
| Total | $ - 0 |