SCOPE OF WORK
CA187 REPAIR INTERIOR BLDG 546
SGT JAMES WITOWSKI AFRC
230 RT Jones Rd. Mountain View, CA 94043
1. GENERAL PRE-AWARD:
1.1 The intent of this project is to provide the Government with a complete and usable product at the completion.
1.2 The Contractor shall furnish and install all plant, labor, materials; tools, equipment, and supervision necessary to provide a complete and usable project per the Scope of Work (SOW), Plans, Specifications and manufacturers recommendations. All work shall be free from defects.
1.3 The Plans and Specifications are to prescribe the details for the construction and completion of the SOW, which the Contractor undertakes to perform in accordance with the terms of the contract.
1.4 The Contractor shall visit the work site to verify the site condition. If the Contractor discovers any errors or omissions in the SOW, Plans or Specifications, the Contractor shall immediately call it to the attention of the Contracting Officer (KO) and the Contracting Officer’s Representative (COR).
1.5 Where the Specifications and Plans describe portions of the work in general terms, but not in complete detail, it is understood that all work and materials will be of the highest standard using generally accepted industry practices.
1.6 The Contractor shall not interrupt the service function or disturb the support of any utilities without prior coordination with the COR/Area Facility Operations Specialist (AFOS). If any utilities are disturbed or damaged, the Contractor shall bear costs of repair or replacement.
1.7 The Contractor shall be responsible for and repair any damage to the grounds and structures caused by the Contractor or his/her sub-contractors during the performance of this project.
1.8 Any said work in the Plans and Specifications and not in the written SOW or in the SOW and not in the Plans or Specifications shall be as though shown or mentioned in both.
1.9 The Contractor shall verify all dimensions, site conditions, and any other items required to install a complete and ready to use product, prior to submitting a bid proposal for construction.
1.10 The Contractor shall provide a project manager and alternate that is able to read, write, speak, and understand English.
1.11 The Contractor shall perform all the services of this contract during the normal operating hours of 7:30 A.M. to 4:30 P.M. (0730 to 1630) Monday-Friday. Facilities will be closed on all Federal Holidays.
1.11.1 Federal Holidays are as follows;
New Year’s Day – January 1 Martin Luther King Jr. Birthday – third Monday of January
Washington’s Birthday – third Monday of February Memorial Day – final Monday of May Independence Day – July 4 Labor Day – first Monday of September Columbus Day – second Monday of October Veterans Day – November 12 Thanksgiving Day – fourth Thursday of November Christmas Day – December 25
1.11.2 Actual day observed for the following holidays is subject to change when the holiday date falls on a weekend; New Year’s Day, Independence Day, Veterans Day and Christmas Day.
1.12 The Contractor shall provide signs, barriers, and barricades to provide a safe working area. Requirements of Occupational Safety and Health Act, latest edition and U.S. Army Corps of Engineers "Safety and Health Requirements Manual", latest edition, shall be strictly enforced and adhered to at all times at the job site.
1.13 The Contractor shall comply with Army Regulation (AR) 600-63, Army Health Promotion, for controlling smoking in Government buildings and facilities. In general NO SMOKING is allowed within building or within 50’ of any exit or door. Facility personnel can direct personnel to authorized smoking areas.
1.14 The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. This can include storm water permits, US Army Corps of Engineers permits, state water resources permits, US Fish and Wildlife permits, etc.
1.15 Antiterrorism (AT) Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days of contract award or prior to submission of final invoice and within 45 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.
1.16 iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award or prior to submission of final invoice and within 30 calendar days of new employees commencing performance with the results reported to the COR no later than 45 calendar days after contract award.
1.17 Access and general protection/security policy and procedures. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
http://jko.jten.mil/
1.17.1 Contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a Department of Defense (DoD) facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
1.17.2 For contractors that are not eligible for CAC, but require access to a DoD facility or installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.18 The contractor employees must be adequately trained in the handling and disposal of hazardous waste, in particular, lead paint and asbestos. Hazardous materials must be handled and disposed of appropriately by the contractor. Disposal is at contractor’s expense. The contractor must comply with all local, state, and federal environmental laws, regulations, and policies prior to final approval of work completed. National Environmental Policy Act (NEPA) documents must be completed prior to award of the contract or notice to proceed.
2. GENERAL POST AWARD:
2.1 Where any conflict occurs between the requirements of federal, state, and local laws, codes, ordinances, rules and regulations, the most stringent shall govern.
2.2 The Contractor shall, at all times, keep the premises free from accumulation of waste material and rubbish caused by his work, or his subcontractors. At the completion of work, the Contractor shall thoroughly clean the work site. All debris, rubbish, and waste material shall be removed from the property at the Contractor’s expense and disposed of in an official disposal site.
2.3 The Contractor shall make no changes or deviate from the approved design of this project without written permission from the KO. In the case where a change is required, the Contractor will notify the COR of the requirement and shall not proceed with the change until such time as a modification to the contract is issued by the KO.
2.4 Prior to ordering any materials, the Contractor shall submit to the COR for approval submittals on all new items being installed on this project. Submittal may be shop drawings, diagrams, catalog cut-sheets, samples, and any other related material.
2.5 The Contractor shall submit a written construction schedule of work for this project to the KO and COR prior to the start of the project.
2.6 The Contractor shall be responsible for the conditions of the job site, including safety of all persons, and property during performance of the work. Safety shall conform to all applicable Federal, State, local laws, codes and regulations established by the Mountain View, Santa Clara County, CA.
2.7 All work shall be in compliance with the current applicable federal, state and city codes.
2.8 All work shall be completed within 120 days upon receipt of Notice To Proceed (NTP).
3. SUBMITTALS:
3.0 Prior to ordering any materials, the Contractor shall submit to the COR for approval submittals for all new items being installed. Submittals may be cut sheets, samples, spec sheet, so long as it is clear and easily readable. Submittals must be e-mailed, faxed or sent directly to the office of the COR using Engineer Form 4025-R, dated March 2012, as the coversheet.
3.1 All materials used for this project will be subject to UFC 1-200-02 Section 2-6.1 for recycled content, biologically-based products, other green products, and ozone depleting substances, and Section 2-5.3.3 for low-emitting materials. Projects will also comply with applicable requirements for the purchase of water efficient (e.g., Water Sense), Energy Star or FEMP-designated (or an "A" or better European Union Energy Label, EU energy efficiency class), and Electronic Product Environmental Assessment Tool (EPEAT) designated products.
In addition, project materials will comply with the requirements in ASHRAE 189.1-2014 Section 9.4.1.2 (Regional Materials). Submittal requirements packages will clearly outline the applicable sustainable materials being used. The owner reserves the right to reject any product that does not meet the requirements of the specification list in the SOW.
3.2 The contractor shall maintain proper construction waste management. Waste management must maximize the materials to be salvaged, recycled, or reused. All materials removed shall become the property of the contractor, and be disposed of daily. The contractor shall provide reports of all materials salvaged, recycled or reused.
3.3 Contractor shall provide a material sample board for all finishes being used in project. Board shall be given to the COR for approval.
4. SITE WORK: The intent of this requirement is to upgrade the finishes for the 1st floor of building 546. The work will consist of new flooring, paint, cabinetry, free standing counters and counter tops. Work will be conducted while tenants are in the building. Work will need to be phased. A phasing plan will need to be worked out between the tenants and contractor.
DEMO
4.0 Demo approximately 10,699 sf. of sheet carpet. All adhesive shall be removed prior to carpet installation.
See DWGS 4.1 for locations.
4.1 Demo approximately 4750 sf. of VCT tile. See DWGS 4.1 for locations.
4.1.1 Demo all cove base on 1st floor approximately 4300 lf.
4.1.2 Demo cabinets in rooms 111, 152, 177 to including hangers, base cabinets, counter tops, grounds, cleats etc.
4.1.2.1 Demo counter tops in rooms 117, 141, 175, 177a and 177c.
4.1.2.2 Demo main control counter in area 105 and medical counter in area 141. All power shall be disconnected and made safe.
4.1.3 Demo all blinds approximately 19.
4.1.4 Remove existing hinged windows in room 151.
INSTALLATION: Contractor shall be responsible for moving furniture and reinstall after installation. Tenants will clear areas of small items, electronics and empty cabinets to allow items to be moved for demo and installation.
PAINT: See Paint Calculation Worksheet for paint location
4.2 In preparation for paint contractor shall fill small, nail sized holes, remove outlet covers and switch plates, tape off light fixtures, move light furniture (under 50 pounds) away from wall/to center of room, cover floor and furniture with drop cloths, caulk gaps between trim and wall/ceiling, lightly clean and sand walls, trim or ceiling, repair of minor imperfections (ex: smoothing out small bumps, smoothing out uneven texture under existing coats of paint, scraping up to 5 square feet of chipping paint)
4.2.1.2 All interior walls to include drywall soffits shall be painted with single color Sherwin Williams Pro Mar Low VOC paint or equivalent, COR shall pick the color. Apply one primer coat and two finish coats of semi-gloss. Take care to prevent overspray onto adjacent surfaces. Any overspray or over-painting onto adjacent surfaces shall be removed without damaging adjacent surfaces at no additional expense to the Government.
for location.
4.2.1.3 All surfaces that currently have wall paper shall be painted over. Contractor shall use a high build primer over the wall paper in preparation for paint. Primer will be used to help level surface and hide the appearance of the textured wallpaper. Areas 136, 161, 131, 140, 145, on floor plan have wall paper. Wall paper covers the top half of the wall and is separated from bottom of the wall with chair rail.
DOORS
4.3 Contractor shall restore (57) fifty seven wood doors. This will include smoothing any chips, gouges or scratches in the doors. Either stain or paint door whichever finish is on the door during time of repair. If doors are taken off hinges to conduct repair, upon reinstallation all doors will be hung for proper swing. Any hardware that was removed shall be reinstalled and adjusted for proper operation.
4.3.1 Contractor shall prep door frames for paint by doing any repair of minor imperfections (ex: smoothing out small bumps, smoothing out uneven texture under existing coats of paint and scraping of chipped paint. Paint both sides (57) door frames.
4.4 Contractor shall restore wood chair rails located in rooms 131, 139 and corridor 161 to like new condition.
FLOORING
4.5 Install approximately 4800 sf. of new VCT tile in areas shown on DWGS 4.5 Flooring. VCT will be installed with no visible cracks or gaps. VCT will be straight and true with meeting corners. Provide extra material from same dye lot consisting of uncut tiles for future attic stock. This shall be a minimum of 10 percent of total square yards of each pattern, and color.
4.5.1.1 Verify that the moisture content of the concrete slab, building air temperature and relative humidity are within the limits recommended by the manufacturer of the materials being used.
4.5.1.2 Place material in accordance with the manufacturer’s instructions
4.5.1.3 New flooring shall be scribed in to the concrete were block walls are present so that they are tight to the block. Following installation, edge against block walls will be caulked using a vinyl caulk that matches the tile in color. Install new thresholds at doorways that received new flooring. Thresholds will be replaced with like kind.
4.5.1.4 All new flooring will be protected until the final cleaning and wax application can be accomplished.
Protection may be paper or plastic that is taped in place. All tile will be cleaned and have one coat of wax applied prior to the government’s acceptance of the contract.
4.5.2. Carpet: Install app. 16,300sf of carpet. Carpet shall be 28 ounce, solution dyed nylon, rubber like backing 25” tiles. There will be approximately 4300 lf. of cove base. Cove base shall be 6” base mold throughout building with factory corners. Approximately 4700 sf. of new carpet will be laid over existing VCT tile. Rooms 135, 139, 140, 141, 142, 145, and 161 lay carpet over existing flooring. Use proper manufacturers recommendation for installation of carpet over VCT. See DWGS 4.5 for carpet location.
4.5.2.1 Room 120 identified on 4.1 DWGS as Ceremony Room; Carpet shall be cut pile min. 26oz weight.
Color to either generically be American Flag Red or American Flag Blue and shall be opposite color of the drapes.
4.5.2.1 Provide extra material from same dye lot consisting of uncut carpet tiles and cove base for future attic stock. This shall be a minimum of 10 percent of total square yards of each carpet type, pattern, and color.
4.5.2.2 Thresholds shall be a Pemko #2005AT or equal extruded aluminum finish.
4.5.2.3 Do not install carpet on surfaces that are unsuitable and will prevent a proper installation. Repair holes, cracks, depressions, or rough areas using material recommended by the carpet or adhesive manufacturer. Free floor of any foreign materials and sweep clean. Before beginning work, test subfloor with glue and carpet to determine “open time” and bond.
4.5.3 Transition strips shall be used in areas where flooring changes from carpet to tile.
4.5.4 In areas that carpet will be placed over VCT tile, place carpet as per recommended by manufacturer.
CABINETS AND COUNTER TOPS
4.6 Contractor shall field verify locations, sizes and quantities of cabinets required for the project. The contractor shall provide and install all new laminate lower cabinets, upper cabinets, cabinet, countertops, sinks, fixtures, electrical outlets and any fillers or scribes necessary for complete installation of cabinets in rooms 111, 152 and 177. This shall include final connections of any mechanical, plumbing and electrical. Counter Tops shall be of Caesarstone type material.
4.6.1 The Contractor shall provide new cabinets that meet the same material and dimensions of the existing cabinets. Contractor shall obtain the dimensions prior to the removal of the existing cabinets.
4.6.2 In rooms 111, 177a and 144 new solid surface counter tops shall be installed.
4.6.2.1 Room 152 shall receive a stainless steel counter top.
4.6.3 Contractor shall install luggage cabinet cubicles in room 176. Contractor shall verify all dimensions prior to demolition and install like for like.
4.6.4 There are two large counters in the building in areas 105 and 141. Replace these two counters with one for one replacements. They shall be in the same foot print as the existing counters.
4.6.4 COR shall pick the color and material for all new cabinets, counters and counter tops.
URINALYSIS PASS THRU WINDOWS
URINALYSIS WINDOWS
4.7 Contractor shall install new casement windows that separate rooms 153 and 150 from room 151.
4.7.1 Windows will be one for one replacement. Both windows measure approximately 40”w x 32”h with latches on both sides of the window. See reference pictures for existing windows.
BLINDS
4.8 Contractor shall install approximately 19 blinds. Blinds shall be the same type as originals. Contractor shall field verify all sizes and material of blinds prior to demo.
5. WARRANTY:
5.1 All work specified in this contract shall have a warranty of a minimum period of one full calendar year for parts and labor from the customer’s acceptance date. At the final acceptance walk-through, the Contractor shall provide to the COR a signed warranty letter.
6. QUALITY CONTROL AND INSPECTIONS:
6.1 All work shall be inspected by the contractor’s quality control person and final inspection shall be performed by the COR prior to final payment.
6.2 Contractor shall maintain a clean, clear, and safe working environment at all times.
6.3 Only qualified personnel familiar with the proper construction techniques shall be used.
6.4 All site coordination shall be accomplished through the 63rd RSC AFOS Diane Nichols.
7. POINTS OF CONTACT:
AFOS: Diane Nichols 650-759-5631 diane.d.nicholes.ctr@mail.mil
COR: Sandra Perez 650-526-9428 sandra.perez5.civ@mail.mil
REFERENCE PICTURES
Thomas E Wiley Senior Engineering Technician thomas.e.wiley Line
LOCATION:_____CA187 Bldg 546 MEPS__________
PAINTING CALCULATIONS WORK SHEET
WORK ORDER NR ______________ DATE: _07_____/__12____/___17___
ROOM # LENGTH WIDTH
CEILING
HEIGHT
CEILING
PAINT
Y/N
LENGTH
SQUARE
FOOTAGE
WIDTH SQ
FOOTAGE
TOTAL
WALLS SQ
FOOTAGE
CEILING SQ
FOOTAGE
TOTAL SQ
WITHOUT
CEILING PAINT
TOTAL ROOM
SQ FOOTAGE
WITH CEILING
PAINT
DESCRIPTION
100 71 23.5 8 n 1136 376 1512 1668.5 1512 3180.5 This includes 100, 105 and 101
102 33.5 23 8 n 536 368 904 770.5 904 1674.5 Cooridor
107 37 5.5 8 n 592 88 680 203.5 680 883.5 Cooridor
111 11 8 8 n 176 64 240 88 240 328 Staff Kitchen/Lounge
112 14 6 8 n 224 48 272 84 272 356 Vestibule
115 36 19 8 n 576 152 728 684 728 1412 Storage B
116 56 23.5 8 n 448 188 636 1316 636 1952 Too include A-G
117 13.5 9.5 8 n 108 76 184 128.25 184 312.25 File Room
118 9.5 9 8 n 76 72 148 85.5 148 233.5 MIRS Sys. Admin
118A 10.5 9 8 n 84 72 156 94.5 156 250.5
MIRS COM. CLOS.
119 23 20 8 n 184 160 344 460 344 804 Briefing Room
121 23 15 8 n 184 120 304 345 304 649 Copy
123 12 10.5 8 n 96 84 180 126 180 306 O.S Officer
124 12 10.5 8 n 96 84 180 126 180 306 Travel Clerk/Ticketing
125 10 11 8 n 80 88 168 110 168 278 Budget Analyst
126 9.5 10.5 8 n 76 84 160 99.75 160 259.75 Budget Analyst Ass.
127 13 10 8 n 104 80 184 130 184 314 Commander
128 18 11 8 n 288 176 464 198 464 662 Secretary to Include 128B
129 11 11 8 n 176 176 352 121 352 473 1st Sgt.
4.2
WORK ORDER NR ______________ DATE: _07_____/__12____/___17___
ROOM # LENGTH WIDTH
CEILING
HEIGHT
CEILING
PAINT
Y/N
LENGTH
SQUARE
FOOTAGE
WIDTH SQ
FOOTAGE
TOTAL
WALLS SQ
FOOTAGE
CEILING SQ
FOOTAGE
TOTAL SQ
WITHOUT
CEILING PAINT
TOTAL ROOM
SQ FOOTAGE
WITH CEILING
PAINT
DESCRIPTION
131 17 11 8 n 272 88 360 187 360 547 Conferene Room
132 39 20 8 n 624 160 784 780 784 1564 To include A-F
133 9.5 10 8 n 76 80 156 95 156 251 CTMS Officer
134 9.5 10 8 n 76 80 156 95 156 251
ESS
135 19 7.5 8 n 152 60 212 142.5 212 354.5 Secure Storage
136 18.5 9 8 n 148 72 220 166.5 220 386.5 Small Test
138 22 19.5 8 n 176 156 332 429 332 761 Large Test
139 37.5 16 8 n 300 128 428 600 428 1028 Waiting
140 27.5 16.5 8 n 220 132 352 453.75 352 805.75 Waiting
141 18.5 11.5 8 n 148 92 240 212.75 240 452.75 Control Counter
142 10 8.5 8 n 80 68 148 85 148 233 Medical Admin/Storage
143 28 19.5 8 n 224 156 380 546 380 926 Briefing Room
144 18 13 8 n 144 104 248 234 248 482 Vision
145 22 14 8 n 352 224 576 308 576 884 Waiting
146 28 23 8 n 448 368 816 644 816 1460 Ortho Male
147 15 11 8 n 240 88 328 165 328 493 Doctor Exam Office
148 15 5 8 n 240 40 280 75 280 355 Corridor
151 13.5 11 8 n 216 88 304 148.5 304 452.5 Serology
152 16.5 11 8 n 264 88 352 181.5 352 533.5 Laboratory
WORK ORDER NR ______________ DATE: _07_____/__12____/___17___
ROOM # LENGTH WIDTH
CEILING
HEIGHT
CEILING
PAINT
Y/N
LENGTH
SQUARE
FOOTAGE
WIDTH SQ
FOOTAGE
TOTAL
WALLS SQ
FOOTAGE
CEILING SQ
FOOTAGE
TOTAL SQ
WITHOUT
CEILING PAINT
TOTAL ROOM
SQ FOOTAGE
WITH CEILING
PAINT
DESCRIPTION
154 17.5 18 8 n 140 144 284 315 284 599 Female Ortho
155 9 10 8 n 72 80 152 90 152 242 Female Exam
156 12 13 8 n 96 104 200 156 200 356 CMO/Exam
157 12 9.5 8 n 96 76 172 114 172 286 Exam/EKG
158 11.5 9.5 8 n 92 76 168 109.25 168 277.25 Exam
159 13 10 8 n 104 80 184 130 184 314 Audio
160 11 9 8 n 88 72 160 99 160 259
NCO
161 43 15 8 n 344 120 464 645 464 1109 Liason Waiting
162 76 20 8 n 608 160 768 1520 768 2288 National Guard
163 13 16.5 8 n 104 132 236 214.5 236 450.5 Coast Guard
164 13.6 16.5 8 n 108.8 132 240.8 224.4 240.8 465.2 Marines
165 39 24 8 n 624 384 1008 936 1008 1944 Navy
166 14 5 8 n 224 80 304 70 304 374 Cooridor
168 11 11 8 n 176 88 264 121 264 385 Navy Senior Counselor
169 11 8 8 n 176 64 240 88 240 328 Nuke Testing Room
170 28 34 8 n 448 272 720 952 720 1672 Army
171 11 10.5 8 n 88 84 172 115.5 172 287.5 Army Senior Counselor
172 11 8 8 n 88 64 152 88 152 240 Secuirty Interview Room
173 16 18 8 n 128 144 272 288 272 560 Air Force
WORK ORDER NR ______________ DATE: _07_____/__12____/___17___
ROOM # LENGTH WIDTH
CEILING
HEIGHT
CEILING
PAINT
Y/N
LENGTH
SQUARE
FOOTAGE
WIDTH SQ
FOOTAGE
TOTAL
WALLS SQ
FOOTAGE
CEILING SQ
FOOTAGE
TOTAL SQ
WITHOUT
CEILING PAINT
TOTAL ROOM
SQ FOOTAGE
WITH CEILING
PAINT
DESCRIPTION
174 11.5 9.5 8 n 92 76 168 109.25 168 277.25 Air Force Senior Counselor
175 22 20 8 n 176 160 336 440 336 776 Game Room
176 12 11 8 n 96 88 184 132 184 316 Baggage
177 28 33 8 n 224 264 488 924 488 1412 Too include A and C
21804.8 21804.8 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0
WORK ORDER NR ______________ DATE: _07_____/__12____/___17___
ROOM # LENGTH WIDTH
CEILING
HEIGHT
CEILING
PAINT
Y/N
LENGTH
SQUARE
FOOTAGE
WIDTH SQ
FOOTAGE
TOTAL
WALLS SQ
FOOTAGE
CEILING SQ
FOOTAGE
TOTAL SQ
WITHOUT
CEILING PAINT
TOTAL ROOM
SQ FOOTAGE
WITH CEILING
PAINT
DESCRIPTION
y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0 y 0 0 0 0 0 0
DWGS 4.1 Flooring Demo
Indicated carpet to be removed
Indicates VCT Tile to be removed deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle
DWGS 4.5 Flooring Installation
Indicates carpet to be installed
Indicates VCT Tile to be installed
4.5 deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Rectangle
DWGS 4.7 CABINETS AND COUNTERS
4.7 deborah.dunks Callout
REPLACE ADMIN STATION
deborah.dunks Callout
REPLACE MED ADMIN STATION
deborah.dunks Callout DISCONNECT ELECTRICAL AND PLUMBING. REMOVE OLD CABINETS, INSTALL NEW CABINETRY, REUSE SINK AND FAUCET, CONNECT PLUMBING AND ELECTRICAL.
deborah.dunks Callout DISCONNECT ELECTRICAL AND PLUMBING. REMOVE OLD CABINETS, INSTALL NEW CABINETRY, REUSE SINK AND FAUCET, CONNECT PLUMBING AND ELECTRICAL.IINSTALL 16 GAUGE STAINLESS STEAL COUNTER.
deborah.dunks Callout DISCONNECT ELECTRICAL AND PLUMBING. REMOVE OLD CABINETS, INSTALL NEW CABINETRY AND ISLAND. REUSE SINK AND FAUCET, CONNECT PLUMBING AND ELECTRICAL.
deborah.dunks Oval deborah.dunks Oval
Text Box
Drawings aresting counter and baggage units.
measurements will still need to field verified.
deborah.dunks Rectangle deborah.dunks Rectangle deborah.dunks Text Box deborah.dunks
Drawings are for reference only. These are the existing counter and baggage units. measurements will still need to field verified.
deborah.dunks
Drawings are for reference only. These are the existing counter and baggage units. measurements will still need to field verified.
REFERENCE PICTURES
Room 111 Cabinet Room 177C Cabinet and Counter
Reception Desk
Baggage Cubbies Rm 176 Medical Admin. Counter
Room 152 Room 144
Urinalysis Windows to be replaced.
Wall Paper and Chair Rail
Typical Wood Door
| CA187_REPAIR INTERIOR BLDG 546 _SOWa |
| CA187_REPAIR INTERIOR BLDG 546_SOWb |
| DWGS 4.1 |