W911SA18B20180002_Solicitation_Amendment_0002.docx
DOCX document 28 KB Posted
- Attached to
- Construct Emergency Operations Center (EOC) at Fort McCoy, WI Federal contract opportunity
- Solicitation number
- W911SA18B2018
About this file
Solicitation Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SA18B2018_Abstract_of_Offers.pdf | ||
| W911SA18B20180003_Solicitation_Amendment.docx | DOCX document | |
| W911SA18B2018_Attachment_5_Wage_Determination_WI180011_06-22-2018.pdf | ||
| W911SA18B2018_Attachment_3_Drawings_6-25-18.pdf | ||
| W911SA18B20180001_Solicitation_Amendment_0001.docx | DOCX document | |
| W911SA18B2018_Site_Visit_Sign_In_Sheet.pdf | ||
| W911SA18B2017_Attachment_6_SF24.pdf | ||
| W911SA18B2018_Attachment_1_AT_OPSEC.pdf | ||
| W911SA18B2018_Attachment_5_Wage_Determination_WI180011_05-18-2018.pdf | ||
| W911SA18B2018_Solicitation.docx | DOCX document | |
| W911SA18B2018_Attachment_4_Geotechnical_Report.pdf | ||
| W911SA18B2018_Attachment_2_Specifications.pdf | ||
| W911SA18B2018_Attachment_3_Drawings.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SA18B2018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
CONTRACTOR Q&A
Q1. Will razor wire be required on any temporary or altered fencing? (none shown on plan set, just barbed wire shown)
A1. Temporary fence can either be 8’ in height or 6’ with 3 strands of barbed wire.
Q2. What are the security requirements/measures that will be required for maintaining the secure fencing perimeter? (only afterhours, during, etc.)
A2. Keep the construction gate closed as much as possible.
Q3. Can a work trailer & restrooms be placed in the parking lot?
A3. Yes, it can also be placed inside the security fence.
Q4. On Page S101, it shows the existing security window next to the ramp in the existing building being removed (shown with dotted lines). If the existing security window is removed are we to save? Or install at vestibule 101 new location?
A4. The existing security window is not to be removed. A new security window, as per specifications, is required.
(End of Summary of Changes) image1.wmf