W911SA-17-Q-3001_Performance_Work_Statement_(DRAFT).docx

DOCX document 55 KB Posted

Attached to
Refuse Services for Fort Hunter Liggett, CA Federal contract opportunity
Solicitation number
W911SA-17-Q-3001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort McCoy

About this file

DRAFT Performance Work Statement (Refuse, FHL)

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

REFUSE PERFORMANCE WORK STATEMENT (PWS)

REFUSE/ RECYCLING SERVICES

PART 1

GENERAL INFORMATION

1. General: This is a non-personnel services contract to provide refuse and recycling services as defined in this Performance Work Statement (PWS) at Ft. Hunter Liggett located in Jolon, California 939328. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, labor, equipment, supplies, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform refuse and recycling services as defined in the Performance Work Statement (PWS), as well as reports that are required by the local, Federal and State, except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.

1.2 Background: Fort Hunter Liggett is located in in southern Monterey County, California. Fort Hunter Liggett consists of approximately 165,000 acres.

1.3 Objectives: The objective of this contract is for the contractor to perform refuse and recycling services in a manner that will maintain dumpsters/containers and surrounding area in a condition that presents a clean, neat, and professional appearance as defined in the PWS.

1.4 Scope: The Contractor shall be responsible for performing refuse and recycling services. The contractor shall perform to the standards and specifications outlined in the PWS.

0. Period of Performance: The period of performance shall be for one (1) Base Period and four (4) 12-month option periods as defined in the contract.

1.6 General Information:

1.6.1 Quality Control: Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.212-4, Contractor Inspection Requirements). A formal Quality Control Plan (QCP) is not required for this commercial service. However, the contractor shall maintain an inspection system commensurate with commercial practices to ensure the Contractor only tenders for acceptance those items or services that conform to the requirements of this contract.

1.6.2 Quality Assurance: Quality Assurance: The Government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a Government only document primarily focused on what the Government must do to assure that the contractor has performed in accordance with the requirements of the contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. Non-conforming services shall be re-performed at no increase in contract price. If non-conforming services are recurring, cannot be re-performed, or the services fail to achieve the performance standards in the PWS and referenced in Section 7, the Government may reject the nonconforming service(s) and document the contractor’s performance record accordingly. The Government may also issue a Contract Discrepancy Report (CDR) in which the contractor will be required to respond with the development of a Corrective Action Plan (CAP) which identifies the root cause, corrective action for the root cause, corrective action for the specific nonconformance, and the date the corrective action(s) will be complete. The Government may also reduce the payment to the contractor in accordance with (IAW) the Performance Requirements Summary (PRS), or reduce payment to reflect the value of the services performed, or may perform the services and charge the Contractor for any related cost incurred, or may terminate this contract for default.

1.6.2.1 Nonconforming Supplies or Services: When a Contractor’s performance does not meet Contract requirements and/or approved work schedules and/or timeframes it is considered a nonconformance. Nonconformance shall be classified in one of three categories: level I (Minor), level II (Major) or level III (Critical). The Government may re-inspect work designated for re-performance or late performance, and the Contractor may be held liable for any damages sustained by the Government including, for example, the costs associated with re-inspection.

1.6.2.1.1 Level I (Minor) non-conformance: is defined as a non-conformance that is not likely to materially reduce the usability of the supplies or services for their intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the supplies or services. Minor non-conformance usually can be corrected on the spot, where no further corrective action (CA) response is necessary, and can be issued by the COR to the contractor either through a verbal or written non-conformance report. Minor non-conforming services shall be re-performed within a specified time frame at no increase in contract price. If minor non-conformances are recurring or re-performance is not completed in full and within the specified time a Level II non-conformance may be issued to the contractor by the Contracting Officer (KO).

1.6.2.1.2 Level II (Major) non-conformance: is defined as a non-conformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose. Recurring Minor non-conformances, or a non-responsive contractor, indicating a trend or failure of the contractor’s quality control, can also be classified as a Major non-conformance. Major non-conformance’s shall result in the issuance of a written CDR from the KO to the contractor requiring the development of a CAP by the contractor which identifies the root cause, CA for the root cause, CA for the specific non-conformance and the date CAs will be completed.

1.6.2.1.3 Level III (Critical) non-conformance: is defined as a non-conformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; is likely to prevent performance of a vital agency mission; is for a repeated or uncorrected level II CDRs; or is for a non-responsive contractor to a level II CDR. Critical non-conformances shall result in the issuance of a written CDR to the contractor requiring the development of a CAP by the contractor which identifies the root cause, CA for the root cause, CA for the specific non-conformance and the date CAs will be completed.

1.6.2.1.4 The contractor will be notified of Government inspection results within 5 business days. The contractor shall acknowledge receipt of the inspection results via email or letter within 2 business days. The contractor may be notified of inspection results verbally. Verbal notifications of defective work will be confirmed in writing. When Government inspectors are unable to contact the contractor to notify the contractor of inspection results, acceptance or rejection of work will be made on the basis of the initial inspection.

1.6.2.1.5 Performance Evaluation Meetings; the Contractor Point of Contact (POC) shall meet with the COR prior to start of the contract. However, meetings may be held whenever deficiencies are noted by the COR. A mutual effort will be made to resolve all problems identified.

1.6.3 Federal Government Holidays: Except as noted in the Schedule of Work, work shall not be performed on the following holidays or on holidays observed in lieu thereof.

New Year’s Day1st day of January
Martin Luther King Jr.'s Birthday3rd Monday of January
Presidents Day3rd Monday of February
Memorial DayLast Monday of May
Independence Day4th day of July
Labor Day1st Monday of September
Columbus Day2nd Monday of October
Veterans Day11th day of November
Thanksgiving Day4th Thursday of November
Christmas Day25th day of December

1.6.4 Unforeseen Installation Closures: meaning when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Contractor will be notified by the COR of an installation closure. The contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Government shall have the following options:

1.6.4.1 To require the Contractor to perform the work on the following day unless the following day is a Saturday or Sunday and routine work is not scheduled for Saturday or Sunday.

1.6.4.2 To reschedule the work on any day satisfactory to both parties.

1.6.5 Hours of Operation: Hours of Operation. All collections shall be made between the hours of 7:30 A.M. and at schedules may be varied to provide pickups as required. At least ten (10) days prior to any Federal Holiday on which pickup is scheduled, the contractor shall notify the COR that collections will be made that day, or shall arrange for varying the collection schedule.

1.6.5.1 Contractor shall during peak training, which is usually between May thru August (Subject to Change) will be required to perform all disposal operations of the 10 & 30 cubic-yards containers during the hours of 7:30 A.M. and 4:00 P.M. on an on-call basis, up to two (2) times per day

1.6.6 Key Control: The Contractor if applicable shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.7.1 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon notification of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.7.2 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.7.3 The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.7 Conservation of Utilities: The Contractor shall be directly responsible for instructing employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions, which preclude the waste of utilities, which shall include but shall not necessarily be limited to:

1.6.8 Damages Caused by the Contractor: The Contractor shall be held accountable and liable to the Government for any damages to Government facilities, furnishings, equipment or grounds caused by the Contractor or his employees. The Contractor shall instruct his employees to immediately inform the building manager of any damages to property resulting from the performance of their duties.

1.6.9 Parking for Contractor’s Employees & Contractor Vehicles: Contractor employees shall park their personal and Contractor’s vehicles during the times and in the area designated by the COR or Designated Representative.

1.6.10 Circumstances to Be Reported: The Contractor or the Contractor’s employees shall report any circumstances of needed repair of the facility or unusual soiling of an area which may affect the performance of the work, present unhealthy or hazardous conditions, or create any delays or interference with the work caused by the employees of the Government. Such report shall be made immediately upon discovery by the Contractor to the COR or Designated Representative.

1.6.11 Loss of Contractor Property: If applicable, the Contractor shall be responsible to retain supplies and equipment within each building, in a safe and secure manner. Storage rooms shall be kept clean. The Government will not be held liable for any loss of supplies or equipment owned by the Contractor; nor the loss of any personal property belonging to employees of the Contractor.

1.6.12 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.13 Contracting Officer Representative (COR): The COR will be identified by a separate letter and in the Supplemental Information of the contract. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.14 Key Personnel: The following personnel are considered key personnel by the Government: designated Point of Contact (POC) and an alternate POC. The Contractor shall provide a designated POC who shall be responsible for the competent performance of the work required under the specifications of this contract NLT 5 business days after contract award and as changes occur. The name and contact information of the POC and an alternate, who shall act for the contractor when the POC is absent, shall be designated in writing to the KO and COR. The POC or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The POC or alternate shall be available between 7:30 a.m. to 4:00 p.m. Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. The POC(s) and alternates shall be able to read, write, speak, and understand English.

1.6.14.1 The POC shall meet with COR to discuss immediate problems areas. The POC shall respond by phone or email to the COR within two (2) hours after notification of deficiencies and correct the deficiency(s) the next business day. The Contractor shall provide the telephone number and email of the POC to the COR.

1.6.15 Identification of Contractor Employees: The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a recent color photo of the employee, prior to them entering Government facilities. ID Badges for Key Personnel shall also indicate their job title. ID Badges shall be worn at all times during which the employee is performing work under this contract. Each Contractor (to include subcontractors) employee shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued identification cards shall be furnished to the COR prior to the listed employees entering Government facilities and updated as needed to reflect Contractor and Subcontractor personnel changes. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.16 Supervision of Contractor Employees: The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or Subcontractor employees.

1.6.17 Security Requirements: Contractor personnel shall comply with all applicable security and safety regulations, guidance, and procedures, including local, referenced in this PWS and in effect at the work sites. All personnel must meet requirements IAW DODD 8570.

1.6.17.1 Physical Security: The contractor shall have a law enforcement background check completed for all employees who will be entering Army-controlled installations or facilities.

1.6.17.2 Contractor will provide to the COR, fifteen days in advance of the event, names and Social Security numbers (or equivalent identification numbers for non-U.S. citizens) of all employees who will be entering Army-controlled installations or facilities. Non-U.S. citizens must produce a valid work visa along with said documentation. The contractor will ensure that this requirement is met for all subsequent employees who will be entering the installation after the initial start date. The contractor will also ensure that a law enforcement background check is completed for all employees on a yearly basis thereafter.

1.6.17.3 The contractor will return all issued U.S. Government Common Access Cards, installation badges, and/or access passes to the Army installation Physical Security Officer when the contract is completed or when a contractor employee no longer requires access to the installation or facility.

1.6.17.4 Personnel Security: Contractor personnel required to access an Army Network to perform their duties, shall successfully complete, as a minimum, a Tier 1 background investigation processed through the Office of Personnel Management (OPM). These investigations shall be submitted by the installation Personnel Security Manager at no cost to the contractor. Prior to the contractor reporting to the installation to commence work, the contractor's company will submit the required documentation, obtained from the installation Personnel Security Manager. It is the contractor's responsibility to ensure that the information for all employees on contract accessing FHL is provided to the installation Personnel Security Manager (i.e., the required information to initiate the T1) within thirty days of reporting to work on the installation. Upon initiation of the T1, the contractor will have a window of seven days to complete the background investigation package for applicable employees. The contractor will not adequately be performing the scope of work if its employees do not fill out the aforementioned questionnaire within seven days of reporting to work on the resultant Task Order (with performance at FHL). Failure to provide the necessary documentation for the local Police vetting or the T1 background investigation are grounds for contract termination. The Common Access Card (CAC) and/or access to an Army Network will only be authorized after the T1 background investigation has been opened by OPM and a clear FBI finger print check has been received by the Personnel Security Manager.

1.6.17.5.OPSEC: For Contracts that Require an OPSEC Standing Operating Procedure/Plan. The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security.

This SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure this individual becomes OPSEC Level II certified per AR 530-1. For Contracts that Require OPSEC Training. Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training. OPSEC training is available through the Fort Hunter Liggett Security Office, 831-386-2119/3814.

1.6.18 Key Control: The Contractor if applicable shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.18.1 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon notification of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.18.2 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.18.3 The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.19 Special Qualifications:

1.6.19.1 The Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current certifications as indicated in PWS, security requirements during the execution of this contract.

1.6.19.2 Contractor personnel performing work under this contract shall be able to read, write, speak, and understand the English language to effectively carry out all contract requirements. They shall have a command of both the written and spoken English language to properly clearly, and effectively communicate in person or via electronic devices (telephone or Email) with co-workers, customers, and the general public.

1.6.19.3 Contractor personnel performing work under this contract shall be U.S. citizens unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed, and approval has been granted by the Government for the non-U.S. citizen to perform the required support.

1.6.19.4 Access and General Protection / Security Policy and Procedures: All Contractor personnel performing work under this contract shall comply with applicable installation, facility and area commander installation/facility access, local security policies and security procedures provided by the Security Manager Government representative. Contractor personnel shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor personnel must comply with all personal identity verification requirements as directed by DoD, HQDA or local policies. In addition to the changes otherwise authorized by this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor and subcontractor security matters or processes.

1.6.19.5 Anti-Terrorism Program

1.6.19.5.1 The Contractor shall allow the Government to conduct periodic inspections to ensure adherence to access control procedures in accordance with DoD Anti-Terrorism Program. 5152.209-4000 DOD LEVEL I ANTITORRISM (AT) STANDARDS (FEB 2009).

1.6.19.5.2 AT Level I Training. This agreement text is for recipient employees with an area of performance within an Army controlled installation, facility or area. All recipient employees, to include sub-recipient employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within prior to the start date or effective date of incorporation of this requirement into the agreement task order. The recipient shall submit certificates of completion for each affected recipient employee and sub-recipient employee, to the COR is not assigned, within 7 calendar days after completion of training by all employees and sub-recipient personnel. AT level I awareness training is available at the following website: https://jkodirect.jten.mil. The recipient shall submit the certificates of completion for each recipient, employee(s), sub-recipient(s), and sub-recipient's employee(s) to the COR will provide a copy of the completed certificate to the AT Officer. Any and all personnel hired after the agreement has been awarded, and work has started, shall complete the vetting process prior to start of work. Including completion of the AT Level 1 certificate, and all required documentation checked and verified through Physical Security and Personnel Security Manger. Personnel need vetting prior to any work on the installation.

1.6.19.5.3 iWATCH Training. This standard language is for recipient employees with an area of performance within an Army controlled installation, facility or area. The recipient and all associated sub-recipients shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to FHL Law Enforcement Agency 831-386-2526 or ISALUTE, located on the Fort Hunter Liggett website. This training shall be completed within 7 calendar days of Award and within 7 calendar days of new employees commencing performance with the results reported to the COR NLT 7 calendar days after award.

1.6.19.5.4. Contract personnel requiring access to Fort Hunter Liggett to perform their duties, shall successfully complete, as a minimum, a National Agency Check with Inquiries (NACI), background investigation processed through the Installation Physical Security Manager. These investigations shall be submitted by the installation Personnel Security Manager, (831-386-2119) at no cost to the contractor. Prior to the contractor reporting to the installation to commence work, the contractor’s company will submit the required documentation, obtained from the installation Personnel Security Manager. The contractor employee must provide the installation Personnel Security Manager with the required information to initiate the NACI within seven days of reporting to work on the installation. Upon initiation of the NACI, the contractor employee will have a window of seven days to complete the background investigation package. Failure to provide the necessary documentation for the NACI background investigation is grounds for contract termination.

1.6.19.5.5 During Force Protection Conditions (FPCON) Charlie and Delta, services are discontinued and services shall resume when the FPCON level is reduced to level Bravo or lower

1.6.20 Lost and Found Property: It is the responsibility of the Contractor to ensure that all items of possible personal or monetary value found by the Contractor’s employees are turned in to the Contracting Officer Representative (COR) or Designated Representative.

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms:

2.1 Definitions: As used throughout this performance work statement, the following terms shall have the meaning set forth below:

2.1.1 Bulk Refuse: All lumber, pipe or debris exceeding three (3) feet in length, or two (2) feet by two (2) feet square, or two (2) feet in diameter, concrete blocks, and other similar material or equipment of a weighty or bulky nature such as sofas and other similar items.

2.1.2 Business Day: Shall mean any day banking transactions can be conducted in New York City, NY, USA and does not include any day which is a federal or state holiday in such location.

2.1.3 Collection: Solid Waste collection is an organized an systematic method of transporting solid waste from the point of generation or from pick up points to site of disposal or a materials recovery facility.

2.1.4 Commingled: Any combination of recyclable materials which, when combined in one container, do not contaminate or effect the quality of the materials. In this case, we are referring to plastics #1 and #2, glass food/beverage containers and metal food/beverage containers.

2.1.5 Containers/Dumpsters: Suitable containers/dumpsters are receptacles of a size as listed on the attached schedule for the USAR Center and so constructed as to enable pick up and emptying.

2.1.6 Contract Administrator. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.

2.1.7 Contractor. A supplier or vendor awarded a contract to provide specific supplies or services to the government. The term used in this contract refers to the prime.

2.1.8 Contracting Officer (KO). A person with the authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note: The KO is the only individual who can legally bind the Government.

2.1.9 Contracting Officer's Representative (COR). An employee of the U.S. Government appointed by the KO to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. Note: This individual does NOT have authority to change the terms and conditions of the contract.

2.1.10 Debris. Is a category of solid waste. Debris, often referred to as “Construction and Demolition” or “bulky waste”, means roofing materials, plastic siding, stone, masonry, brick, concrete, tile, Formica, plasterboard (drywall), non-recyclable glass, etc. Not included in this category are grass clippings, leaves, yard waste, stumps, and wood waste, scrap metal and similar waste materials.

2.1.11 Defective Service. A service output that does not meet the standard of performance associated with the PWS.

2.1.12 Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.13 Designated Representative. A Government employee or Contractor employee performing duties in the position of Area Facility Operations Specialist (aFOS), Facility Coordinator (FC) or Acting Facility Coordinator or otherwise approved by the COR to assist the COR with duties such as coordinating schedules with contractors to perform work at a facility, provide facility access to contractors, and perform inspection of contractors work and provide results of their inspections back to the COR, both orally and in writing. A Designated Representative does not have the authority to assign work to contractors or discuss contractor performance issues; but may discuss these issues with the COR for potential further action. The only individuals with the authority to discuss contractor performance issues are warranted Contracting Officers and Contracting Officer Representatives specifically delegated this authority by a warranted KO via an appointment letter.

2.1.14 Disposal. Disposal is the process of spreading and covering in sanitary fills, spreading and covering in landfills, and dumping in public dumps, or other solid waste disposal facility.

2.1.15 Garbage: Garbage is a category of solid waste. Garbage means animal and vegetable waste (and containers thereof, but not including recycling containers) resulting from the handling, preparation, cooking and consumption of foods. Edible or hog food garbage is the portion of waste food which has been segregated for salvage or for composting.

2.1.9 Government-Furnished Property (GFP), Government-Furnished Equipment (GFE), or Government-Furnished Facility (GFF). Property or area in the possession of, or directly acquired by, the Government and subsequently made available to the Contractor.

2.1.17 Hazardous and Special Waste. Any material that poses a hazard to health and/or environment as defined in the Resource Conservation and Recovery Act (RCRA) of 1976, applicable state and county regulations/ordinances. Such wastes include but are not limited to those material that are toxic, corrosive, ignitable or reactive, requiring special handling and procedures for disposal. This waste shall not be collected as part of this contract.

2.1.18 His/Her. Wherever used in the Performance Work Statement, the term “his” is meant to be synonymous with “her” unless otherwise stated. The same shall be true for him and her.

2.1.19 Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.20 Materials Recovery Facility (MRF). A Materials Recovery Facility is a center where recovered solid waste materials are delivered for processing and marketing. MRF’s usually have State permit to operate.

2.1.21 Physical Security. Actions that prevent the loss or damage of Government property.

2.1.22 Quality Assurance. The government procedures to verify that services being performed by the Contractor are acceptable in accordance with established standards and requirements of this contract.

2.1.23 Quality Assurance Specialist. An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the Contracting Officer in these areas.

2.1.24 Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.25 Quality Control. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.26 Recyclable: Any material that can be recovered before final disposal, processed, and marketed or used to make a new product.

2.1.27 Recyclable Materials: All materials that are normally collected and sorted for reprocessing into new or different commodities. Present normal collection and sorting are aluminum and steel cans, glass, plastic, paper and cardboard. These items may change and other items are added to the recyclable materials list as markets are developed and expanded.

2.1.28 Refuse: Refuse is a category of solid waste. Refuse includes all garbage, ashes, debris, rubbish and other similar waste materials. Not included are explosive or incendiary wastes; recyclable materials; hazardous waste; and contaminated waste from medical or radiological processes.

2.1.29 Rubbish: Rubbish is a category of solid waste. Rubbish means a variety of unsalvageable materials such as floor sweepings, paper wrappings, non-recyclable containers, cartons, and similar articles not used in preparing or dispensing food. It is easier to define rubbish as any material that is not a recyclable, not debris, not ash, not yard waste and not garbage.

2.1.30 Sanitary Landfill: As a minimum, four basic conditions should be met by any site design and operation before it can be regarded as a sanitary landfill: Full or partial hydro geological isolation: if a site cannot be located on land which naturally contains leakage security, additional lining materials should be brought to the site to reduce leakage from the base of the site (leakage) and help reduce contamination of groundwater and surrounding soil. If a liner - soil or synthetic - is provided without a system of leakage collection, all leakage will eventually reach the surrounding environment. Leakage collection and treatment must be stressed as a basic requirement.

Formal engineering preparations: designs should be developed from local geological and hydro geological investigations. A waste disposal plan and a final restoration plan should also be developed.

Permanent control: trained staff should be based at the landfill to supervise site preparation and construction, the depositing of waste and the regular operation and maintenance.

Planned waste emplacement and covering: waste should be spread in layers and compacted. A small working area which is covered daily helps make the waste less accessible to pests and vermin.

2.1.31 Solid Waste: Solid waste means all those materials that are not liquid waste, but includes recyclables, refuse, rubbish, garbage, ash debris, yard waste and under certain conditions, hazardous waste.

2.1.32 Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.33 Transfer Station: A solid waste handling facility used for the consolidation of waste in preparation for transporting to a point of further processing and ultimate disposal.

2.1.34 Transfer Vehicle: Any vehicle used for the transportation of solid waste from the point of waste origin to a point of further processing or ultimate disposal.

2.1.35 Work Day. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.36 Work Week. Monday through Friday, except for Federal holidays unless specified otherwise.

2.1.37 Yard Waste: Yard Waste is a category of solid waste. Yard waste means leaves, grass clippings, brush, and small stumps.

2.2. Acronyms:

ACORAlternate Contracting Officer's Representative
AFARSArmy Federal Acquisition Regulation Supplement
AQLAcceptable Quality Level
aFOSArea Facility Operations Specialist
ARArmy Regulation
ATAnti-Terrorism
CACorrective Action
CAPCorrective Action Plan
CFRCode of Federal Regulations
CMRContract Manpower Reporting
CONUSContinental United States (excludes Alaska and Hawaii)
CORContracting Officer Representative
CORTContracting Officer Representative Tracking
COTRContracting Officer's Technical Representative
COTSCommercial-Off-the-Shelf
CYCubic Yard
DADepartment of the Army
DD254Department of Defense Contract Security Requirement List
DFARSDefense Federal Acquisition Regulation Supplement
DMDCDefense Manpower Data Center
DODDepartment of Defense
EOWEvery Other Week
FARFederal Acquisition Regulation
FOSFacility Operations Specialist
FPCONForce Protection Condition
FSCFederal Service Code
GFEGovernment Furnished Equipment
GFFGovernment Furnished Facilities
GFPGovernment Furnished Property
HIPAAHealth Insurance Portability and Accountability Act of 1996
IAWIn accordance with
iRAPTInvoicing Receipt Acceptance Property Transfer (formerly WAWF)
JKOJoint Knowledge Online
KOContracting Officer
MEPMilitary Equipment Parking
MRFMaterials Recovery Facility
MSDSMaterial Safety Data Sheet
NLTNo later than
OCIOrganizational Conflict of Interest
OCONUSOutside Continental United States (includes Alaska and Hawaii)
ODCOther Direct Costs
OSHAOccupational Safety and Health Act/Agency
PIPOPhase In/Phase Out
POCPoint of Contact
PRSPerformance Requirements Summary
PWSPerformance Work Statement
QAQuality Assurance
QAPQuality Assurance Program
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Program
RCRAResource Conservation and Recovery Act
RIPReduction in Payment
TETechnical Exhibit
UICUnit Identification Code
USARUnited States Army Reserve
USARCUnited States Army Reserve Center
USARCUnited States Army Reserve Command
WAWFWide Area Work Flow (see iRAPT)

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND FACILITIES

3. Government Furnished Items: There will be no Government Furnished Property (GFP), Government Furnished Equipment (GFE), or Government Furnished Facilities (GFF) provided under this contract.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Items: The Contractor shall furnish all labor, materials, supplies, tools, equipment, transportation, labor, supervision, and services needed to perform this contract and meet the requirements of this PWS.

4.1 Materials: The Contractor shall furnish all materials necessary to perform the tasks specified in Part 5.

4.2 Equipment & Tools: The Contractor shall furnish all equipment and tools necessary to properly perform the work defined in this contract.

4.2.1 The Contractor shall comply with the provisions set forth in the most recent revision of 40 CFR Part 202, for the routine maintenance of transfer vehicles, compactors, and all equipment required to assure satisfactory performance of solid waste removal and transfer to the ultimate disposal site.

4.2.2 The contractor shall comply with all federal, state, and local regulations regarding waste removal and disposal. Should the final disposal site be located in another state, the Contractor shall also be responsible for following the statutes that govern the transportation and disposal of solid waste within that state.

4.3 Vehicles

4.3.1 The Contractor shall comply with the provisions set forth in 49 CFR Part 390-397, for motor carrier safety standards.

4.3.2 The Contractor shall ensure that each vehicle has the Contractor’s name, a unique vehicle identification number, and local telephone number of the Contractor clearly marked on each side.

4.3.3 The Contractor shall operate their vehicles in accordance with all Federal, State, and Installation traffic regulations and provide for registration, licensing, and insurance in compliance with all applicable laws, regulations, and subject to the terms and conditions of this contract.

4.3.4 The Contractor shall supply all fuel, lubricants, spare parts, and provide repair and maintenance necessary to keep equipment in proper operating condition.

PART 5

SPECIFIC TASKS

5. Specific Tasks:

5.1 Scope: The Contractor shall be responsible for performing refuse and recycling services. It is anticipated that during the course of this contract there will be workload increases and decreases. Payment will only be made by the Government for services received and accepted at the prices specified in the contract. The Contractor shall perform to the standards and specifications outlined in the PWS.

5.2 Refuse & Recycling Services

5.2.1 The Contractor shall collect all refuse and recycling from Contractor supplied dumpsters/containers. The Contractor shall coordinate pick up schedules with the COR or Designated Representative to meet the scheduled requirements set forth in the contract. The Contractor shall submit these schedules to the COR or Designated Representative for approval within five (5) business days after contract award. Collections shall be made according to established schedules; any changes to the schedules must be approved by the COR prior to the change.

5.2.2 The Contractor shall respond on site, and be prepared to troubleshoot, and repair Contractor supplied equipment within twenty-four (24) hours of any request made by the Government in reference to inoperable dumpsters/containers.

5.2.2.1 The Contractor shall steam clean all dumpsters, (2, 3, 6, 8, 10 & 30 cubic yards) every 90 days, inside and out.

5.2.2.2. The Contractor shall remove and replace all dumpsters that are rusted or have drain plugs that are inoperable.

5.2.2.3 The Contractor shall maintain appearance of containers, and remove and replace containers deemed to be unsightly by the government.

5.2.2.4 Contractor shall remove and replace, or repair, all dumpsters with damaged lids to prevent entry of vermin or rainwater.

5.2.3 The Government reserves the right to request dumpster/container relocation within the service area of the contract. Relocation of the dumpsters/container(s) shall occur within the next pick up cycle after notification from the COR.

5.2.3.1 The Contractor shall when more than one container is positioned at one collection station, containers shall be placed as close together as feasible for user convenience and organized appearance.

5.2.3.2 The Contractor shall after dumping of containers, the contractor shall return containers to their proper station in an upright position with the lids closed securely in place.

5.2.3.3 The Government reserves the right to change placement of the containers within the area of the contract without any additional cost to the Government. Relocation of the container(s) should be within two (2) days after notification from the COR.

5.2.4 In the case of inclement weather the Contractor shall reschedule pickup with the COR within 24 hours after inclement weather has ended.

5.2.5 The Contractor shall not dispose of any material that has obvious value and appears to have been inadvertently placed near the collection point unless such material is designated as refuse or recycling.

5.3 The Contractor shall attach into Invoicing Receipt Acceptance Property Transfer (iRAPT) (formerly Wide Area Work Flow (WAWF)) the Ft. Hunter Liggett Solid Waste Disposal Report on a monthly basis along with the invoice.

5.4 Performance Evaluation Meetings. The Contractor ‘s Project manager shall be required to meet with the Contracting Officer’s Representative (COR) on a monthly basis for the first three months of the contract, and as necessary thereafter, to discuss contract deliverables and contract issues. The time and location will be mutually agreed upon between the two parties.

5.4.1 Support Services. The Contractor shall provide acceptable support services which meet professional standards and requirements in the performance of each task of this PWS.

5.4.2 Reports. The Contractor shall provide all reports to the COR as required in accordance with each task performed and required by the local, Federal and State.

5.4.2.1 Weight. The Contractor shall provide accurate weights of refuse and recycled commodities as follows:

1. Comingled recycled commodities from 2, 3, 6, and 8 cubic yard containers shall be reported separately from 30 cubic yard recycling containers.

2. Comingled recycled commodities in thirty (30) cubic yard containers shall be reported by location (where feasible).

3.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .