W911SA-17-Q-0008_Attachment_2_PRS_22_Dec_2016.pdf

PDF 98 KB Posted

Attached to
Maintain Water Treatment Facility Granite City, IL
Solicitation number
W911SA-17-Q-0008
Issued by

About this file

W911SA-17-Q-0008 Attachment 2 PRS

View the file

Other files

File Type Posted
W911SA-17-Q-0008_Amendment_2.docx DOCX document
W911SA-17-Q-0008-0002_Conformed_Solicitation.docx DOCX document
W911SA-17-Q-0008-0001_Amendment_1.docx DOCX document
W911SA-17-Q-0008_Attachment_3_AT_OPSEC.pdf PDF
W911SA-17-Q-0008_Solicitation.docx DOCX document
W911SA-17-Q-0008_Attachment_1_Deliverables.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Treatment Maintenance Performance Requirements Summary (PRS)

PERFORMANCE

OBJECTIVE

STANDARD PERFORMANCE

THRESHOLD

METHOD OF

SURVEILLANCE

INCENTIVE

1) PWS Part 1

General

Information.

Contractor shall comply with the

PWS

requirements relating to general management and administrative operations.

All PWS requirements shall be completed as stated within

Part 1.

Contractor shall maintain an 85% or better total overall PRS

Inspection

Checklist compliance rate per facility.

Periodic

Surveillance: The

COR will utilize a

PRS Inspection

Checklist with pass/fail criteria which may include any or all of the

PWS

requirement(s) stated within Part 1 in assessment of the total overall contractor performance compliance rate.

Government will require rework for any services found not performed to the stated PWS standard. Reoccurring performance issues can lead to contract termination.

If rework cannot be completed, or is not completed to standard, an equitable price reduction and/or adequate consideration will be assessed by the

Contracting Officer for acceptance of nonconforming services when the contractor compliance rate is below the stated percentage of the performance threshold.

Results will be recorded and may be reported in CPARS.

2) PWS Part 5

Specific Tasks.

Contractor shall comply with

PWS

requirements relating to specific tasks operations.

All PWS requirements shall be completed as stated within

Part 5.

Contractor shall maintain an 85% or better total overall PRS

Inspection

Checklist compliance rate per facility.

Periodic

Surveillance: The

COR will utilize a

PRS Inspection

Checklist with pass/fail criteria which may include any or all of the

PWS

requirement(s) stated within Part 5 in assessment of the total overall contractor performance compliance rate.

Government will require rework for any services found not performed to the stated PWS standard. Reoccurring an equitable price reduction and/or adequate consideration will be assessed by the

Contracting Officer for acceptance of nonconforming services when the contractor compliance rate is below the

Performance Requirements Summary (PRS)

3) PWS Part 7

Technical

Exhibits and

Attachments.

Contractor shall comply with

PWS provisions relating to technical exhibits and attachments operations.

All Technical

Exhibits and

Attachments shall be completed as stated within the document.

Contractor shall maintain an 85% or better total overall PRS

Inspection

Checklist compliance rate per facility.

Periodic

Surveillance: The

COR will utilize a

PRS Inspection

Checklist with pass/fail criteria which may include any or all of the

Technical Exhibit and Attachment requirement(s) stated within Part 7 in assessment of the total overall contractor performance compliance rate.

Government will require rework for any services found not performed to the stated PWS standard. Reoccurring an equitable price reduction and/or adequate consideration will be assessed by the

Contracting Officer for acceptance of nonconforming services when the contractor compliance rate is below the

File details come from the government source that posted it. Updated .