W911SA-17-Q-0008_Attachment_2_PRS_22_Dec_2016.pdf
PDF 98 KB Posted
- Solicitation number
- W911SA-17-Q-0008
About this file
W911SA-17-Q-0008 Attachment 2 PRS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911SA-17-Q-0008_Amendment_2.docx | DOCX document | |
| W911SA-17-Q-0008-0002_Conformed_Solicitation.docx | DOCX document | |
| W911SA-17-Q-0008-0001_Amendment_1.docx | DOCX document | |
| W911SA-17-Q-0008_Attachment_3_AT_OPSEC.pdf | ||
| W911SA-17-Q-0008_Solicitation.docx | DOCX document | |
| W911SA-17-Q-0008_Attachment_1_Deliverables.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Water Treatment Maintenance Performance Requirements Summary (PRS)
PERFORMANCE
OBJECTIVE
STANDARD PERFORMANCE
THRESHOLD
METHOD OF
SURVEILLANCE
INCENTIVE
1) PWS Part 1
General
Information.
Contractor shall comply with the
PWS
requirements relating to general management and administrative operations.
All PWS requirements shall be completed as stated within
Part 1.
Contractor shall maintain an 85% or better total overall PRS
Inspection
Checklist compliance rate per facility.
Periodic
Surveillance: The
COR will utilize a
PRS Inspection
Checklist with pass/fail criteria which may include any or all of the
PWS
requirement(s) stated within Part 1 in assessment of the total overall contractor performance compliance rate.
Government will require rework for any services found not performed to the stated PWS standard. Reoccurring performance issues can lead to contract termination.
If rework cannot be completed, or is not completed to standard, an equitable price reduction and/or adequate consideration will be assessed by the
Contracting Officer for acceptance of nonconforming services when the contractor compliance rate is below the stated percentage of the performance threshold.
Results will be recorded and may be reported in CPARS.
2) PWS Part 5
Specific Tasks.
Contractor shall comply with
PWS
requirements relating to specific tasks operations.
All PWS requirements shall be completed as stated within
Part 5.
Contractor shall maintain an 85% or better total overall PRS
Inspection
Checklist compliance rate per facility.
Periodic
Surveillance: The
COR will utilize a
PRS Inspection
Checklist with pass/fail criteria which may include any or all of the
PWS
requirement(s) stated within Part 5 in assessment of the total overall contractor performance compliance rate.
Government will require rework for any services found not performed to the stated PWS standard. Reoccurring an equitable price reduction and/or adequate consideration will be assessed by the
Contracting Officer for acceptance of nonconforming services when the contractor compliance rate is below the
Performance Requirements Summary (PRS)
3) PWS Part 7
Technical
Exhibits and
Attachments.
Contractor shall comply with
PWS provisions relating to technical exhibits and attachments operations.
All Technical
Exhibits and
Attachments shall be completed as stated within the document.
Contractor shall maintain an 85% or better total overall PRS
Inspection
Checklist compliance rate per facility.
Periodic
Surveillance: The
COR will utilize a
PRS Inspection
Checklist with pass/fail criteria which may include any or all of the
Technical Exhibit and Attachment requirement(s) stated within Part 7 in assessment of the total overall contractor performance compliance rate.
Government will require rework for any services found not performed to the stated PWS standard. Reoccurring an equitable price reduction and/or adequate consideration will be assessed by the
Contracting Officer for acceptance of nonconforming services when the contractor compliance rate is below the