W911SA-17-B-0008_Amendment_2.docx
DOCX document 46 KB Posted
- Attached to
- Repair Military Equipment Parking Lot & Install new LED Lighting in Fort Smith, AR 72916
- Solicitation number
- W911SA-17-B-0008
About this file
Amendment 2
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SA-17-B-0008
W911SA-17-B-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 31-May-2017 02:30 PM to 08-Jun-2017 02:30 PM.
The Issued By organization has changed from
MICC FORT MCCOY
BLDG 1108 SOUTH R ST
FORT MCCOY WI 54656-5153
to
MICC - FT MCCOY
BLDG 1108 SOUTH R ST
FORT MCCOY WI 54656-5153
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
| 60 dys. ADC |
| 1 |
| W41DVS: FT CHAFFEY MAINT FACILITY |
W41DVS: FT CHAFFEY MAINT FACILITY
11500 CUSTER BLVD
FORT SMITH AR 72916
FOB: Destination
W90XCV
To:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
| 90 dys. ADC |
| 1 |
| W41DVS: FT CHAFFEY MAINT FACILITY |
W41DVS: FT CHAFFEY MAINT FACILITY
11500 CUSTER BLVD
FORT SMITH AR 72916
W90XCV
The following Delivery Schedule item for CLIN 0002 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
| 60 dys. ADC |
| 1 |
| W41DVS: FT CHAFFEY MAINT FACILITY |
W41DVS: FT CHAFFEY MAINT FACILITY
11500 CUSTER BLVD
FORT SMITH AR 72916
W90XCV
To:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
| 90 dys. ADC |
| 1 |
| W41DVS: FT CHAFFEY MAINT FACILITY |
W41DVS: FT CHAFFEY MAINT FACILITY
11500 CUSTER BLVD
FORT SMITH AR 72916
W90XCV
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
SUPPLEMENTAL INFORMATION
Contract Specialist:
Jamie Gregar Phone: 608-388-1007 E-mail: jamie.j.gregar.civ@mail.mil
Contracting Officer:
Steve Bailey Phone: 608-388-6077 Email: steven.m.bailey2.civ@mail.mil
Include the following within the sealed bid package:
1) Completed SF1442 with acknowledgement of all amendments
2) Completed SF24
3) Any additional verification documents
4) CD-ROM (CD-R) disk with an electronic copy of all submission requirements listed above.
5) Make sure that your carrier package states the Solicitation Number.
Contractor POC E-mail ____________________________________________
DUNS____________________________________________
TAXPAYER ID #__________________________
This solicitation is a 100% Small Business Set Aside under NAICS code 238990 with a size standard of $15 Million.
Bids can be submitted in any of the following ways:
Delivered to or by Mail:
Mission & Installation Contracting Command – Fort McCoy Attn: Jamie Gregar, Contract Specialist 1108 South R Street Fort McCoy, WI 54656-5153
A site visit is scheduled for May 11, 2017 at 1:00PM Local Time. Interested attendees are asked to meet at BG William O Darby USARC, 101 Fort Street, Barling, AR 72923. The POC for the site visit is Will Williams (497) 968-5334 (0ffice) (501) 297-9663 (cell) See Site Visit in Section 00100. This will be the only site visit conducted, requests for additional site visits will be denied.
For Site Visit information, see Site Visit clause 52.236-27, Alternate 1 in Section 00100. The conference will begin promptly without considerations for late or lost bidders; no subsequent site visits will be considered. Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a formal written amendment issued by the Fort McCoy Contracting Office.
Any questions concerns, verification or clarification of information of the documents included in the solicitation package shall be submitted in writing and submitted to the Government POC’s identified herein no later than Noon, local time on May 18, 2017. Include in the subject line of the email the Government’s solicitation number; failure to do so will lessen the Government’s ability to ensure all questions are considered during the bidding process. Provide your company name, POC and contact information in the body of the email.
The “Equal Employment Opportunity Is the Law” notice (poster) referenced in FAR clause 52.222-26(b) (3), Equal Opportunity, is located at http://www.dol.gov/ofccp/regs/compliance/posters/ofccpost.htm
In accordance with FAR 22.404-10, the contractor must post a copy of the wage determination and Department of Labor Form WH-1321 in a prominent place where employees working on federal construction contracts can easily see it. The applicable wage determination is incorporated into the contract at Section H. The WH-1321 poster is located at http://www.dol.gov/compliance/guide/index.htm
Contractors are referred to EPA’s list of EPA-designated products available at http://www.epa.gov providing products that contain recovered materials.
In accordance with DPAP changes to reporting requirements under FAR 52.223-2, Affirmative Procurement of Bio-based Products under Service and Construction Contracts, contractors are now required to submit annual bio-based reports to the new reporting module in the System for Award Management (SAM). SAM can be accessed at https://www.sam.gov.
VETS-4212 Registration: You shall register on the VETS-4212 site to be considered for award. https://www.dol.gov/vets/vets4212.htm if you have a Government contract or subcontract in the amount of $150,000 or more that was entered into or modified on or after December 1, 2003.
SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already registered, please register in the CCR database at https://www.sam.gov/ www.sam.gov http://www.sam.gov https://www.sam.gov
a. A DUNS number is required for SAM registration. If your company does not have DUNS #, obtain one by calling 800-333-0505.
b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 238990 under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.
c. If the prospective awardee for this request for quotes is not registered in the SAM database by close of solicitation, including NAICS 238990 under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful registered offeror.
SAM REQUIREMENT: Prospective contractors who have not completed electronic annual representations and certifications at www.sam.gov in conjunction with required registration in the SYSTEM for AWARD MANAGEMENT (SAM) database, shall complete and submit 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2014) and 252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2014) in SAM to be eligible to receive an award for this solicitation.
PROJECT MAGNITUDE
The magnitude of this project is between $1,000,000 and 5,000,000.
EVALUATION FACTORS
The Government will evaluate bids received in response to this solicitation solely on the basis of price and price related factors. Bidders shall submit a price for each item specified in the “Schedule of Supplies/Services and Prices/Costs”. No bid for a quantity less than that specified in the Schedule will be accepted. Bids shall be evaluated using the estimated quantities set forth in the Schedule. All prices bid in response to this solicitation must include all costs associated with this project, applicable State sales taxes, permits, and licensure. And the overall project management, superintendence and quality control necessary for the planning and execution of multiple work requirements conducted simultaneously throughout the performance period.
BID GUARANTEE
A Bid Bond/Guarantee is required for this contract if it exceeds $150,000. The Bid Bond amount shall be twenty percent (20%) of the bid price or $3 Million, whichever is less.
Bidders must use the Standard Form (SF) 24 if providing a bid bond as the bid guarantee.
Attachments:
Attachment 1 – Scope of Work Attachment 2 – Drawings Attachment 3 – ATOPSEC Attachment 4 – Wage Determination Attachment 5 – SF24 Attachment 6 – Additional Information
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
QUESTIONS & ANSWERS
Q1: What are the requirements on the existing base material before placement of new rock base? Is it going to be required to screen the existing base material to remove all organic material from it? If not screened then must all root materials be removed from existing base rock prior to new base rock being installed due to fact that roots are already established throughout the depth of existing in place base material?
A1: PER SOW 4.3; the Contractor shall remove and demolish all (Approx. 1,700 linear ft.) existing barbed wire fence along the boundaries of the new MEP area as shown on Drawing C1. The Contractor shall remove and demolish all existing trees, vegetation and debris from the site of the new MEP area (Reference Drawing C1). An approved herbicide should be used to kill all existing grass and weed on site. All tree stumps shall be pulled up, removed and hauled away. The intent is to remove/kill all existing vegetation and its supporting root structure (to include stumps) by whatever means the contractor deems viable, before any new work is begun. Although the SOW calls out an herbicide application, the actual process is left to the contractor’s discretion as long as the result meets the requirement.
PER SOW 4.7.1; Reuse as much of the existing gravel as possible. If gravel is reused it must be thoroughly sifted to remove debris. The intent is that any existing gravel that is removed or disturbed should be reused where possible, and must be sifted to remove debris prior to reuse.
PER SOW 4.6; the contractor shall excavate/backfill/hard compact the areas that had trees and all and any low areas (Approx. 180,000 Sq. Ft) as needed to provide a finished surface elevation that shall follow the slope of the existing terrain to ensure for proper drainage/water runoff and to prevent any standing water. (These areas should be identified and field verified with the AFOS/COR) The intent in the area of tree/stump removal is for the contractor to backfill the area to match the existing gravel surface in depth and elevation, after 95% Proctor Density Compaction, and before application of the new top gravel. The intent is for the contractor to identify and correct any existing low spots in the existing surface that hold water or otherwise do not drain well. The corrected area must, after corrective action, achieve 95% Proctor Density Compaction prior to the application of new top gravel. It may be necessary to verify these areas with the AFOS/COR.
Q2: Is there a geotechnical report available on this site?
A2: No
Q3: Will there be an alternate bid amount if additional undercut and backfill with select material is required?
A4: No
Q4: What are the requirements on the testing of base rock materials?
A4: The intent is for the base course materials to achieve a 95% Proctor Density Compaction rating before any of the new top gravel is applied.
Q5: What are the testing and compaction requirements on sub grade material?
A5: The intent is for the base course materials achieve a 95% Proctor Density Compaction rating before any of the new top gravel is applied.
Q6: The 60 day schedule indicated at pre bid would be an aggressive time frame due to the existing site conditions and we would need to request a mod to reflect 90 day on our portion is that an option?
A6: The period of performance is being revised to 90 days. We do not issue contract awards with the intention of future modifications.
Q7. Are we required to level the lot or just follow the contour of the existing?
A7: PER SOW 4.7; The Contractor shall completely gravel the new expanded MEP area approx. 13.60 acres (593,000 Sq. Ft) to a consistent level. The area that had trees along with some low areas will require more gravel to maintain an equal level with the rest of the site. The entire MEP lot should be graveled uniformly to a level distance of approximately 6 to 8 inches or as needed. The gravel should be an aggregate base course of ¾ to 1 inch stone up to 8 inches deep, installed in 4 inch lifts to ensure proper compaction. The intent is for the contractor to follow the contours of the land, but maintain the new top gravel at a consistent thickness. The intent is for the contractor to apply the new top gravel in even, consecutive lifts, achieving 95% Proctor Density Compaction on each lift, before application of the next lift.
Questions for electrical:
Q8: Catalog numbers for existing pole lights?
A8: PER SOW 1.9; the Contractor shall verify all dimensions, site conditions, and any other items required to install a complete and ready to use product, prior to submitting a bid proposal for construction. To the best of our knowledge, documentation cataloging the existing light poles does not exist.
Q9: Any specs on switch gear or material?
A9: PER SOW 1.9; the Contractor shall verify all dimensions, site conditions, and any other items required to install a complete and ready to use product, prior to submitting a bid proposal for construction. No, however it is recommended that all new switch gear match in like and kind any existing switch gear, and be rated to manage the new lighting requirement.
Q10: How tall do pole lights need to be, and are they square or round poles?
A10: PER SOW 1.9; the Contractor shall verify all dimensions, site conditions, and any other items required to install a complete and ready to use product, prior to submitting a bid proposal for construction. The intent is that all new light pole installations match in like and kind any existing light poles, if possible. If a match in like and kind is not possible, the contractor shall utilize available components that match as closely as possible to the existing light pole installations.
Q11: How many fixture heads per pole?
A11: PER SOW 4.9; The Contractor shall install all new LED Lights/Fixtures (On-Grid) and Poles supported on concrete bases as required by code to the new expanded MEP area. The lights should be installed and located at the necessary wattage and quantity needed to provide sufficient lighting requirements for this area. (See Drawing C3 for approximate location and dimensions) The intent is to maintain .02 ft. candles of lighting throughout the fenced MEP interior. It is recommended that a lighting survey analysis be conducted to determine the components necessary to meet the requirement.
Q12: If only one or two lights per pole, which way will the lights face?
A12: The intent is to maintain .02 ft. candles of lighting throughout the fenced MEP interior. It is recommended that a lighting survey analysis be conducted to determine the components necessary to meet the requirement.
Q13: Any grounding or lightning protection for fencing?
A13: No
Q14. Voltage on existing pole lights?
A14: PER SOW 1.9; the Contractor shall verify all dimensions, site conditions, and any other items required to install a complete and ready to use product, prior to submitting a bid proposal for construction. To the best of our knowledge, the existing voltage is 120/240 VAC single phase.
Additional Questions:
Q15: SOW 4.10. The description needs more information to determine location of source power. The drawings do not show Custer Blvd and the scale does not work. Please provide more information and a scale to use for length of run.
A15: PER SOW 1.9; the Contractor shall verify all dimensions, site conditions, and any other items required to install a complete and ready to use product, prior to submitting a bid proposal for construction. All drawings are for reference purposes only, and are not provided “to scale”. The governments expectation is that by reducing the existing MEP lighting to LED, the present power requirement will be reduced sufficiently to support the addition of the new LED light pole requirement. If the available power is insufficient to support the new LED light pole requirement, after converting the existing light poles to LED, there is an existing power pole located outside the NW corner of the existing MEP fence. However, if the existing power is inadequate, or the route is not feasible, the contractor shall consult with the AFOS/COR on the most feasibly economic route that will meet the requirement.
Q16: Please provide Pole Base detail.
A16: This document includes the standard MEP light pole base requirement.
Q17: The scale does not seem to work, even the two dimensions shown on C3 contradicts each other using one standard scale. How should we measure given the dimensions do not appear correct?
A17: PER SOW 1.9; the Contractor shall verify all dimensions, site conditions, and any other items required to install a complete and ready to use product, prior to submitting a bid proposal for construction. All drawings are for reference purposes only, and are not provided “to scale”.
Q18: Each new LED pole is to have 3 bollards, where is the bollard detail?
A18: This document includes the standard Bollard requirement.
Q19: Are there jobsite photos available?
A19: There will be an attachment with this Amendment with google map shots.
Q20: SOW 4.12 refers to existing fixtures. Poles and bases are to be reused. In order to provide the correct fixtures, we need to know exactly what is there now. Please provide pole manufacture, model and height and current light fixtures on those poles.
A20: PER SOW 1.9; the Contractor shall verify all dimensions, site conditions, and any other items required to install a complete and ready to use product, prior to submitting a bid proposal for construction. To the best of our knowledge, documentation cataloging the existing light poles does not exist. To the best of our knowledge, the existing poles are 35’ tall with 400 watt metal halide fixtures.
Q21: SOW 4.12 also mentions “sufficient light level” for this area. Please provide the minimum foot-candles to meet.
A21: .02 ft. candles throughout the fenced interior of the MEP is the minimum requirement.