W911SA-16-T-0088_Attachment_2_PRS.docx
DOCX document 22 KB Posted
- Attached to
- Snow Removal/Salt Services Federal contract opportunity
- Solicitation number
- W911SA-16-T-0088
About this file
W911SA-16-T-0088 Attachment 2 PRS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SA-16-T-0088_Attachment_2_PRS.docx | DOCX document | |
| W911SA-16-T-0088_Attachment_5_Price_Schedule.xlsx | XLSX spreadsheet | |
| W911SA-16-T-0088-0001_Amendment_1.pdf | ||
| W911SA-16-T-0088_Attachment_4_AT_OPSEC.pdf | ||
| W911SA-16-T-0088_Attachment_3_Drawing.pdf | ||
| W911SA-16-T-0088_Solicitation.pdf | ||
| W911SA-16-T-0088_Attachment_1_Deliverables.docx | DOCX document | |
| W911SA-16-T-0088_Attachment_5_Price_Schedule.xlsx | XLSX spreadsheet | |
| W911SA-16-T-0088_Attachment_4_AT_OPSEC.pdf | ||
| W911SA-16-T-0088_Attachment_1_Deliverables.docx | DOCX document | |
| W911SA-16-T-0088_Solicitation.pdf | ||
| W911SA-16-T-0088_Attachment_3_Drawing.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 – Performance Requirements Summary (PRS)
| PRS # |
| Performance Objective |
| Performance Standard |
| AQL |
| Workload Indicator(s) / Lot size |
| Method of Surveillance |
| Consequence |
| 1. |
| PWS Para 5.3 General |
| Snow plowing operations shall begin within two (2) hours after notification. |
| Not more than 2 validated customer complaints per month |
| # of Customer complaints received |
| Customer complaint |
| Level 2 Non-Conformance CDR. Results recorded on performance record, may be reported in CPARS |
| 2. |
| PWS Para 5.4, 5.5, 5.6, 5.7. Types 1 - 4 Snow Plowing |
| Snow and ice shall be plowed and cleared from roads, sidewalks, parking lots, and MEPs as applicable to the type and as indicated on the drawings. |
| Not more than 2 validated customer complaints per month |
| # of Customer complaints received |
| Customer complaint |
| Level 2 Non-Conformance CDR. Results recorded on performance record, may be reported in CPARS |
| 3. |
| PWS Para 5.8 Type 5 Salting / Sanding |
| Contractor shall treat all plowed and cleaned surfaces skid free. |
| Not more than 2 validated customer complaints per month |
| # of Customer complaints received |
| Customer complaint |
| Level 2 Non-Conformance CDR. Results recorded on performance record, may be reported in CPARS |
| 4. |
| PWS Para 5.9 Type 6 Snow Removal Operations |
| Accumulated snow and ice shall be moved by the contractor to the designated dumping site. |
| Not more than 2 validated customer complaints per month |
| # of Customer complaints received |
| Customer complaint |
| Level 2 Non-Conformance CDR. Results recorded on performance record, may be reported in CPARS |
| 5. |
| PWS Para 5.11 Report ALL Contractor manpower required for performance of this contract |
| Reported NLT the 31st of October each year. Reporting period shall be the Period of Performance, not to exceed 12 months, ending September 30 of each government fiscal year |
| Reported 100% of the time each year |
| Annual completed CMR |
| 100% Surveillance |
| Contract Discrepancy Report (CDR), 1% reduction in payment (RIP) of contract cost within CMR contract year |
Note: Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.
PRS Description of contents:
a. PRS #: indicates the numbering sequence within the PRS table .
b. Performance Objective: PWS paragraph number(s) specifying each required task(s) and brief summary of required task(s) to be monitored.
c. Performance Standard: appropriate performance standard, usually described in terms of quality and timeliness, so that a distinction can be made between satisfactory and unsatisfactory performance.
d. Acceptable Quality Level (AQL): This column lists the maximum allowable degree of deviation from perfect performance of each requirement before the Government considers contractor performance unsatisfactory. An AQL does not say the contractor may knowingly offer defective service to the Government, but recognizes defective performance sometimes happens unintentionally.
e. Workload Indicator(s)/Lot size: This column indicates what will be directly utilized to obtain the lot size and validate the performance objective is achieved.
f. Method of Surveillance: method(s) utilized to objectively perform surveillance of requirement.
g. Consequence of failure to achieve the AQL.