PRS.docx
DOCX document 15 KB Posted
- Solicitation number
- W911SA-15-T-0213
About this file
Attachment 2 PRS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATOPSEC.pdf | ||
| solicitation.docx | DOCX document | |
| CDRL.docx | DOCX document | |
| HistoricalData.docx | DOCX document | |
| Evaluation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7.2 Technical Exhibit #2 – Performance Requirements Summary (PRS)
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance thresholds provided below describe the minimum acceptable levels of service required for each requirement.
Note: Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.
| PRS # |
| Performance Objective |
| Performance Standard |
| AQL |
| Workload Indicator(s)/Lot size |
| Method of Surveillance |
| Consequence |
| 1. |
| PWS Para 5.4 Invoice |
| Submitted into WAWF the first working day after services are performed. |
| Reported 100% of the time |
| 1 Report |
| 100% Surveillance |
| CDR. Results of this performance objective, along with justification, will be documented in monthly metric and used for reporting contractor past performance. |
| 2. |
| PWS Para 5.7. Report ALL Contractor manpower required for performance of this contract. |
| Reported NLT the 31st of October each year. Reporting period shall be the Period of Performance, not to exceed 12 months, ending September 30 of each government fiscal year. |
| Reported 100% of the time |
| Annual completed CMR |
| 100% Surveillance |
| 1% reduction in payment (RIP) of contract cost within CMR contract year. |
PRS Description of contents:
a. PRS #: indicates the numbering sequence within the PRS table.
b. Performance Objective: PWS paragraph number(s) specifying each required task(s) and brief summary of required task(s) to be monitored.
c. Performance Standard: appropriate performance standard, usually described in terms of quality and timeliness, so that a distinction can be made between satisfactory and unsatisfactory performance.
d. Actual Quality Level (AQL): This column lists the maximum allowable degree of deviation from perfect performance of each requirement before the Government considers contractor performance unsatisfactory. An AQL does not say the contractor may knowingly offer defective service to the Government, but recognizes defective performance sometimes happens unintentionally.
e. Workload Indicator(s)/Lot size: This column indicates what will be directly utilized to obtain the lot size and validate the performance objective is achieved.
f. Method of Surveillance: method(s) utilized to objectively perform surveillance of requirement.
g. Consequence of failure to achieve the AQL.
File details come from the government source that posted it. Updated .