W911SA-24-Q-3090 Attachment 6 - Room Chart - Task Frequency V2.xlsx

XLSX spreadsheet 57 KB Posted

Attached to
Custodial Services at IL177 (MS) - Peru & Decatur Illinois
Solicitation number
W911SA24Q3090
Issued by

About this file

This document is a room chart and task frequency schedule for custodial services at two facilities in Illinois under Solicitation W911SA24Q3090.

The room chart provides details on the square footage, room types, and flooring for the facilities located in Decatur, IL (16,056 sq ft) and Peru, IL (8,603 sq ft). The task frequency schedule outlines the required custodial services, frequencies, and scope of work for areas such as floors, restrooms, dusting, and glass cleaning. The services are to be performed weekly, monthly, semi-annually, and annually as specified. The solicitation is for a 1-year base period with four 1-year option periods and a 6-month extension option. Quotes are due by the date and time listed in the solicitation, which will be issued on March 28, 2024. Interested vendors should access the solicitation at www.sam.gov.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IL021 Room Chart

Room Schedule
IL021 (17863) 2300 N 22ND ST DECATUR IL 62526 USARC
ROOM #Room TypeFloor TypeSQ FT
FIRST FLOOR
STAIR 1CONCRETE193
STAIR 2CONCRETE248
ENTRANCESVestibuleTILE155
LOBBYLOBBYTILE370
HALLWAYCorr 13 and 14TILE1059
100OFFICETILE348
101OFFICETILE185
102PHYSICAL READINESSRUBBER947
103OFFICETILE179
104SCULLERYTILENIC
105PANTRYTILENIC
106KITCHENTILENIC
107ELECTRICAL ROOMCONCRETENIC
108ARMORERCONCRETENIC
109VAULTCONCRETENIC
110WMN LATRINETILE/CONCRETE320
111JANITOR'S CLOSETCONCRETENIC
112Males LATRINETILE169
113HALLWAYTILE576
113ASIPR ROOMTILENIC
113BIT/COMMTILENIC
114STORAGECONCRETENIC
115STORAGETILENIC
116OFFICETILE155
117OFFICETILE155
118DRILL HALLCONCRETE2719
119Mechinical RMCONCRETENIC
SECOND FLOOR
HALLWAYCORR 21 and 22TILE958
200 & 201CLASSROOMTILE991
202GYMTILE979
204CLASSROOMTILE520
205CLASSROOMTILE471
206ELECTRICAL ROOMCONCRETENIC
207RFG OFFICETILE150
208Mens LOCKER ROOMTILE1236
208AMens ShowersTILE182
209Mens LatrineTILE271
211Office (cubicals)Carpet2520
TOTAL16056
NIC NOT IN CONTRACT

IL021Task & Frequency

Task and Frequency Chart V 2.0
IL021(17863) 2300 N 22ND ST DECATUR IL 62526
V 2.0 (3 AUG 2023)
CUSTODIAL SERVICES SHALL BE PERFORMED IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS AND AT THE FREQUENCIES INDICATED BELOW.
TaskFrequencyScope of Work ParagraphItem DescriptionQuantity
1. Floor Cleaning: Vinyl Tile7251 Sq. Ft.Toilets13
Rooms: 100, 101, 103, 113, 116, 117, 200, 201, 202, 204, 205, 207, HALLWAYS, LOBBY, ENTRANCEUrinals7
a. Sweep/Dust Mop1x weekly Monday5.2.4Sinks13
b. Damp Mop1x weekly Monday5.2.5Utility Sinks2
c. Spray Buff2x; Semi-annual - June-Dec5.2.10Showers9
d. Strip, rewax, buff1x Annually - APR5.2.7, 5.2.8, 5.2.9Soap Dispensers10
e. Remove trash/Recyclables1x weekly Monday5.2.3Paper Towel Dispensers7
Wastebaskets33
2. Floor Cleaning: Carpet2520 Sq. Ft.Water Fountains2
Rooms: 211Windows71
a. Vacuum1x weekly Monday5.2.11
b. Shampoo1x Annually - APR5.2.12
c. Remove trash/Recyclables1x weekly Monday5.2.3NOTE: The counts provided in the T&F chart are approximate numbers. A modification to the resultant contract will not be completed for minor differences between the counts provided in the T&F and the actual numbers on site. If a site visit is scheduled it is highly encouraged that vendors attend in order to confirm exact numbers.
3. Rest Room Cleaning - Tile and Concrete2178 Sq. Ft.
Rooms: 110, 112, 208,208a, 209
a. Service restrooms1x weekly Monday5.2.21
b. Toilet bowls, urinals, washbowls, showers, mirrors1x weekly Monday5.2.22.1, 5.2.22.2, 5.2.22.5, 5.2.22.6, 5.2.23, 5.2.24, 5.2.25, 5.2.26, 5.2.29, 5.6
c. Floor cleaning1x weekly Monday5.2.4, 5.2.22.3
d. Tile & Grout Cleaning1x Annually - April5.2.28
e. Cleaning walls, partitions1x weekly Monday5.2.22.4
f. Remove trash/Recyclables1x weekly Monday5.2.3
4. Floor Cleaning: CONCRETE Stairwell441 Sq. Ft.
Rooms: STAIRS 1 AND STAIRS 2
a. Sweep/Dust Mop1x weekly Monday5.2.13
b. Damp Mop1x weekly Monday5.2.14
c. Clean Staircases1x weekly Monday5.2.15
5. Floor Cleaning: CONCRETE2719 Sq. Ft.
Rooms: 118
a. Sweep/Dust Mop1x weekly Monday5.2.13
b. Damp Mop1x weekly Monday5.2.14
c. Remove trash1x weekly Monday5.2.3
6. Floor Cleaning: Rubber947 Sq. Ft.
Rooms: 102
a. Sweep/Dust Mop1x weekly Monday5.2.13
b. Damp Mop1x weekly Monday5.2.14
c. Remove trash1x weekly Monday5.2.3
7. Dusting
All rooms scheduled to be cleaned
a. Low dusting1x weekly Monday5.2.16
b. High dusting2x Annual - APR & OCT5.2.17
8. Glass Cleaning
All rooms scheduled to be cleaned
a. Interior windows1x Annually - MAY5.2.1
b. Exterior windows1x Annually - MAY5.2.2
c. Interior glass1x weekly Monday5.2.29
9. Miscellaneous Cleaning
All areas scheduled for cleaning
a. Fountains, sinks1x weekly Monday5.2.18, 5.2.23
b. Rugs, walk-off mats1x weekly Monday5.2.6
c. Janitorial Closet1x weekly Monday5.2.19
d. Entrances1x weekly Monday5.2.20
Total sq ft 16056

IL021 OMS ROOM CHART

Room Schedule
IL021 (17863) 2300 N 22ND ST DECATUR IL 62526 OMS
ROOM #Room TypeFloor TypeSQ FT
1BAYCONCRETENIC
2OFFICETILE150
3LATRINETILE80
4LATRINETILE50
5STORAGECONCRETENIC
6STORAGECONCRETENIC
7STORAGECONCRETENIC
8OFFICECONCRETE150
TOTAL430
NIC NOT IN CONTRACT

IL021 OMS Task & Frequency

Task and Frequency Chart V 2.0
IL021(17863) 2300 N 22ND ST DECATUR IL 62526 OMS
V 2.0 (3 AUG 2023)
CUSTODIAL SERVICES SHALL BE PERFORMED IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS AND AT THE FREQUENCIES INDICATED BELOW.
TaskFrequencyScope of Work ParagraphItem DescriptionQuantity
1. Floor Cleaning: Vinyl Tile150 Sq. Ft.Toilets2
Rooms: 2Urinals1
a. Sweep/Dust Mop1xwkly;Monday5.2.4Sinks2
b. Damp Mop1xwkly;Monday5.2.5Utility Sinks1
c. Spray Buff2x; Semi-annual - June-Dec5.2.10Showers2
d. Strip, rewax, buff1x Annually - APR5.2.7, 5.2.8, 5.2.9Soap Dispensers2
e. Remove trash/Recyclables1xwkly;Monday5.2.3Paper Towel Dispensers2
Wastebaskets4
2. Floor Cleaning: Concrete150 Sq. Ft.Water Fountains0
Rooms: 8Windows1
a. Sweep/Dust Mop1xwkly;Monday5.2.4
b. Damp Mop1xwkly;Monday5.2.5
c. Remove trash/Recyclables1xwkly;Monday5.2.3NOTE: The counts provided in the T&F chart are approximate numbers. A modification to the resultant contract will not be completed for minor differences between the counts provided in the T&F and the actual numbers on site. If a site visit is scheduled it is highly encouraged that vendors attend in order to confirm exact numbers.
3. Rest Room Cleaning - Tile and Concrete130 Sq. Ft.
Rooms: 3, 4
a. Service restrooms1xwkly;Monday5.2.21
b. Toilet bowls, urinals, washbowls, showers, mirrors1xwkly;Monday5.2.22.1, 5.2.22.2, 5.2.22.5, 5.2.22.6, 5.2.23, 5.2.24, 5.2.25, 5.2.26, 5.2.29, 5.6
c. Floor cleaning1xwkly;Monday5.2.4, 5.2.22.3
d. Tile & Grout Cleaning1x Annually - APRIL5.2.28
e. Cleaning walls, partitions1xwkly;Monday5.2.22.4
f. Remove trash/Recyclables1xwkly;Monday5.2.3
4. Dusting
All rooms scheduled to be cleaned
a. Low dustingOne Time Monthly5.2.16
b. High dusting2x; Semi-annual - APR & OCT5.2.17
5. Glass Cleaning
All rooms scheduled to be cleaned
a. Interior windows1x Annually - MAY5.2.1
b. Exterior windows1x Annually - MAY5.2.2
c. Interior glassOne Time Monthly5.2.29
6. Miscellaneous Cleaning
All areas scheduled for cleaning
a. Fountains, sinks1xwkly;Monday5.2.18, 5.2.23
b. Rugs, walk-off mats1xwkly;Monday5.2.6
c. Janitorial Closet1xwkly;Monday5.2.19
d. Entrances1x Monthly5.2.20
Total 430 sq ft

IL064 Room Chart

Room Schedule
IL064 (17928) 2700 PLANK RD PERU IL 61354 USARC
ROOM #Room TypeFloor TypeSQ FT
HALLWAYTILE1135
103BREAK ROOMTILE100
104OFFICETILE183
105RANGE ROOMCONCRETE1734
106VAULTSTEALNIC
107VAULTSTEALNIC
108VAULTSTEALNIC
110STORAGECONCRETENIC
111Jantorial RMCONCRETENIC
112OFFICECARPET278
114OFFICETILE738
115OFFICETILE103
116OFFICETILE126
117OFFICETILE124
118CLASSROOMTILE443
119CLASSROOMTILE443
121STORAGECONCRETENIC
122LATRINETILE212
123LATRINETILE56
125JANITOR'S CLOSETCONCRETENIC
128DRILL HALLCONCRETE2928
SECOND FLOOR
STAIRSCONCRETENIC
201MECH ROOMCONCRETENIC
202BOILER ROOMCONCRETENIC
203MEZZANINECONCRETENIC
TOTAL8603
NIC NOT IN CONTRACT

IL064 Task & Frequency

Task and Frequency Chart V 2.0
IL064 (17928) 2700 PLANK RD PERU IL 61354 USARC
V 2.0 (3 AUG 2023)
CUSTODIAL SERVICES SHALL BE PERFORMED IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS AND AT THE FREQUENCIES INDICATED BELOW.
TaskFrequencyScope of Work ParagraphItem DescriptionQuantity
1. Floor Cleaning: Vinyl Tile3395 Sq. Ft.Toilets5
Rooms: 103, 104, 114, 115, 116, 117, 118, 119, HALLWAYSUrinals2
a. Sweep/Dust MopOne Time Monthly5.2.4Sinks6
b. Damp MopOne Time Monthly5.2.5Utility Sinks2
c. Spray Buff2x; Semi-annual - June-Dec5.2.10Showers0
d. Strip, rewax, buff1x Annually - APR5.2.7, 5.2.8, 5.2.9Soap Dispensers4
e. Remove trash/RecyclablesOne Time Monthly5.2.3Paper Towel Dispensers3
Wastebaskets7
2. Floor Cleaning: Carpet278 Sq. Ft.Water Fountains11
Rooms: 112Windows15
a. Vacuum1x MONTHLY5.2.11
b. Shampoo1x Annually - APR5.2.12
c. Remove trash/Recyclables1xMONTHLY5.2.3NOTE: The counts provided in the T&F chart are approximate numbers. A modification to the resultant contract will not be completed for minor differences between the counts provided in the T&F and the actual numbers on site. If a site visit is scheduled it is highly encouraged that vendors attend in order to confirm exact numbers.
3. Rest Room Cleaning - Tile and Concrete268 Sq. Ft.
Rooms: 122, 123
a. Service restrooms1xMONTHLY5.2.21
b. Toilet bowls, urinals, washbowls, showers, mirrors1xMONTHLY5.2.22.1, 5.2.22.2, 5.2.22.5, 5.2.22.6, 5.2.23, 5.2.24, 5.2.25, 5.2.26, 5.2.29, 5.6
c. Floor cleaning1xMONTHLY5.2.4, 5.2.22.3
d. Tile & Grout Cleaning1x Annually - APRIL5.2.28
e. Cleaning walls, partitionsOne Time Monthly5.2.22.4
f. Remove trash/Recyclables1xMONTHLY5.2.3
4. Floor Cleaning: Concrete4662 Sq. Ft.
Rooms: 105, 128
a. Sweep/Dust Mop1xMONTHLY5.2.4
b. Damp Mop1xMONTHLY5.2.5
c. Remove trash/Recyclables1xMONTHLY5.2.3
5. Dusting
All rooms scheduled to be cleaned
a. Low dustingOne Time Monthly5.2.16
b. High dusting2x; Semi-annual - APR & OCT5.2.17
6. Glass Cleaning
All rooms scheduled to be cleaned
a. Interior windows1x Annually - MAY5.2.1
b. Exterior windows1x Annually - MAY5.2.2
c. Interior glassOne Time Monthly5.2.29
7. Miscellaneous Cleaning
All areas scheduled for cleaning
a. Fountains, sinksOne Time Monthly5.2.18, 5.2.23
b. Rugs, walk-off matsOne Time Monthly5.2.6
c. Janitorial ClosetOne Time Monthly5.2.19
d. EntrancesOne Time Monthly5.2.20
Total sq ft 8603

IL064 OMS ROOM CHART

Room Schedule
IL064 (17928) 2700 PLANK ROAD PERU IL 61354 OMS
ROOM #Room TypeFloor TypeSQ FT
M01BAYCONCRETENIC
M02OFFICETILENIC
M03STORAGECONCRETENIC
M04STORAGECONCRETENIC
TOTAL0

IL064 OMS Task & Frequency

Task and Frequency Chart V 2.0
IL064 (17928) 2700 PLANK RD PERU IL 61354 USARC OMS
V 2.0 (3 AUG 2023)
CUSTODIAL SERVICES SHALL BE PERFORMED IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS AND AT THE FREQUENCIES INDICATED BELOW.NOTE: The counts provided in the T&F chart are approximate numbers. A modification to the resultant contract will not be completed for minor differences between the counts provided in the T&F and the actual numbers on site. If a site visit is scheduled it is highly encouraged that vendors attend in order to confirm exact numbers.
TaskFrequencyScope of Work Paragraph
1. Floor Cleaning: BioBased Tile (BBT)0 Sq. Ft.
Rooms:
a. Sweep/Dust MopNA5.2.4
b. Damp MopNA5.2.5
c. Spray Buffing/BurnishingNA5.2.9, 5.2.10
d. Strip, Apply Floor Sealer,Apply Floor Polish, Buffing/BurnishingNA5.2.7, 5.2.8, 5.2.9
e. Remove trash/RecyclablesNA5.2.3

Total sq ft 0

14. Dusting
All rooms scheduled to be cleaned
a. Low dustingOne Time Monthly5.2.16
b. High dusting2x; Semi-annual -MM MM5.2.17
15. Glass Cleaning
All rooms scheduled to be cleaned
a. Interior windows1x Annually - MMM5.2.1
b. Exterior windows1x Annually - MMM5.2.2
c. Interior glassOne Time Monthly5.2.29
16. Miscellaneous Cleaning
All areas scheduled for cleaning
a. Fountains, sinks1xwkly;Monday5.2.18, 5.2.23
b. Rugs, walk-off mats1xwkly;Monday5.2.6
c. Janitorial Closet1xwkly;Monday5.2.19
d. Entrances1x Monthly5.2.20
e. Metal1x Monthly5.2.24, 5.2.25
f. Doors1x Monthly5.2.26
g. Air Intake / Exhaust Grills1x Monthly5.2.27

File details come from the government source that posted it. Updated .