Wellhead Protection Plan Well No. 26
Fort McCoy, South Post OTM Community Public Water System
DNR Project No. W-2012-0430A
1st revision May 4th, 2021
Fort McCoy, South Post OTM Community Public Water System
Prepared for:
Fort McCoy, South Post OTM Community Public Water System
Prepared by:
Short Elliott Hendrickson Inc.
312 South 3rd Street
La Crosse, WI 54601-4007
608.782.3161
I, Randy Sanford, PE, hereby certify that I am a registered Professional Engineer in the State of
Wisconsin in accordance with ch. A-E 4, Wis. Adm. Code and that this report has been prepared in accordance with the Rules of Professional Conduct in ch. A-E 8, Wis. Adm. Code.
PE Number Date
Date
4 May 2021
Michael Miller Water and Wastewater
Branch Chief
Table of Contents
Page
1.0 Introduction
2.0 Background
2.1 Water System Overview
2.2 Local Setting
2.3 Local Geology
3.0 Identification of Groundwater Flow Direction
4.0 Identification of the Recharge Area and Zone of Influence
5.0 Identification of Existing Potential Contamination Sources Within One-Half Mile
Radius of Well
6.0 Establishment of Wellhead Protection Area (WHPA)
7.0 Public Education
8.0 Water Conservation Program
9.0 Contingency Plan
10.0 Management Plan
10.1 Wellhead Protection Area
10.2 Separation Distances
List of Tables Table 1 - Well No. 26 Geologic Formations Table 2 - Well No. 26 Potential Contamination Sources
Wellhead Protection Plan Page i
May 2021, first revision
Well No. 26 Prepared for Fort McCoy
1.0 Introduction
Wisconsin Department of Natural Resources (WDNR) and U.S. Environmental Protection Agency (USEPA) rules require that new community wells in Wisconsin have a WDNR-approved Wellhead Protection Plan (WHPP).
The purpose of a WHPP is to minimize the risk of contamination of public groundwater supplies by assessing and managing activities in the land area around the well. This WHPP details the type of groundwater supply sources, identifies the recharge areas and groundwater flow direction, and outlines a Wellhead Protection Area (WHPA) for the Village of Turtle Lake’s Well No.4.
Requirements for WHPPs are defined by Wisconsin Administrative Code § NR 811.12(6).
WHPPs shall include:
• Identification of zone of influence
• Identification of recharge area
• Identification of groundwater flow direction
• Identification and assessment of potential contamination sources
• Establishment of a wellhead protection area (WHPA)
• Public education program for wellhead protection
• Water conservation program
• Contingency plan
• Management plan
2.0 Background
2.1 Water System Overview
Well No. 26 was constructed in 2014 to meet the Fort McCoy South Post need of a reliable water source and more water supply due to increased development within the Family Housing Area. It replaced Well No. A, which was limited in its ability to be used as a potable water source to meet the needs of the South Post by shallow casing depth and smaller diameter casing for Well No. A.
Well No. A was drilled in 1928 within sandstone bedrock belonging to a Cambrian-age Formation. The sandstone formation occurred from 18 to 172 foot depths in Well No. A with an unconsolidated sand deposit overlying the sandstone bedrock. The well was constructed with a 10-inch primary casing to 30.8 feet below ground surface (Wisconsin DNR – Public Water Supply Systems).
Well No. 26 and Well No. 21 supply the South Post Other Than Municipal (OTM) public water system. The wells pump to two water storage tanks and the system’s distribution system.
2.2 Local Setting
Well No. 26 is located within the South Post Family Housing Area of Fort McCoy Military Reservation on a 545.5 acre parcel. The well is centered on a minimum 100-foot by 100-foot area designated as the well site parcel by adoption of this Wellhead Protection Plan.
The elevation at the site is approximately 864 feet MSL. The site is fairly flat. General topography slopes to the northwest toward the La Crosse River.
2.3 Local Geology
The sandstone formation at Well No. 26 occurs from approximately 20 to 172 foot depths with an unconsolidated sand deposit overlying the sandstone bedrock.
Formations encountered at the well are shown in the table below. Geologic information is based on the geologic log prepared by the well driller.
The well construction report for Well No. 26 is found in Appendix A.
Table 1 Well No. 26 Geologic Formations
Interval Top
(feet)
Interval Base (feet)
Formation
0 1 Topsoil 1 10 Brown sand
10 25 Dark brown sand 25 30 Orange sand 30 45 Dark brown sand 45 50 Brown sandstone with gravel 50 80 Yellow sandstone (hard) 80 140 Tan hard sandstone 140 172 White hard sandstone
Wellhead Protection Plan Page 2
3.0 Identification of Groundwater Flow Direction
NR 811.12(6)(a)
Groundwater flow direction is to the northwest as shown on the Wisconsin Geologic and Natural History Survey, Groundwater Elevation Map contained in Attachment A (WGNHS, September 1981).
4.0 Identification of the Recharge Area and Zone of Influence NR 811.12(6)(b)-(c)
The zone of influence (ZOI) was calculated based on Wisconsin Administrative Code NR 811 requirements of 30 days continuous pumping at the anticipated final pumping rate and assuming 1 foot of drawdown at the limits of the ZOI.
The ZOI for the proposed well was calculated using aquifer properties determined from a pumping test of Well No. 26. The ZOI for 30 days continuous pumping is approximately 1,200 feet.
The recharge area for the new well was calculated using the Uniform Flow Equation. The Uniform Flow Equation uses aquifer properties of transmissivity and ground water flow gradient. Transmissivity was calculated from a pumping test of Well No. 26. The groundwater flow gradient was estimated to be 0.007 ft/ft and was based on contours shown on the generalized groundwater elevation maps of Monroe County (Figure 1).
Calculations are found in Appendix B.
5.0 Identification of Existing Potential Contamination Sources Within One-Half Mile Radius of Well NR 811.12(6)(d)
A review of potential contaminant sources was conducted by searching Wisconsin Department of Natural Resources (WDNR), Wisconsin Department of Commerce (Commerce), and U.S. Environmental Protection Agency (USEPA) databases. During the well site investigation process, the site was also evaluated for separation from potential contaminant sources identified in Wis. Adm. Code Chapter NR811.
Potential contamination sources with one-half mile of the well location identified in the Public Water Supply Potential Contaminant Use Inventory form found in Appendix A and are
Wellhead Protection Plan Page 3 summarized in the table below, including an assessment of the potential for the contamination sources to impact the well.
Table 2 Well No. 26 Potential Contamination Sources
Map Code Description
Distance/Direction from Well 26 Potential to Impact Well
CRT Railroad track identified by Environmental First Search as Quarry Hill Road spill
> ½ mile northwest Unlikely to impact well
GFA Fuel storage tank: LP tank 50 feet south Unlikely to impact well: new double walled tank
WLS Leaking underground storage tank (LUST) site: Building 6250
> 1 mile south Unlikely to impact well, site is outside of the 1,200 foot setback
6.0 Establishment of Wellhead Protection Area (WHPA)
NR811.12(6)(e)
The WHPA is based on the portion of recharge area equivalent to a 5-year time of travel to Well No. 26 and is shown on Figure 2. Note that Figure 2 also depicts the capture zone for Well No. 21.
The time of travel was calculated using the fixed radius method. However, because this approach gives an area of less than 1,200 feet from well, a radius of 1,200 feet from Well No.
26 was used to establish the WHPA.
7.0 Public Education
NR811.12(6)(f)
The WHPP will be available to the public at the Public Works Department.
8.0 Water Conservation Program
NR811.12(6)(g)
See the Public Works Department for information pertaining to Water Conservation at Fort McCoy.
Wellhead Protection Plan Page 4
9.0 Contingency Plan
NR811.12(6)(h)
The South Post water supply contingency plan for replacing supply lost if a well should become contaminated includes several components:
1. There is no adjacent public water system for interconnection. Water can be trucked from the nearby Fort McCoy public water facilities.
2. The South Post relies on two wells to supply water for the distribution system. If one well becomes unusable due to contamination, it is reasonable to assume that the other well will still be usable.
3. If Well No. 26 tests positive for bacterial contamination, permanent chlorination equipment is provided at the pumphouse.
Key coordinators and contacts for implementing the contingency plan are listed below:
Wisconsin Department of Natural Resources Contact: Alex Avalos Phone: 608-790-5907
Fort McCoy Water and Wastewater Branch Chief Contact: Michael Miller Phone: 608-388-6546
Wisconsin Rural Water Association Phone: 715-344-7778
10.0 Management Plan
NR811.12(6)(i)
10.1 Wellhead Protection Area
A condition of the WDNR approval of the site for Well No. 26 is the designation of a 100-foot by 100-foot area, centered on the well, as the well site parcel. Fort McCoy will make this designation on its internal mapping and preserve the site for Well No. 26.
10.2 Separation Distances
For Well No. 26, the following minimum separation distances as specified in Wis. Adm. Code
s. NR811.12(5)(d) shall be maintained under the Management Plan:
1. Ten feet between a well and an emergency or standby power system that is operated by the same facility which operates the well and that has a double wall above ground storage tank with continuous electronic interstitial leakage monitoring.
2. Fifty feet between a well and a storm sewer main or a sanitary sewer main where the sanitary sewer main is constructed of water main class materials and joints.
3. Two hundred feet between a well and any sanitary sewer main not constructed of water main class materials, sanitary sewer manhole, lift station, one or 2 family residential heating fuel oil underground storage tank or above ground storage tank or POWTS treatment tank or holding tank component and associated piping.
Wellhead Protection Plan Page 5
4. Three hundred feet between a well and any farm underground storage tank system or other underground storage tank system with double wall and with electronic interstitial monitoring for the system, which means the tank and any piping connected to it. These installations shall meet the most restrictive installation requirements of Wis. Adm.
Code s. SPS 310.260 and receive written approval from the department of safety and professional services or its designated Local Program Operator under Wis. Adm.
Code s. SPS 310.110 These requirements apply to tanks containing gasoline, diesel, bio-diesel, ethanol, other alternative fuel, fuel oil, petroleum product, motor fuel, burner fuel, lubricant, waste oil, or hazardous substances.
5. Three hundred feet between a well and any farm above ground storage tank with double wall, or single wall tank with other secondary containment and under a canopy; other above ground storage tank system with double wall, or single wall tank with secondary containment and under a canopy and with electronic interstitial monitoring for a double wall tank or electronic leakage monitoring for a single wall tank secondary containment structure. These installations shall meet the most restrictive installation requirements of Wis. Adm.
Code s. SPS 310.260 and receive written approval from the department of safety and professional services or its designated Local Program Operator under Wis. Adm.
Code s. SPS 310.110. These requirements apply to tanks containing gasoline, diesel, bio-diesel, ethanol, other alternative fuel, fuel oil, petroleum product, motor fuel, burner fuel, lubricant, waste oil, or hazardous substances.
6. Four hundred feet between a well and a septic tank or soil adsorption unit with a design capacity of less than 12,000 gallons per day, a cemetery or a storm water retention or detention pond.
7. Six hundred feet between a well and any farm underground storage tank system or other underground storage tank system with double wall and with electronic interstitial monitoring for the system, which means the tank and any piping connected to it; any farm above ground storage tank with double wall, or single wall tank with other secondary containment and under a canopy or other above ground storage tank system with double wall, or single wall tank with secondary containment and under a canopy; and with electronic interstitial monitoring for a double wall tank or electronic leakage monitoring for a single wall tank secondary containment structure. These installations shall meet the standard double wall tank or single wall tank secondary containment installation requirements of Wis. Adm. Code s. SPS
310.260 and receive written approval from the department of safety and professional services or its designated Local Program Operator under Wis. Adm. Code s. SPS 310.110. These requirements apply to tanks containing gasoline, diesel, bio-diesel, ethanol, other alternative fuel, fuel oil, petroleum product, motor fuel, burner fuel, lubricant, waste oil, or hazardous substances.
8. One thousand feet between a well and land application of municipal, commercial, or industrial waste; the boundaries of a landspreading facility for spreading of petroleum-contaminated soil regulated under Wis. Adm. Code ch. NR 718 while that facility is in operation; agricultural, industrial, commercial or municipal waste water treatment plant treatment units, lagoons, or storage structures; manure stacks or storage structures; or POWTS dispersal component with a design capacity of 12,000 gallons per day or more.
9. Twelve hundred feet between a well and any solid waste storage, transportation, transfer, incineration, air curtain destructor, processing, wood burning, one time disposal or small demolition facility; sanitary landfill; any property with residual groundwater contamination that exceeds Wis. Adm. Code ch. NR 140 enforcement standards; coal storage area; salt or
Wellhead Protection Plan Page 6 https://docs.legis.wisconsin.gov/document/administrativecode/ATCP%2093.260 https://docs.legis.wisconsin.gov/document/administrativecode/ATCP%2093.260 https://docs.legis.wisconsin.gov/document/administrativecode/ATCP%2093.110 https://docs.legis.wisconsin.gov/document/administrativecode/ch.%20NR%20718 https://docs.legis.wisconsin.gov/document/administrativecode/ch.%20NR%20140 deicing material storage area; any single wall farm underground storage tank or single wall farm above ground storage tank or other single wall underground storage tank or above ground storage tank that has or has not received written approval from the department of safety and professional services or its designated Local Program Operator under Wis. Adm.
Code s. SPS 310.110 for a single wall tank installation. These requirements apply to tanks containing gasoline, diesel, bio-diesel, ethanol, other alternative fuel, fuel oil, petroleum product, motor fuel, burner fuel, lubricant, waste oil, or hazardous substances; and bulk pesticide or fertilizer handling or storage facilities.
Wellhead Protection Plan Page 7 https://docs.legis.wisconsin.gov/document/administrativecode/ATCP%2093.110
List of Figures Figure 1 – Groundwater Flow Direction
Figure 2 – Wellhead Protection Area
WELL
NO. 26
SW-A
SW-21
PROJECT LOCATION
State of Wisconsin Monroe County
WATER SYSTEM EVALUATION
Fort McCoy, Wisconsin
Figure
SOUTH POST
WELLHEAD
PROTECTION
AREA
1 inch = 1,000 feet
0 1,000 2,000500
Feet
8/1/2011 By: JLA
Legend:
Domestic Water Wells
Well Buffer Area (.5 Mi)
Fort McCoy Usage Area
Existing Contours Index Contour (50m)
Water Well Recharge Area Capture time
90 days
5 yrs
15 yrs
SOURCE: Monroe Co., WI DNR, ESRI, Ft. McCoy swojtkiewicz Oval swojtkiewicz Oval swojtkiewicz Callout Well No. 26 WHPA 1200' radius of well swojtkiewicz Text Box
0 1,000 2,000 FeetI
| WHPP Ft McCoy Well 26 |
| Mr. Norm Hahn |
| Wisconsin Department of Natural Resources |
| P.O. Box 7911 |
| Madison, WI 53707 |
| Sincerely, |
| Identification of zone of influence |
| Identification of recharge area |
| Identification of groundwater flow direction |
| Identification and assessment of potential contamination sources |
| Establishment of a wellhead protection area (WHPA) |
| Public education program for wellhead protection |
| Water conservation program |
| Contingency plan |
| Management plan |
| 2.0 Background |
| Table 1 |
| Well No. 26 Geologic Formations |
| Figure 1 – Groundwater Flow Direction |
| Figure 2 – Wellhead Protection Area |
| Appendix A |
| Appendix B |
| Appendix C |
| Figure 1 - Pages from Well Site Investigation Report - Fort McCoy |
| Figure 2 - South Post Wellhead Protection Area |
| App A - WCR |
| App B - Calcs |
| ZOI & Recharge Well 26 - 1 |
| ZOI & Recharge Well 26 - 2 |
| ZOI & Recharge Well 26 - 3 |
| App C - Potential Contaminant Sources |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
File details come from the government source that posted it. Updated .