Section SF 1449 - CONTINUATION SHEET
SUPPLEMENTAL INFORMATION
1. An Award for this requirement will be made pursuant to FAR 13.5, Simplified Procedures for Certain Commercial Items.
2. The period of performance is anticipated to be March 01, 2022 to February 28, 2023 (or subsequent date), with four (4) one (1) year options periods, and a six (6) month option to extend services.
3. Quotes shall be emailed to carlos.f.saldarriaga.civ@army.mil. Quotes are due to the Government on or before the time listed above in central time. It is the contractor’s responsibility to ensure their quote is received by the due date and time. As an Addendum to FAR 52.212-1, contractor shall submit all items in accordance with the Supplemental Information by the solicitation closing date and time. Contractor shall submit a signed SF 1449, completed information from the supplemental section and a completed Price Schedule.
4. If a quote is based on a teaming/partnering relationship or a joint venture, the contractor shall provide, with the quote, all required solicitation information for all parties including a copy of the teaming/partnering or joint venture agreement. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering or joint venture relationship.
5. This procurement is Set Aside as 100% Service Disabled Veteran Owned small business NAICS Code 561710 with a size standard of $12 Million.
6. Period for acceptance of quotes. The contractor agrees to hold the prices in its quote firm for 90 calendar days from the date specified for receipt of quotes.
7. Site visit: ***A site visit will be held Friday, February 18, 2022 at 0900AM (CST) beginning at:
TX114 Grand Prairie Complex 397 Armed Forces Dr Grand Prairie, TX 75051
TX068 Seagoville ARC/BMA 5-1 701 Simmonds RD Seagoville, TX 75159
The POC for the solicitation is Carlos F. Saldarriaga, phone: (608) 388-4980, carlos.f.saldarriaga.civ@army.mil
For Site Visit information, see Site Visit clause 52.237-1. Unless you already have a permanent vehicle pass, you will be required to obtain a one-day vehicle pass. You will be required to present the following information: (1) vehicle registration, (2) valid driver’s license, (3) or car rental agreement (if applicable). Attendees at the pre-proposal conference/site visit are cautioned that the Government will not wait for anyone who is late or lost and will not hold another pre-proposal conference/site visit. Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a formal written amendment issued by the Fort McCoy Contracting Office.
8. Written questions must be furnished to the Government no later 18 February 2022@ 4:00pm local time; in order to ensure a timely response is provided by the solicitation closing date. All questions are to be submitted in writing at the time indicated in the solicitation or they may not be addressed before solicitation closing date; therefore, contractors are advised to submit questions as soon as possible. Please provide your company name, telephone, point of contact, e-mail address, and solicitation number on all questions. The Government will respond to questions via the issuance of an amendment which incorporates the question and the Government’s response.
9. DUNS NUMBER ______________________________.
10. TAXPAYER ID #______________________________.
11. CAGE CODE __________________________________.
12. This will be a firm fixed price (FFP), Indefinite Delivery/Indefinite Quantity (IDIQ) type contract. That Government reserves the right to order the maximum quantities and is obligated to order only the minimum quantities. It is the unilateral right of the Government to exercise the option year(s) of this contract.
13. The guaranteed minimum is as follows:
The guaranteed minimum for the base year is one month services. There is no minimum guarantee in the option years.
In accordance with FAR clause 52.216-22, "Indefinite Quantity", the quantities specified in the price schedule are estimates only and are not purchased by this contract.
14. SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: An Active SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.
1. A DUNS number is required for SAM registration. If your company does not have a DUNS #, obtain one by calling 800-333-0505.
1. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 561710, or a NAICS of similar business size, under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.
1. If the prospective awardee for this request for quotes is not actively registered in the SAM database by close of solicitation, including NAICS 561710, or a NAICS of similar business size, under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful actively registered contractor.
1. Within the SAM Representations and Certifications, please ensure you company has selected that you wish to bid on, or currently hold Department of Defense (DoD) issued or DoD funded Contracts. The DFARS provisions in SAM must also be completed by solicitation closing date and time.
1. Prospective contractors who have not completed electronic annual representations and certifications at http://www.sam.gov/ in conjunction with required registration in the System for Award Management (SAM) database, shall complete and submit FAR 52.212-3 Alternative 1 Offeror Representations and Certifications - Commercial Items and DFARS Representations and Certifications in SAM to be eligible to receive an award for this solicitation.
15. Contract Administrator: TBD at time of award.
If you have questions pertaining to this contract after contract award (i.e. questions regarding delivery, invoice procedures, etc.), please request assistance from the Contract Administrator. Be sure to include the contract number in your request for assistance. Requesting contract administration assistance from any other individual could result in a delayed response.
16. Contracting Officer: TBD at time of award.
17. Contracting Officer’s Representative (COR): TBD at the time of Award.
18. The Government intends to evaluate quotes and award a contract without discussions. Therefore, the contractor’s initial offer should contain the contractor’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all quotes if such action is in the public interest and waive informalities and minor irregularities in quotes received.
19. Service Contract Reporting (SCR): Contractors will report manpower data relating to the performance of service contracts into the system for Award Management (SAM) (https://sam.gov) consistent with existing service contract reporting requirement under the federal acquisition regulation subpart 4.17- Service Contracts Inventory. SAM will only enable reporting for entities with contract that meet the SCR threshold at FAR 4.1703. As part of its quote, the vendor must include the estimated total cost (if any) incurred to comply with the Service Contract Reporting requirement.
20. Postaward Conference: In the event the Contracting Officer decides to conduct a Postaward Conference in accordance with DFARS 242.5, the awardee will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.
21. ABILITYONE DESIGNATED ITEMS: In accordance with 52.208-9, contractors are referred to the web site of the Committee for Purchase from People Who Are Blind or Severely Disabled, the independent federal agency that administers the AbilityOne (formerly Javits-Wagner-O'Day or JWOD) Program for the lists of designated products and services http://abilityone.gov/procurement_list/product_buy.html
22. In accordance with FAR 52.223-2, Affirmative Procurement of Bio-based Products under Services and Construction Contracts, contractors are required to submit annual bio-based reports to the reporting module in the System for Award Management (SAM) at https://www.sam.gov.
23. The “Equal Employment Opportunity Is The Law” notice (poster) referenced in FAR Clause 52.222-26(b)(3), is located at http://www.dol.gov/ofccp/regs/compliance/posters/pdf/eeopost.pdf .
24. In accordance with FAR Clause 52.222-41(g), the contractor must notify each service employee working on this contract of the minimum wage and fringe benefits required to be paid pursuant to this contract, or shall post a copy of the wage determination and Department of Labor Form WH-1313 in a prominent place at the worksite. The applicable wage determination is incorporated into the contract. The WH-1313 poster is located at http://www.dol.gov/whd/regs/compliance/posters/sca.htm.
25. In accordance with FAR 52.222-42, In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5 332.
This Statement is for Information Only. It is not a Wage Determination.
| Employee Class |
| Monetary Wage -- Fringe Benefits |
| Pest Controller |
| WG-7 |
26. Required insurance:
In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.
| Workmen’s Compensation |
| As required by state laws |
| Employer’s Liability Insurance |
| $100,000 per accident |
| General Liability Insurance - Bodily Injury Liability |
| $500,000 per occurrence |
| Auto Liability Insurance |
| $200,000 per person |
| Bodily Injury |
| $500,000 per occurrence |
| Property Damage |
| $20,000 per occurrence |
Within ten (10) calendar days after contract award, the Contractor shall certify to the Contracting Officer, in writing, that the required insurance has been obtained.
27. Legal compliance: The Contractor shall comply with all Federal, State, and Local Laws, codes and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with said compliance.
28. Contract performance:
Purpose. IAW with FAR Subpart 42.1500 contractor past performance information (PPI) is relevant information for future source selection purposes regarding a contractor’s actions under previously awarded contracts. It includes, for example, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; and generally, the contractor's business-like concern for the interest of the customer. Contractor past performance information is one of the tools that support Army efforts to acquire best value and is used to evaluate performance risk in source selection. The feedback provided by the government to the contractor in collecting PPI, and the knowledge that PPI will be used in future source selection decisions, should result in improved performance and a greater contractor focus on customer satisfaction.
Contractor Performance Assessment Reports System (CPARS): CPARS shall be prepared IAW AFARS Subpart 42 upon physical completion of the contract. If the period of performance will exceed 18 months, an “interim” assessment report shall be prepared at the completion of 12 months performance and annually thereafter until the contract is physically complete. An out-of-cycle or “addendum” report may be prepared if there is a need to record an extraordinary event prior to the next regularly scheduled evaluation or if it is necessary to report a meaningful occurrence during the period between physical completion of the contract and contract closeout. Additionally, addendum reports may be prepared to record contractor’s performance relative to contract closeout and other administrative requirements (e.g. final indirect cost proposals, technical data, etc.).
Completion Due Date. The government will complete the CPARS within 60 days after the end of the assessment rating period (if applicable).
Evaluators. The Contracting Officer and the Contracting Officer’s Representative will jointly complete the performance assessment.
Contracts Performance Elements. The contractor’s performance shall be assessed in accordance with elements and rating system set forth in AFARS Subpart 42.
Contractor Review. The Contracting Officer will furnish a copy of the CPARS to the contractor requesting that the contractor submit comments, rebutting statements, and/or additional information to the Contracting Officer within 30 calendar days of receipt. Failure to respond within the designated timeframe will be taken as agreement with the assessment.
Contract Concurrence. Where a contractor concurs with, or takes no exception to a CPARS, such report shall be considered final and releasable for use in source selection and other deliberative purposes.
Contractor Rebuttal. Where a contractor takes exception to a performance report, the Contracting Officer will review the contractor’s rebuttal or comments and make appropriate changes. If the Contracting Officer makes changes, the changed rating will be reflected in the narrative. The Contracting Officer will make all reasonable efforts to reconcile the report and the contractor’s comments. However, it is not necessary that they reach agreement on the report where such is clearly impracticable. The contractor’s rebuttal or comments shall be made part of the CPARS.
Resolving Disagreements between the Government and the Contractor. In the event disagreements between the parties regarding the CPARS occur, the Contracting Officer will review the rebuttal and make appropriate changes. If no agreement is reached, the CPARS is forwarded to the Reviewing Official (Director of Contracting) along with the Contracting Officer’s Findings and Recommendation and supporting documentation. The decision of the Reviewing Official is final. Copies of the CPARS and the contractor’s response and review comments, if any, shall be retained as part of the evaluation.
Release of Contractor Performance Evaluation Information. The evaluation will not be released to other than government personnel and the contractor whose performance is evaluated. The performance evaluation information will be input into the applicable module within Contractor Performance Assessment Reporting System (CPARS) database (or Government system in use at time of the evaluation).
Source Selection Information. Departments and agencies will electronically access the CPARS information to support future award decisions.
29. Alternate disputes resolution: In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, Subparagraph (d) (2) (1) (B) (2), the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable, in accordance with the authority and requirements of the ADR Act.
PWS
PERFORMANCE WORK STATEMENT (PWS)
Pest Control Services for Various USAR Facilities in East Texas
PART 1
GENERAL INFORMATION
1. General: This is a non-personal services contract to provide pest control services for the following facilities:
TX068 Seagoville ARC/BMA 5-1 - 701 Simmonds Rd, Seagoville, TX 75159-3201 TX114 Grand Prairie Reserve Complex – 397 Armed Forces Dr, Grand Prairie, TX 75051-2473 TX133 RRAD ARC/AMSA 9 – Building 308, Hooks, TX 75561-0579 TX184 COL James L. Stone ARC – 11280 White Settlement Rd, Fort Worth, TX 76108 TX187 Amarillo AFRC – 4511 NE 24th Ave, Amarillo, TX 79107 TX189 Lewisville AFRC – 1860 Summit Ave, Lewisville, TX 75077 TX190 Denton ARC – 3250 Jim Christal Rd, Denton, TX 76207-2602 TX195 Huntsville AFRC – 1901 Veterans Memorial Parkway, Huntsville, TX 77067 TX196 Tyler AFRC – 13592 State Highway 31 West, Tyler, TX 75709 TX202 Red River AD AFRC – 1146 HWY 82 East, New Boston, TX 75570 TX209 Lufkin AFRC – 4201 N Medford Dr, Lufkin, TX 75901 TX213 Bryan ARC/BMA 26-1 – 2350 N Harvey Mitchell Parkway, Bryan, TX 77807
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision and other items and non-personal services necessary to perform Pest Control Services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: The USARMY Reserve strives to maintain their facilities at a level that will give an outstanding initial impression to Military personnel, civilian employees, visitors and the surrounding community.
1.3 Objectives: The objective of this requirement is for the contractor to perform pest control services.
1.4 Scope: The Contractor shall provide pest control services in accordance with the terms, conditions and standards contained herein. All area measurements provided by the Government are estimates only. The Contractor shall be responsible for verifying all measurements and square footage provided on plans and task listings.
1.5 Period of Performance: The period of performance shall be for 1 Base Period, 4 - 12 month option periods, and an optional 6 month extension if needed.
1.6 General Information
1.6.1 Quality Control: Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1, Contractor Inspection Requirements). The Contractor shall develop, implement and maintain an effective Quality Control System, which includes a written Quality Control Plan (QCP). The QCP shall implement standardized procedure/methodology for monitoring and documenting contract performance to ensure all contract requirements are met. The Contractors’ QCP must contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the Government. The QCP as a minimum shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints. The contractor shall upon request provide to the Government their quality control documentation. The Contractor shall provide the QCP within 30 calendar days of contract award and 15 calendar days of any change.
1.6.1.1 Quality Control Plan: The QCP is developed by the Contractor to validate it performs and delivers high- quality service and products (see Federal Acquisition Regulation (FAR) Part 46.105 and 52.246-1, Contractor Inspection Requirements). The Contractor shall submit their QCP to the COR no later than 30 calendar days after award for COR review and approval. Any changes to the QCP shall be approved by the COR prior to implementation. It is the Contractor’s responsibility to update based on the required information of the QCP. The QCP shall include, but not be limited to the following:
a. The name(s) of the individual(s) who will perform the inspection.
b. An inspection system covering the services stated in the contract comprised of a checklist used in inspecting contract performance during regularly scheduled or unscheduled inspections.
c. The checklist shall include every area of the operation serviced by the contractor as well as every task required to be performed.
d. A system for identifying and correcting deficiencies in the quality of services before the level of performance becomes unacceptable.
e. A file of all inspections conducted by the contractor and the corrective actions taken. The documentation shall be maintained locally and made available upon request.
f. A service guarantee detailing contractor’s commitment to make all reasonable effort to remedy identified problems to be provided with quality control plan. Any and all remedies shall be performed at no additional cost to the government.
g. How the Contractor shall make available to the Government documentation and records, including internal audit reports, Corrective Action Reports, and Preventive Action Reports that impact the quality of products or services offered.
h. Method used to ensure service deficiencies are not repetitive in nature (e.g., root cause identified and corrected, and problem does not reoccur).
i. Methods and procedures of making sure the key control and lock combinations are properly accounted for and securely handled by authorized personnel.
j. Customer complaint program: system for identification and correction of validated complaints and to provide feedback to the COR and customer of corrective actions taken.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a Government only document primarily focused on what the Government must do to assure that the contractor has performed in accordance with the requirements of the contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. Non-conforming services shall be re-performed at no increase in contract price. If non-conforming services are recurring, cannot be re-performed, or the services fail to achieve the Performance Requirements Summary (PRS) acceptable quality level (AQL) (see A.1.), the Government may reject the nonconforming service(s) and document the contractor’s performance record accordingly. The Government may also issue a Non-Conformance Report (NCR) in which the contractor will be required to respond with the development of a Corrective Action Plan (CAP) which identifies the root cause, corrective action (CA) for the root cause, CA for the specific nonconformance, and the date the CAs will be complete. The Government may also reduce the payment to the contractor IAW the PRS, or reduce payment to reflect the value of the services performed, or may perform the services and charge the Contractor for any related cost incurred, or may terminate this contract for default.
1.6.2.1 Nonconforming Supplies or Services: When a Contractor’s performance does not meet Contract requirements and/or approved work schedules and/or timeframes it is considered a nonconformance. Nonconformance shall be classified in one of three categories: level I (Minor), level II (Major) or level III (Critical). The Government may re-inspect work designated for re-performance or late performance, and the Contractor may be held liable for any damages sustained by the Government including, for example, the costs associated with re-inspection.
1.6.2.1.1 Level I (Minor) non-conformance: is defined as a non-conformance that is not likely to materially reduce the usability of the supplies or services for their intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the supplies or services. Minor non-conformance usually can be corrected on the spot, where no further corrective action (CA) response is necessary, and can be issued by the COR to the contractor either through a verbal or written non-conformance report. Minor non-conforming services shall be re-performed within a specified time frame at no increase in contract price. If minor non-conformances are recurring or re-performance is not completed in full and within the specified time a Level II non-conformance may be issued to the contractor by the Contracting Officer (KO).
1.6.2.1.2 Level II (Major) non-conformance: is defined as a non-conformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose. Recurring Minor non-conformances, or a non-responsive contractor, indicating a trend or failure of the contractor’s quality control, can also be classified as a Major non-conformance. Major non-conformance’s shall result in the issuance of a written NCR from the KO to the contractor requiring the development of a CAP by the contractor which identifies the root cause, CA for the root cause, CA for the specific non-conformance and the date CAs will be completed.
1.6.2.1.3 Level III (Critical) non-conformance: is defined as a non-conformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services; is likely to prevent performance of a vital agency mission; is for a repeated or uncorrected level II NCRs; or is for a non-responsive contractor to a level II NCR. Critical non-conformances shall result in the issuance of a written NCR to the contractor requiring the development of a CAP by the contractor which identifies the root cause, CA for the root cause, CA for the specific non-conformance and the date CAs will be completed.
1.6.2.1.4 The contractor will be notified of Government inspection results. The contractor shall acknowledge receipt of the inspection results. The contractor may be notified of inspection results verbally. Verbal notifications of defective work will be confirmed in writing. When Government inspectors are unable to contact the contractor to notify the contractor of inspection results, acceptance or rejection of work will be made on the basis of the initial inspection.
1.6.2.1.5 Performance Evaluation Meetings; the Project Manager shall meet with the COR prior to start of the contract. However, meetings will be held whenever deficiencies are noted by the COR. A mutual effort will be made to resolve all problems identified.
1.6.3 Federal Government Holidays: Facilities will be closed on Federal Holidays and on training holidays as announced by the Chain of Command or President. If a Holiday falls on a regular work day, the services shall be rescheduled in the same week to either the day preceding or following the Holiday. If these Holidays fall on Saturday, the preceding Friday will be observed. If these Holidays fall on Sunday, the following Monday will be observed. The scheduled holidays are:
| New Year’s Day | 1st day of January | ||||
| Martin Luther King Jr.’s Birthday | 3rd Monday of January | ||||
| Presidents Day | 3rd Monday of February | ||||
| Memorial Day | Last Monday of May | ||||
| Juneteenth National Independence Day | 19th day of June | ||||
| Independence Day | 4th day of July | ||||
| Labor Day | 1st Monday in September | ||||
| Columbus Day | 2nd Monday of October | ||||
| Veterans Day | 11th Day of November | ||||
| Thanksgiving Day | 4th Thursday of November | ||||
| Christmas Day | 25th day of December |
1.6.3.1 Unforeseen Installation Closures: meaning when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Contractor will be notified by the COR of an installation closure. The contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Government shall have the following options:
a. To require the Contractor to perform the work on the following day unless the following day is a Saturday or Sunday and routine work is not scheduled for Saturday or Sunday.
b. To reschedule the work on any day satisfactory to both parties.
c. Forego the work and reduce the contract price to reflect the reduced value of the services performed.
1.6.4 Hours of Operation: The Contractor is responsible for conducting business between the hours of 8:00 am and 4:00 pm (0800-1600) Monday thru Friday except for Federal Holidays as listed in 1.6.3 or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.6.4.1 The contractor shall perform routine pest control services that do not adversely affect occupant health or productivity during normal working hours of operation in the buildings.
1.6.4.2 When it is necessary to perform work outside of the regularly scheduled hours set forth in the IPMP, the contractor shall notify the COR and Alternate Government POC at least one (1) day in advance.
1.6.5 The Government expects to award a Firm Fixed Price (FFP) Contract for the services outlined in this PWS.
1.6.6 Security Requirements: Contracted personnel (to include subcontractors) performing work under this contract must have a favorable national agency investigation at the time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached Blanket OPSEC Review Cover Sheet.
1.6.6.1 Physical Security: The Contractor shall be responsible for safeguarding all Government Furnished Equipment (GFE), information and property provided for use in performing the requirements of this PWS.
1.6.6.2 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued by the Government to the Contractor as not lost, misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of an issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicated keys to the Contracting Officer.
1.6.6.2.1 The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit the entrance of persons other than Contractor employees engaged as described in this PWS or as authorized entrance by the Contracting Officer.
1.6.6.3 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that a lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.
1.6.7 Special Qualifications: The Contractor shall provide pesticide applicators certified and licensed by Federal, State and local regulations as applicable, in the category of pest control in which they are performing and/or applying pesticides. Contractor pesticide applicators shall maintain a current copy of their certification in their possession at all times while conducting pest control operations. Prior to commencement of work, the Contractor shall provide the COR or Contracting Officer with a copy of the Contractor’s license; State certification for each Contractor employee performing pest management services under this contract. The Contractor will submit updates, as necessary. The copy of State certification provided will contain, at the minimum, the following information; licensee’s full name, license/certification number, pest control categories, and license/certification expiration date.
1.6.8 Anti-Terrorism Program:
1.6.8.1 The Contractor shall allow the Government to conduct periodic inspections to ensure adherence to access control procedures in accordance with DFARS 252.204-7004 Antiterrorism Awareness Training for Contractors -Level I Antiterrorism Awareness Training for Contractors (FEB 2019).
1.6.8.2 AT Training Qualifications: AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR within 30 calendar days of contract award and within 45 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://atlevel1.dtic.mil/at.
1.6.8.3 iWATCH Training: The Contractor and all associated Subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Anti-terrorism Officer (ATO)). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. The Contractor shall coordinate with the COR to get the current copy of this training within 30 calendar days upon award and within 5 calendar days after completion of training/NLT 30 days after contact award. New employees shall complete the training within 30 calendar days of commencing performance.
1.6.8.4 iWATCH is simply common awareness. Contract employees can be good sources of information. iWATCH training would include organization instructions on “things to look for” and a phone number to call in case the contract employees have information regarding possible terrorist or criminal activities. Providing Contractors with awareness materials such as the iWATCH brochure or wallet cards is a cost effective alternative to training. The card describes suspicious activity and can be modified to include the COR in reporting procedures. Samples of the iWATCH brochure and posters are available on the Anti-terrorism Enterprise Portal (AETP) at https://army.deps.mil/army/sites/PMG/prog/ATEP/iWATCH%20Army/Forms/AllItems.aspx and https://www.army.mil/e2/c/downloads/287489.pdf.
1.6.8.5 Activity Regulations for Contractor Access and Use of Premises
1. Follow all current Army Security Regulations concerning strict visitor control and preservation of all Government assets. Immediately report all security concerns to the COR, who will notify the Security Office.
2. The Contractor shall adhere to requirements as directed in Federal Acquisition Regulation – 52.222-54; Employment Eligibility Verification. Contractors shall be enrolled in the Department of Homeland Security E-Verify Program. Information on registration for and use of the E-Verify program can be obtained via the Internet at the Department of Homeland Security Web site: http://www.dhs.gov/E-Verify.
3. The Contractor shall ensure that its employees entering Army-controlled installations or facilities have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of contracted services.
4. The Contractor shall comply with all personnel identity verification procedures. Employees must be accompanied by an authorized Government employee at all times while providing services in secure areas.
5. During Force Protection Conditions (FPCON) Charlie and Delta, services are discontinued and services shall resume when the FPCON level is reduced to level Bravo or lower.
1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.10 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR or any persons other than the KO do not have the authority to change any of the terms and conditions of the resulting order.
1.6.11 Key Government Personnel information will be provided during the Post Award Kick-Off meeting.
1.6.12 Key Contractor Personnel and Contract Management: The following personnel are considered key personnel by the Government: designated Point of Contact (POC) and an alternate POC. The Contractor shall provide a designated POC and an alternate, who shall be responsible for the competent performance of the work required under the specifications of this contract NLT 5 business days after contract award and as changes occur. The name and contact information of the POC and an alternate, who shall act for the contractor when the POC is absent, shall be designated in writing to the COR. The POC or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The POC or alternate shall be available between 7:30 a.m. to 4:00 p.m. Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. The POC(s) and alternates shall be able to read, write, speak, and understand English.
1.6.12.1 Management Plan: The Contractor shall submit a Management Plan within 30 calendar days of contract award, which shall demonstrate a thorough knowledge and a full understanding of the complexity and functions detailed in the PWS and how staffing will be provided to complete the tasks. It shall provide a sound management approach for responding to changing priorities, enhancing customer service, providing adequate staff for a geographically dispersed requirement while ensuring adequate levels of performance are maintained. The Contractor shall implement the plan within 15 calendar days of management plan acceptance by the COR. Any changes to the Contractors Management Plan shall be submitted to the COR within 15 calendar days for review and approval.
1.6.12.2 Identification of Contractor Employees: The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a color photo of the employee. ID Badges for Key Contractor Personnel shall also indicate their job title. ID Badges shall be worn at all times while the employee is performing under this contract. Each Contractor (to include subcontractors) shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued ID Badges shall be provided to the COR within 5 days of contract award and updated as needed to reflect Contractor and Subcontractor personnel changes. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.13 Supervision of Contractor Employees: The Government will not exercise any supervisor or control over Contractor or Subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or Subcontractor employees.
1.6.14 Data Rights: The Government has unlimited rights to all documents/material produced in the execution of this PWS. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges or ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without prior written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.6.15 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interest (OCI) as defined in FAR Subpart 9.5. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as they deem necessary, including prohibiting the Contractor from participating in subsequent contracted requirements which may be affected by the OCI.
1.7 Approved CPMR and SDS: The Contractor shall provide the COR with a list of pesticides, herbicides, fungicides and any other chemicals to be used in the performance of this contract with Safety Data Sheets (SDS). The contractor shall provide the list of chemicals and SDS within 10 business days of contract award. After award, the Contractor shall report any additional or deletion of chemicals to the COR within 72 hours of the anticipated change for approval. The Government has provided a list of approved products to be used in the execution of this PWS (Attachment 6 Pesticide Use List 63d RD). The Contractor is not authorized to deviate from this approved list without prior approval from the Contracting Officer.
1.8 Adding and Removing Sites: The Government reserves the right to add newly constructed or acquired sites and remove any site planned for divestiture or deemed necessary for closure from this contract. This will be completed via formal contract modification.
1.9 Reduction or Increase of Services: The Government reserves the right to reduce or increase the frequency of services needed at will depending upon need and percentage of occupancy of each building or facility.
PART 2
DEFINITIONS AND ACRONYMS
2.1 Definitions:
2.1.1 Contract Administrator: The official Government representative delegated authority by the Contracting officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.
2.1.2 Contractor: A supplier or vendor awarded a contract to provide specific supplies or services to the Government. The term used in this document refers to the prime vendor.
2.1.3 Contracting Officer (KO): A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the Government.
Note: This is the only individual who can legally bind the Government.
2.1.4 Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the KO to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.5 Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.6 Deliverable: Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.7 Government Furnished Property (GFP) or Government Property (GP): Property in the possession of, or directly acquired by the Government and subsequently made available to the Contractor.
2.1.8 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.9 Physical Security: Actions that prevent the loss or damage of Government property or data.
2.1.10 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are acceptable in accordance with established standards and requirements of this contract.
2.1.11 Quality Assurance Specialist: An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Process. Acts as technical advisor to the Contracting Officer in the areas of Quality Assurance and Quality Control.
2.1.12 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used performing surveillance of the contractors’ performance.
2.1.13 Quality Control: All necessary measures taken by the Contractor to validate that the quality of services provided meet the contractual requirements.
2.1.14 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.15 Workday: The number of hours per day the Contractor provides services in accordance with the contract.
2.1.16 Work Week: Monday through Friday, except for Federal holiday as specified in para 1.6.3 of this PWS.
2.2 Acronyms:
| ACOR | Alternate Contracting Officer's Representative | |||
| AFARS | Army Federal Acquisition Regulation Supplement | |||
| AFOS | Area Facility Operations Specialist | |||
| AQL | Acceptable Quality Level | |||
| AR | Army Regulation | |||
| AT | Anti-Terrorism | |||
| CA | Corrective Action | |||
| CAP | Corrective Action Plan | |||
| CFR | Code of Federal Regulations | |||
| CONUS | Continental United States (excludes Alaska and Hawaii) | |||
| COR | Contracting Officer Representative | |||
| COTR | Contracting Officer's Technical Representative | |||
| COTS | Commercial-Off-the-Shelf | |||
| CPMR | Contracted Pest Management Record | |||
| DA | Department of the Army | |||
| DD250 | Department of Defense Form 250 (Receiving Report) | |||
| DD254 | Department of Defense Contract Security Requirement List | |||
| DFARS | Defense Federal Acquisition Regulation Supplement | |||
| DMDC | Defense Manpower Data Center | |||
| DOD | Department of Defense |