Industry Questions.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Relocatable Buildings Demolition Debris Federal contract opportunity
- Solicitation number
- W911S8-22-Q-0018
About this file
This document contains questions and answers related to a solicitation for hauling and disposal of demolition debris from relocatable buildings located on Joint Base Lewis-McChord. The contractor will be required to haul demolition debris from twenty-eight relocatable buildings, ranging in size from 433 to 2,640 square feet, to a permitted disposal or recycling facility. The buildings will be demolished in groups of one to six structures. Estimated quantities of material to be generated from each building are provided in Technical Exhibit 2. The contractor must provide all necessary personnel, equipment, transportation, and other items to prepare and containerize the debris according to the requirements of the receiving facilities. Questions from industry were answered to clarify details such as hazardous material surveys conducted, estimated container sizes, concurrent demolition schedules, and confirmation that no site visit would be provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 01 WD 5539 15 Mar 2022 Pierce County.pdf | ||
| W911S8-22-Q-0018 Amendment 0001.pdf | ||
| W911S8-22-Q-0018.pdf | ||
| PWS RLB Demolition Debris.pdf | ||
| TE-02 Identified Relocatable Buildings.xlsx | XLSX spreadsheet | |
| TE-01 Relocatable Buildings Maps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Indusrty Questions | Answers |
| Recycle centers require a Hazardous Building Material Survey for the debris before they will accept it for recycle. Are HBMS available for the structures being demolished? | Yes. There has been a hazardous materials surveys conducted on each building scheduled for demolition which will be provided to the hauler. All hazardous materials identified will be removed prior to demolition, no asbestos or lead was identified. |
| For Items 0001, 0002 and 0006 no container size provided. Gondola trailers can be provided in sizes ranging from 60 CY to over 120 CY. Same with “Drop Box” can be 4 CY up to 60 CY. Without sizing how are bids going to be compared for smaller or larger haul units? | Estimated haul quantities were based on the following sizes. |
Gondola - 133cy Mixed Material Drop Box - 40cy Metal Drop Box - 40cy Concrete Drop Box - 10cy (due to load weight) TE-02 contains the estimated tons to be generated per building. Contractors are to provide containers of sufficient size to haul the material within the quantity of hauls identified.
| Items 0003 and 0004, most recycle facilities have sizing requirements, such as max piece size under 18” and all metal cut flush on the concrete. Is the material going to be prepared to the requirements of the recycle facility or is secondary processing have to be figured in? | The material will be prepared to the requirements of the recycle facility prior to being placed into a container. |
| 0001 Gondola trailers, are they going to be live loaded or dropped? | Dropped |
| Can the due date be extended beyond the 15th? | Due date has been extended to 18 July 2022 at 12:00 PM PDT |
| Can you confirm that the extent of this project will be hauling away debris and that there is not an additional construction or demolition requirement? | This contract is for hauling only. |
| I am requesting a time extension for the following question if possible. Does the demolition have a specific schedule for all buildings? Or will this be happening concurrent to all locations pertaining to this site list given? Meaning is there a time line to start at each location or will they all start demo at the same time? | The buildings will be demolished in groups. Some groups may be worked on concurrently. |
| Dates of performance are incorrect | Performance dates are correct |
| Liquidated damages are not complete | Liquidated damages were erroneously included |
| DFARS clause that talks about CUI, what does that have to do with the effort? | Clause is required by DoD |
| Can you add the FastPay clause or paid by credit card? | Cannot be paid by credit card. |
| When is this contract intended to start? | Demoltion is currently planned to start on 19 July. |
| What is the wage determination? | Wage Determination is being added as attachment 01 |
| What are liquidated damages? | See answer to question #10 above |
| It lists Control Unclassified Information? Why is this? | Clause is required by DoD |
| Can the job be paid by credit card throughtout the contract with multiple progressive invoices? | Cannot be paid by credit card. |
| Can we come on base and assess the site before submitting a bid? | No site visit is scheduled for this requirement. |
| when is this contract intended to start? | Demoltion is currently planned to start on 19 July. |
| what are the liquidated damages? | See answer to question #10 above |
| is there already a dump/ disposal location, or do we need to secure a location for dumping the debris? | Contract is to haul and dispose of demolition debris |
| is the fast pay or credit card pay available? | Cannot be paid by credit card. |
| what does CUI have to do with the effort? | Clause is required by DoD |
| Will there be a time that we could visit the site? | No site visit is being scheduled for this requirement. |
| Like come out and do a tour.? on our own and look at the project | No site visit is being scheduled for this requirement. |