W911S7-21-B-0001 Asphalt Questions and Answers
1. Does the Contractor have to start work on each issued delivery order in 10 days?
ANSWER: No. Delivery Order schedules are coordinated with DPW and MICC personnel.
2. This is a Total Small Business Set Aside contract with a size standard of $39.5M correct?
ANSWER: YES Total Small Business Set-aside under NAICS 237310 with a size standard of $39.5 million. See Solicitation page 1 block 10 item 2.
3. Are the quantities that are bid in the contract in anyway guaranteed or are they just an estimate based entirely on funding?
ANSWER: No. The quantities in the contract are an estimate.
4. Per the contract clause stating that a contractor wouldn’t be required to fulfill a delivery order of $500.00 or less, does that mean a delivery order as small as $501.00 would have to be fulfilled?
ANSWER: Correct, actually $500.01
5. Will all excess material that is produced during the Excavation Cleanse item still be required to be hauled off post since the dumps are closed?
ANSWER: Yes.
6. Is the contractor financially responsible for all costs for employee training required to work on Fort Leonard Wood, (OPSEC Training, Anti-Terrorism, I-Watch, Access Passes, etc)?
ANSWER: YES
7. Are all traffic control costs as indicated in the solicitation (traffic signage, barricades, flaggers, pilot cars, etc.) incidental?
ANSWER: Yes.