This document contains a federal contract opportunity and related attachment. The federal contract opportunity is a solicitation from the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Leonard Wood for a Job Order Contract (JOC) for construction requirements at Fort Rucker, Alabama. The North American Industry Classification System code is 236220 with a small business size standard of $36.5 million. The applicable Product Service Code is Y1QA. The place of contract performance is Fort Rucker, Alabama. This will be a total HUBZone set-aside. The resulting contract will be a single award firm fixed price indefinite-delivery indefinite-quantity contract. The solicitation number is W911S7-19-R-0009 and proposals are due by March 20, 2019.

The related attachment defines the coefficient used to price individual task orders under the JOC. The contractor's price coefficient must include overhead, profit, insurance, bonding costs, payroll taxes and fringe benefits, sales tax on materials and equipment, waste and excess materials, clean up, mobilization and close out costs, compliance with environmental regulations, traffic control, safety equipment and signage, project management and supervision, working in adverse conditions, handling owner's property, quality control, office expenses, transportation, tools and equipment, portable toilets, meetings, engineering and architectural services, permits and fees, testing and inspections, and other business risks.

Coefficient Worksheet

View the file

Other files

File Type Posted
W911S719R00090002.pdf PDF
Questions_and_Responses_rev._1.pdf PDF
W911S719R00090001.pdf PDF
Questions_and_Responses.pdf PDF
Attachment_1-Fort_Rucker_Statement_of_Work(Final).pdf PDF
Attachment_2-Wage_Determination.pdf PDF
W911S719R0009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

“COEFFICIENT: Means a numerical factor that represents costs (generally indirect costs) not considered to be included in “Construction Task Catalog” unit prices, e.g. general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, sales tax and compliance with tax laws and contractor’s and subcontractor’s profit. Contingent costs, such as labor rate changes and inflation in option years are also covered in the coefficient. Coefficients proposed by offerors are multiplied by the Government-established unit prices in the Construction Task Catalog

(Commonly referred to as a Unit Price Book) to price a job or project on individual task orders.

The Coefficient(s) proposed by the offeror and accepted by the Government are incorporated in

JOC. The contractor’s price coefficient must include, but is not limited to the following:

o Contractor’s overhead and profit o Subcontractors’ overhead and profit o Insurance o All costs associated with bonding (specifically including bond premiums) o Employee payroll taxes, insurance, and fringe benefits o All taxes, contributions, memberships, corporate headquarters support (legal, financial, etc.)

o Sales tax on material and equipment costs o All waste and excess material o Protection of existing surfaces o Daily clean up o Final professional project clean-up.

o Mobilization and close out for the total contract and each task order o Compliance with environmental laws (overhead

[indirect] costs associated with performing work in compliance with EPA/OSHA regulations, including obtaining any necessary licenses and permits, reporting requirements, etc.)

o Traffic and work site signs and barriers o Basic safety and warning signage, minor barricades, tape, etc.

o Project management and supervision o Working in extreme temperatures (below or above normal) or adverse conditions such as excessive rain, wind, sleet or snow o Removing and returning Owner's furniture and furnishings o Quality control o Office management and equipment o Office and management personnel o Office space o Office equipment o Office and management personnel o Office supplies o Employee transportation o Project trailer o Project Equipment & Supplies o Portable toilets for Contractor’s Use o Construction vehicles o Gang boxes and storage containers for

Contractor's tools, equipment and materials.

o Meeting Owner security requirements.

o Personnel safety equipment o Depreciation of mobile office(s) o Interest associated with funding of equipment and payroll o Cost of financing the work o Preparation and modification of sketches, drawings, submittals, as-built drawings, and other project records.

o Incidental engineering and architectural services.

o Permits, licenses, and fees, including Services required to obtain any filings and permits.

o Include testing, calibration, balancing and the like required to ensure proper installation, construction and performance o Other risks of doing business (i.e. risk of a lower than expected contract dollar value, risk of a high inflation cost if factors are bid for option years, risk of poor subcontractor performance and re-performance)