Attachment_8,_QC_Checklist_Niagara_Lonworks.pdf

PDF 78 KB Posted

Attached to
Building 1702 Renovations
Solicitation number
W911S7-19-B-0001
Issued by

View the file

Other files

File Type Posted
Attachment_3,_FLW_Meter_Guidance.pdf PDF
Drawing_C8182.38_Sheet_E3_of_5.pdf PDF
Drawing_C8182.38_Sheet_F1_of_1.pdf PDF
Drawing_C8182.38_Sheet_M9_of_13.pdf PDF
Drawing_C8182.38_Sheet_M8_of_13.pdf PDF
Drawing_C8182.38_Sheet_M11_of_13.pdf PDF
Drawing_C8182.38_Sheet_A6_of_7.pdf PDF
Drawing_C8182.38_Sheet_A5_of_7.pdf PDF
Drawing_C8182.38_Sheet_MI_10_of_12.pdf PDF
Drawing_C8182.38_Sheet_M1_of_13.pdf PDF
Drawing_C8182.38_Sheet_MI_3_of_12.pdf PDF
Drawing_C8182.38_Sheet_E5_of_5.pdf PDF
Drawing_C8182.38_Sheet_M2_of_13.pdf PDF
Drawing_C8182.38_Sheet_MI_9_of_12.pdf PDF
Attachment_4,_FLW_Approved_Instrumentation.pdf PDF
Drawing_C8182.38_Sheet_E4_of_5.pdf PDF
Drawing_C8182.38_Sheet_MI_11_of_12.pdf PDF
Attachment_10,_TAC_vista_201620463.pdf PDF
Drawing_C8182.38_Sheet_M4_of_13.pdf PDF
Attachment_2,_Certificate_of_Networthiness_(CoN).pdf PDF
Drawing_C8182.38_Sheet_MI_8_of_12.pdf PDF
Drawing_C8182.38_Sheet_E1_of_5.pdf PDF
Drawing_C8182.38_Sheet_MI_6_of_12.pdf PDF
Attachment_6,_QC_Checklist_LNS.pdf PDF
Drawing_C8182.38_Sheet_M5_of_13.pdf PDF
Drawing_C8182.38_Sheet_M3_of_13.pdf PDF
Drawing_C8182.38_Sheet_M13_of_13.pdf PDF
W911S7-19-B-0001_Bldg_1702_Renovations.pdf PDF
Drawing_C8182.38_Sheet_A1_of_7.pdf PDF
Drawing_C8182.38_Sheet_A4_of_7.pdf PDF
Drawing_C8182.38_Sheet_MI_4_of_12.pdf PDF
Drawing_C8182.38_Sheet_MI_1_of_12.pdf PDF
Attachment_5,_JACE_(CoN).pdf PDF
Attachment_11,_Temp_IP_Network_Compliance_Statement.pdf PDF
Attachment_7,_LonScanner_20Info.png.pdf PDF
Drawing_C8182.38_Sheet_MI_7_of_12.pdf PDF
Drawing_C8182.38_Sheet_E2_of_5.pdf PDF
Attachment_1_Statement_of_Work,_B1702.pdf PDF
Drawing_C8182.38_Sheet_M6_of_13.pdf PDF
Drawing_C8182.38_Sheet_M7_of_13.pdf PDF
Drawing_C8182.38_Sheet_A7_of_7.pdf PDF
Drawing_C8182.38_Sheet_MI_2_of_12.pdf PDF
Drawing_C8182.38_Sheet_M10_of_13.pdf PDF
Drawing_C8182.38_Sheet_A3_of_7.pdf PDF
Drawing_C8182.38_Sheet_M12_of_13.pdf PDF
Drawing_C8182.38_Sheet_MI_5_of_12.pdf PDF
Drawing_C8182.38_Sheet_MI_12_of_12.pdf PDF
Attachment_9,_Point_Schedule_Lonworks_BACnet_Niagara_2015-07-15.pdf PDF
Drawing_C8182.38_Sheet_A2_of_7.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A

Section 23 09 23 Appendix Page 1

QC CHECKLIST: Niagara Lonworks

This checklist is not all-inclusive of the requirements of this specification and should not be interpreted as such.

This checklist is for (check one:)

Pre-Construction QC Checklist Submittal (Items 1-3)

Post-Construction QC Checklist Submittal (Items 1-10)

Close-out QC Checklist Submittal (Items 1-18)

Initial and date each item in the spaces provided verifying that each requirement has been met.

Items verified for Pre-Construction, Post-Construction and Closeout QC Checklists Submittal:

Item Initial Date

1 All DDC Hardware is numbered on Control System Schematic Drawings.

2 Signal lines on Control System Schematic are labeled with the signal type.

3 Local Display Panel (LDP) Locations are shown on Control System Schematic drawings.

Items verified for Post-Construction and Closeout QC Checklist Submittal:

Item Initial Date

4 All sequences are performed as specified using DDC Hardware.

5 Training schedule and course attendee list has been developed and coordinated with shops and submitted.

6 All DDC Hardware except Niagara Framework Supervisory Gateways is installed on a TP/FT-10 Channel.

7 All Application Specific Controllers (ASCs) are LonMark certified.

8 Except for communication between two Niagara Framework Supervisory Gateways, Communication between DDC Hardware is only via <RID>CEA-709.1-D</RID> using SNVTs. Other protocols have not been used. Network variables other than SNVTs have not been used.

Communication between Niagara Framework Supervisory Gateways is via Fox Protocol.

9 Explicit messaging has not been used.

10 Scheduling is performed in Niagara Framework Supervisory Gateways.

Items verified for Closeout QC Checklists Submittal:

11 Final As-built Drawings, including all Points Schedule drawings, accurately represent the final installed system.

APPENDIX A

Section 23 09 23 Appendix Page 2

Items verified for Closeout QC Checklists Submittal:

12 Programming software has been submitted for all programmable controllers.

13 All software has been licensed to the Government.

14 O&M Instructions have been completed and submitted.

15 Training course has been completed.

16 The database in each Niagara Framework Supervisory Gateway is up-to-date and accurately represents the building control network beneath that Niagara Framework Supervisory Gateway.

17 Niagara Wizards have been submitted for all Application Specific Controllers (ASCs) for which a Wizard is available and for all Application Generic Controllers (AGCs).

18 Programming software has been submitted for all General Purpose Programmable Controllers (GPPCs) and all Application Generic Controllers (AGCs).

(QC Representative Signature) (Date)