PART IV SPECIFICATIONS
REPAIR INTERIOR OF BUILDING 1702
DPW 03596-7J, M.0075377
C8182.38
INDEX
SECTION NO. DESCRIPTION
DIVISION 1 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 33 00 Submittals
DIVISION 2 - SITEWORK
02 41 00 Demolition 02 82 13.00 10 Asbestos Removal
DIVISION 5 - METAL
05 40 00 Cold-Formed Metal Framing
DIVISION 6 – WOOD, PLASTICS, and COMPOSITES 06 61 16 Solid Surface Fabrications
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping 07 92 00 Caulking and Sealants
DIVISION 8 - DOORS AND WINDOWS
08 11 13 Steel Doors and Frames 08 11 16 Aluminum Doors 08 14 00 Wood Doors 08 71 00 Hardware 08 81 00 Glazing
DIVISION 9 - FINISHES
09 29 00 Gypsum Board 09 51 00 Acoustical Ceilings 09 65 00 Resilient Flooring 09 68 00 Carpet 09 90 00 Paints and Coatings
DIVISION 10 – SPECIALITIES
10 14 00.20 Interior Signage 10 28 13 Toilet Accessories
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework
DIVISION 22 – PLUMBING
22 00 00 Plumbing, General Purpose
DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING
23 00 00 Air Supply, Distribution, Ventilation, and Exhaust
Systems 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 00 Thermal Insulation for Mechanical Systems 23 09 00 Instrumentation and Controls for HVAC 23 09 13 Instrumentation and Controls Devises for HVAC 23 09 23.01 Lonworks Direct Digital Control for HVAC and Other
Building Control Systems 23 09 93 Sequences of Operation for HVAC Control 23 21 12.23 20 Medium Temperature Water System Within Buildings 23 21 13.00 20 Low Temperature Water Heating System 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping
Systems
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 Cybersecurity for Facility-Related Control Systems
DIVISION 26 – ELECTRICAL
26 00 00.00 20 Basic Electrical Materials and Methods 26 05 00.00 40 Common Work Results for Electrical 26 20 00 Interior Distribution System 26 27 14.00 20 Electric Meters 26 51 00 Interior Lighting 26 53 00.00 40 Exit Signs
DIVISION 27 – COMMUNICATION
27 10 00 Building Telecommunications Cabling System
DIVISION 33 – UTILITIES
33 12 33.00 30 Water Meters
MECHANICAL CONTROL INFORMATION DOCUMENTS
Attachment 2, EC-gfx Program 6.X.
Attachment 3, FLW Advanced Meter Guidance.
Attachment 4, Fort Leonard Wood List of Approved Instrumentation and Control for HVAC Attachment 5, Jace CON.
Attachment 6, LNS QC Checklist Appendix A.
Attachment 7, LonScanner%20Info.
Attachment 8, Niagara-Lonworks QC Checklist Appendix A.
Attachment 9, Point Schedule Lonworks BACnet Niagara.
Attachment 10, TAC Vista.
Attachment 11, Temp IP Network Compliance Statement.
REPAIR INTERIOR OF BUILDING 1702
DPW 03596-7J, M.0075377
C8182.38
SECTION 01 11 00
SUMMARY OF WORK
1 DESCRIPTION OF WORK:
1.1 Work to be Done: The work consists of furnishing all plant, labor, equipment, supplies, and materials, and performing all work in accordance with these specifications and drawings as indicated at Fort Leonard Wood, Missouri.
1.2 Location: The site of the proposed work is in the Cantonment Area of the Fort Leonard Wood Military Reservation, Fort Leonard Wood, Missouri.
2 PRINCIPAL FEATURES: The work to be performed will include, but not be limited to, the following principal features:
2.1 Demolition of wood framed offices and HVAC/Control systems that are located in the rear bay areas. Demolition of HVAC/Control systems in the administration and mechanical room areas of building 1702.Repair finishes in the administration area of building 1702 and replace HVAC system with associated electrical, communication and fire alarm systems.
2.2 Construct an office, breakroom, conference room, classroom, and restrooms with related HVAC/controls, equipment foundation pad outside on grade, ADA access, fire sprinkler system modifications and Electrical work in the west side of the rear Bay area.
2.3 Construct a Weapon Breakdown Shop with related HVAC equipment, ductwork modifications, HVAC controls, fire sprinkler system modifications and Electrical work in the east side of the rear Bay area.
3 SEQUENCE OF WORK: The area concerned in this project is Government owned and will not be in use during the course of this project.
4 SCHEDULING:
4.1 The Contractor shall schedule all activity at the job site through the DPW Base Maintenance Contract Section or Project Management Branch a minimum of 24 hours in advance of work.
4.2 Contractor shall schedule his working hours to coincide with the working hours of the military reservation. Normal working hours of the reservation are 7:30 a.m. to 4:00 p.m., Monday thru Friday, legal public holidays excepted. The Contractor shall not perform work on the reservations beyond the aforementioned working hours without the written approval of the Contracting Officer.
4.3 If the Contractor, for his convenience, desires to perform work during other than normal working hours or on other than normal workdays, he shall notify the Contracting Officer and the Directorate of Public Works Base Maintenance Contract Section or Project Management Branch at least 72 hours in advance. The Contractor shall not perform work beyond the normal working hours or normal workdays without written approval of the Contracting Officer and the DPW Inspection Branch approval. The Contractor shall reimburse the Government for any additional expense occasioned the Government thereby, such as, but not limited to, overtime pay for Government inspectors, utilities service, etc.
4.4 Time extensions due to adverse weather or material lead time, must be received in writing prior to scheduled completion date.
5 UTILITY INTERRUPTIONS: Coordinate with the Contracting Officer, DPW Base Maintenance Contract Section or Project Management Branch, and the user for any utility work that interrupts service to the facility, any area outside the facility, or any real property facility. Establish a schedule of interruptions listing starting and ending times of disconnection 48 hours prior to interruption.
6 FIELD MEASUREMENTS: The Contractor shall verify all measurements at the project site and shall be responsible for all dimensions, fittings, and the proper installation of all materials and equipment specified.
7 PERMITS: The Contractor shall be responsible for obtaining permits for each worksite.
7.1 Digging: A digging permit is required prior to ANY earthwork operations. The DPW Base Maintenance Contract Section or Project Management Branch will assist the Contractor in obtaining this free permit.
7. 2 Land Disturbance: A land disturbance permit is required for any projects that disturb one (1) acre or more. Land disturbance is defined as any activity that disturbs the roots of vegetations such as clearing, grubbing and grading.
The Contractor shall apply for the permit from the Missouri Department of Natural Resources (MODNR), after the FLW Environmental Office has approved the permit application. MODNR by law may take up to 180 days to review and issue a permit. Copy of the permit shall be forwarded to the DPW Environmental Office.
The Contractor shall not begin land disturbance operations until they have received and complied with the MODNR permit. MODNR charges a fee for the permits.
7.3 Hot Work Permit: The Contractor shall obtain a written “Hot Work Permit” (DA Form 5383-R) prior to commencing all hot work outside an approved shop area. Permits will be issued by the FLW Fire & Emergency Services at Fire Station #1, Bldg. 580, Phone: (573) 596-0883. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by terms of this contract. The Inspection Branch will assist the Contractor in obtaining this free permit
7.4 Confined Space Permit: The Contractor shall obtain a written “Confined Space Permit” prior to commencing all confined space activity above and/or below ground. Title 29 CFR 1910.146 OSHA (Confined Space Entry) and FLW Regulation 385-7 sets forth the definition of confined spaces and establishes responsibility and procedures for protection of personnel that shall be entering, work in, and existing confines space. If a permit is required the Contractor shall contact the FLW Fire Department, Fire Station #1, Assistant Chief of Operations, Bldg 580, Phone: (573) 596-0883 prior to, and after the permit required entry is conducted. The Contractor shall keep the permit copy within the work area until all workers have been accounted for after completion of the workday. The Inspection Branch will assist the Contractor in obtaining this free permit.
8 SAFETY REQUIRMENTS:
8.1 General Safety: During progress of work, the Contractor shall protect all personnel, whether Government or civilian, from any and all safety hazards caused by the construction operations. The contractor shall follow all Federal, State and local laws in accordance with 29 CFR 1910 (General Industries Standards), and 29 CFR 1926 (Construction Standards).
8.2 Fire Prevention: The current version of FLW Regulation 420-2 “Post Fire Regulations” is by this reference made a part of this solicitation and resultant contract. The Contractor’s operation shall conform to all applicable portions of this document. All personnel entering on duty as Contractor’s employees shall be instructed in the fire prevention program of the Post and shall be advised of the requirement of the Post Fire Regulations as they pertain to this particular contract.
8.3 Traffic Control: Contractor shall provide all temporary signs and markers as necessary to maintain safety in the worksite. All signs shall conform to the latest edition of the Manual of Uniform Control Devices (MUTCD) and shall be coordinated with, and approved by, DPW Base Maintenance Contract Section or Project Management Branch. Contractor shall ensure road user movement is inhibited as little as practical.
9. SPECIAL REQUIREMENTS:
9.1 Use of Fire Hydrants – The temporary use of fire hydrants as sources of water is not authorized without prior approval by the Fire Department, 596-0886. Fire hydrant connections shall include an approved backflow preventer. Use of backflow preventers must comply with Missouri Department of Natural Resources, Division 60, Public Drinking Water Program, Chapter 11 – Backflow Prevention, Title 10CSR60-11. Government furnished backflow preventers shall be utilized and are available at Bldg. 1601, Water Treatment Plant on a first come basis. The Contractor shall be required to sign a hand receipt prior to obtaining a backflow preventer. The Contractor shall be accountable to return the checked out backflow preventer equipment undamaged and as soon as possible. The contractor shall furnish and use an approved fire plug wrench to open and close the hydrant. Pipe wrenches shall not be used. When the hydrant is not being used it shall be shut off. When the need for the hydrant is finished, the hydrant shall be shut off, the temporary connection and backflow preventer shall be removed, the fire hydrant caps shall be replaced and the Fire Department shall be notified that the hydrant will no longer be used.
10. SECURITY:
10.1 In unoccupied facilities, the Contractor shall be responsible for the security of the facility; i.e., all exterior doors shall be locked, windows closed and locked, etc.
10.2 The Contractor shall not be on site without prior notification to the DPW Contract Inspection Branch.
10.3 Contractor personnel shall have valid civilian ID’s.
11 APPLICABLE PUBLICATIONS/REFERENCES: The publications referenced herein after shall be the most recent at the time of solicitation, unless otherwise specified at the beginning of each Specification Section under paragraph 1.
APPLICABLE PUBLICATIONS and or REFERENCES.
12 WORKSITE HOUSEKEEPING:
12.1 The Contractor shall remove all trash and disposal material from the worksite before the end of each day, to the extent it is consistent with standard construction practices on Government work sites. The Contractor shall take all possible precautions to maintain the work site, at all times, in a condition that will prevent damage or injury to person or property, Government or otherwise. The above precautions shall include protection from weather conditions. The Contractor shall be responsible for all damages caused by the negligent acts or omissions of his employees, sub-contractors, or agents during Contract performance.
12.2 Materials to be used within 1 week of delivery and scrap material to be used as work progresses shall not be required to be in screened area.
However, all such items shall be placed in an orderly manner (i.e. dirt, rock, etc., in piles and stackable items such as pipe, brick, lumber, etc., stacked off the ground on pallets in an orderly manner).
12.3 Grass and weeds at work/storage site shall be kept at a height of 4”or less. Work site/storage site shall be policed for trash and disposal material a minimum of once per day.
12.4 All trailer and material storage sites shall have an identification board/sign, with company and job name on it, i.e. ABC Construction – ABC building complex. Signs shall meet the following criteria: min 3’ X 3’ max of 4’ X 8’ in size, 3” high legible print, and be approved by DPW Inspection Branch.
13 RESPONSIBLITY FOR DAMAGE
13.1 Damage to Personal Property: The Contractor shall be solely responsible for all damage to Government and occupant personal property caused by the Contractors’ personnel, subcontractors, his agents, or by the performance of his work.
13.2 Damage by Negligence: Damage resulting in gas leaks, electrical outages, loss of heat during cold weather, water leaks, unsecured facilities, weather damage, or oil/hazardous waste spills shall be responded to by the Contractor within 2 hours and repaired within one workday. If the Contractor fails to comply with these requirements, the Government reserves the right to repair the damage and charge the cost to the Contractor. Contractor shall protect all areas through which he will be transporting demolition debris or construction materials. Any damaged turf, sidewalks, roads, vegetation, site amenities, etc, shall be replaced or repaired by the Contractor prior to final Contract closeout.
14 DISPOSAL OF MATERIALS: All materials removed and not reused or designated as salvage material in this project shall become the property of the Contractor, unless otherwise specified, and shall be the Contractor's responsibility for lawful disposal.
14.1 The Contractor may use the Fort Leonard Wood Compost area for the disposal of wood chips, leaves, and grass clippings generated by this project.
14.2 All other wastes generated during Contractor operations shall be disposed of off post by the Contractor at his/her expense.
14.2.1 The disposal of demolition waste is regulated by the
Missouri Department of Natural Resources under Chapter 260, Revised Statutes of Missouri and 10 Code of State Regulations Chapter 80-4. Such waste, in types and quantities established by the Department, shall be taken to a demolition landfill or a sanitary landfill off of the Installation for disposal. The Contractor shall provide any information requested by the landfill operator to complete forms required by the Missouri Department of Natural Resources or other Government-required landfill records.
14.2.2 Wastes classified as hazardous wastes under the
Resource Conservation and Recovery Act shall be disposed of off the installation, unless otherwise specified in this contract. No hazardous waste shall be disposed of without prior review of the disposal documents, and the approval of the Contracting Officer and the Directorate of Public Works Environmental Coordinator, or his designated representative. The Contractor shall provide an original copy of the disposal document from the approved EPA or State permitted disposal facility for each shipment of hazardous waste generated in this project to the Contracting Officers Representative.
15 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES:
15.1 All Contractor and sub-contractor personnel performing tasks on this SOW shall comply with all applicable installation, facility and area commander installation/facility access and local security policies and procedures which will be provided to the Contractor by a Government representative upon written request to the Contracting Officer. Contractor shall provide all information required for background checks to meet installation access requirements as performed by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Requesting Contractor shall submit request for installation pass to the KO at https://vcc1.icmvcc.com/im3500/. There is no charge to the Contractor for this pass. Contractor personnel shall comply with all personal identity verification requirements as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of the base contract to this task order, should the Force Protection Condition
(FPCON) at any facility or installation change, the Government may require changes in Contractor security matters or processes.
15.1.1 In the event that the automated system at
https://jkodirect.jten.mil is not available (e.g., server problems), Level I AT Awareness Training can be provided by a qualified instructor. However, if the training is not completed online, the Level I AT Awareness Instructor qualification must be coordinated with the Installation Antiterrorism Officer (or Installation Security equivalent) and the resultant name(s) of approved instructors shall be provided to the KO.
15.2 Antiterrorism (AT) Level I Training: All contractor and sub-contractor employees requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training available at https://jkodirect.jten.mil.Users need to enroll in "Course #JS- US007-14" to receive credit for the training within 10 calendar days of contract award; or for new employees within 10 working days of beginning performance on this contract. Contractor shall submit certificates of completion for all personnel to the KO within five calendar days of completion of the training. There is no charge to the Contractor for this training. The burden to complete this training is approximately 1-hour per employee.
15.3 iWatch Training: Within 10 calendar days of contract award and within 10 calendar days of new Contractor employees commencing work on this contract, all Contractor and sub-contractor employees shall review the FLW Directorate of Emergency Services (DES) web link for iWatch training located at http://www.wood.army.mil/LEC/iWatch/iWatch.htm. This locally developed training will inform employees of the types of behavior to watch for and how to report suspicious activity. Suspicious activity shall be reported to the KO. There is no charge to the Contractor for this review. The burden to complete this training is approximately 20-minutes per employee.
15.4 OPSEC Standard Operating Procedure/Plan (SOP): The KO will ensure the contractor (after selected) is aware of the MSCoE OPSEC Plan and is in compliance with the MSCoE OPSEC Plan during contract performance.
15.5 OPSEC Training: New contractor employees must complete Level I
OPSEC training within 30 calendar days of their reporting for duty in accordance with AR 530-1. All contractors shall complete annual OPSEC Awareness training if the contract duration is longer than 30-days. MSCoE OPSEC Officer will provide training. Coordination of training shall be through Rick Bowser, (573)563-2402. Proof of training, including a detailed listing of attendees, shall be provided to the KO. A nominal fee shall be charged to the Contractor for this training equal to 1-hour of Government time. The burden to complete this training is approximately 1-hour per training evolution. There are no restrictions to number of attendees in a given training evolution.
SECTION 01 33 00
SUBMITTAL PROCEDURES
1. GENERAL: All items of equipment and/or materials that are defined or described in the contract require submission in accordance with this section.
Brochures, samples, certificates of compliance, test reports, as applicable, shall be submitted by the Contractor to the Contracting Officer, and approval given by the Contracting Officer before any equipment or material is installed under this contract.
1.1. All of the data required shall be submitted prior to inclusion into the Work. Approval of materials and equipment requiring color selection will be withheld until all of the required information has been submitted and is in the hands of the Contracting Officer. All submissions must be in sufficient detail to adequately determine that the item will meet the requirements of this specification.
1.2. All submittals shall be transmitted to the Contracting Officer for review and approval within 30 calendar days after contract award date on Engineer Form 4025 in quadruplicate. The forms shall be completed as directed.
No submittal will be accepted unless it is on the subject form. The forms will be furnished to the Contractor by the Government. All attachments to the transmittal form, such as catalog cuts, brochures, certifications, etc., shall be submitted in four (4) copies.
1.3. The Contractor shall complete and submit to the Contracting Officer for approval, four copies of ENG Form 4288 Submittal register. At a minimum, the submittal register shall include a listing of all items listed in paragraph 2 of this Section. This submittal register shall be provided with the initial set of submittals the Contractor submits for approval. ENG form 4288 will be furnished to the Contractor by the Government. This register will be maintained by the Government to insure that all required materials are submitted and approved IAW the contract requirements.
1.4. Scheduling: A minimum of 14 calendar days will be scheduled for review and approval of material submittals and possible resubmittal of any items subject to approval. For shop drawings submittals, a minimum of 21 calendar days will be allowed for review and approval and possible resubmittal.
Unless otherwise specified in the contract, the Notice to Proceed with performance will be issued within 50 calendar days after contract award date.
If shop drawings are required, Notice to Proceed with performance will be issued within 60 calendar days after contract award date. The scheduling shall be coordinated with the approved progress schedule.
2. MATERIAL APPROVAL SUBMITTALS:
At a minimum the following list of materials will require approval under the Contract Clause, FAR 52.236-5, titled Material and Workmanship. The Contracting Officer may require submission of additional materials as deemed necessary. If additional items are required to be submitted a revised ENG form 4288, SUBMITTAL REGISTER, shall be prepared by the Contractor and submitted with the additional material submittals. The Contractor shall not proceed with any work using materials which are subject to approval, until materials are approved.
Sections, material, certificates, and/or procedures requiring approval:
01 11 00 Summary of Work 01 33 00 Submittals 02 41 00 Demolition 02 82 13.00 10 Asbestos Removal 05 40 00 Cold-formed Metal Framing 06 61 16 Solid Surfacing Fabrications 07 84 00 Firestopping 07 92 00 Caulking and Sealants 08 11 13 Steel Doors and Frames 08 11 16 Aluminum Doors 08 14 00 Wood Doors 08 71 00 Hardware 08 81 00 Glazing 09 29 00 Gypsum Board 09 51 00 Acoustical Ceilings 09 65 00 Resilient Flooring 09 68 00 Carpet 09 90 00 Painting 10 14 00.20 Interior Signage 10 28 13 Toilet Accessories 12 31 00 Manufactured Metal Casework 22 00 00 Plumbing, General Purpose 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust
Systems 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 00 Thermal Insulation for Mechanical Systems 23 09 00 Instrumentation and Controls for HVAC 23 09 13 Instrumentation and Controls Devises for HVAC 23 09 23.01 Lonworks Direct Digital Control for HVAC and Other
Building Control Systems 23 09 93 Sequences of Operation for HVAC Control 23 21 12.23 20 Medium Temperature Water System Within Buildings 23 21 13.00 20 Low Temperature Water Heating System 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping
Systems 25 05 11 Cybersecurity for Facility-Related Control Systems 26 00 00.00 20 Basic Electrical Materials and Methods 26 05 00.00 40 Common Work Results for Electrical 26 20 00 Interior Distribution System 26 27 14.00 20 Electricity Metering 26 51 00 Interior Lighting 26 53 00.00 40 Exit Signs 27 10 00 Building Telecommunications Cabling System
33 12 33.00 30 Water Meters
NOTE: For specific quantities and types of materials to be submitted see the individual SECTIONS
SECTION 02 41 00
DEMOLITION
PART 1 - GENERAL
1.1 SUBMITTALS: The procedures proposed for the accomplishment of salvage and demolition work shall be submitted for approval. The procedures shall provide for safe conduct of the work, careful removal and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations.
1.2 GENERAL REQUIREMENTS: The work includes demolition or removal of all construction indicated or specified. All materials resulting from demolition work, except as indicated or specified otherwise, shall become the property of the Contractor and shall be removed from the limits of Government property. Rubbish and debris shall be removed from Government property daily unless otherwise directed so as to not allow accumulation inside or outside the building. Materials that cannot be removed daily shall be stored in areas specified by the Contracting Officer.
1.3 DUST CONTROL: The amount of dust resulting from demolition shall be controlled to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.
1.4 PROTECTION: Protection of Existing Work: Before beginning any cutting or demolition work, the Contractor shall carefully survey the existing work and examine the drawings and specifications to determine the extent of the work. The Contractor shall take all necessary precautions to insure against damage to existing work to remain in place, to be reused, or to remain the property of the Government, and any damage to such work shall be repaired or replaced as approved by the Contracting Officer at no additional cost to the Government. The Contractor shall carefully coordinate the work of this section with all other work and construct and maintain shoring, bracing and supports, as required. The Contractor shall insure that structural elements are not overloaded and be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under any part of this Contract.
1.5 BURNING: The use of burning at the project site for the disposal of refuse and debris will not be permitted.
1.6 USE OF EXPLOSIVES: Use of explosives will not be permitted.
1.7 AVAILABILITY OF WORK AREAS: Areas in which salvage and demolition work is to be accomplished will be available in accordance with the schedule established by the Contracting Officer.
PART 2 - EXECUTION
2.1 EXISTING FACILITIES:
2.1.1 Utilities: Existing utilities shall be removed as indicated.
When utility lines are encountered that are not indicated on the drawings the Contracting Officer shall be notified.
2.1.2 Filling: Holes, open trenches and other hazardous openings shall be filled.
2.2 DISPOSITION OF MATERIAL: Title to all materials and equipment to be demolished, excepting Government salvage, is vested in the Contractor upon removal from the building. The Government will not be responsible for the condition, loss, or damage to such property after notice to proceed.
2.2.1 Material for Contractor Salvage: Material for salvage shall be stored as approved by the Contracting Officer. Salvage materials shall be removed from Government property before completion of the Contract. Material for salvage shall not be sold on the site.
2.2.2 Unsalvageable Materials: Concrete, masonry, and other
noncombustible materials other than concrete permitted to remain in place shall be disposed in the disposal area as directed by Contracting Officer.
2.2.3 Material for Government Salvage: Control panel and controls within, electric actuators and hot water sensors, Boiler with controls and burner with associated piping, and hot water pumps. (Refer to Mechanical Plans)
2.3 CLEAN-UP:
2.3.1 Debris and Rubbish: Debris and rubbish shall be removed from area of work and job site as soon as possible.
2.3.2 Debris Control: Debris shall be removed and transported in a manner as to prevent spillage on streets.
SECTION 02 82 13
ASBESTOS REMOVAL
1.1 REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
1.1.1 AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE):
ASSE/SAFE Z9.2 (2012) Fundamentals Governing the Design and
Operation of Local Exhaust Ventilation Systems
1.1.2 ASTM INTERNATIONAL (ASTM):
ASTM D4397 (2016) Standard Specification for
Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
ASTM E1368 (2014) Visual Inspection of Asbestos
Abatement Projects
COMPRESSED GAS ASSOCIATION (CGA)
CGA G-7 (2014) Compressed Air for Human
Respiration; 6th Edition
INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)
ANSI/ISEA Z87.1 (2015) Occupational and Educational
Personal Eye and Face Protection Devices
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 701 (2015) Standard Methods of Fire Tests for
Flame Propagation of Textiles and Films
NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)
NIOSH NMAM (2016; 5th Ed) NIOSH Manual of Analytical
Methods
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
EP 1110-1-11 (1992; Change 1 1997) Engineering and
Design -- Asbestos Abatement Guideline Detail Sheets
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA 340/1-90/018 (1990) Asbestos/NESHAP Regulated Asbestos
Containing Materials Guidance
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
29 CFR 1910.147 Control of Hazardous Energy (Lock Out/Tag
Out)
29 CFR 1926.1101 Asbestos
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
40 CFR 763 Asbestos
UNDERWRITERS LABORATORIES (UL)
UL 586 (2009; Reprint Sep 2014) Standard for High-Efficiency Particulate, Air Filter Units
1.2 DEFINITIONS:
1.2.1 Amended Water: Water containing a wetting agent or surfactant with a surface tension of at least 29 dynes per square centimeter.
1.2.2 Asbestos-Containing Material (ACM): Any materials containing more than one percent asbestos.
1.2.3 Class I Asbestos Work: Activities defined by OSHA involving the removal of thermal system insulation (TSI) and surfacing ACM.
1.2.4 Class II Asbestos Work: Activities defined by OSHA involving the removal of ACM which is not thermal system insulation or surfacing material.
This includes, but is not limited to, the removal of asbestos - containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastic. Certain "incidental" roofing materials such as mastic, flashing and cements when they are still intact are excluded from Class II asbestos work. Removal of small amounts of these materials which would fit into a glovebag may be classified as a Class III job.
1.2.5 Clean Room: An uncontaminated room having facilities for the storage of employees' street clothing and uncontaminated materials and equipment.
1.2.6 Critical Barrier: One or more layers of plastic sealed over all openings into a regulated area or any other similarly placed physical barrier sufficient to prevent airborne asbestos in a regulated area from migrating to an adjacent area.
1.2.7 Decontamination Area: An enclosed area adjacent and connected to the regulated area and consisting of an equipment room, shower area, and clean room, which is used for the decontamination of workers, materials, and equipment that are contaminated with asbestos.
1.2.8 Disposal Bag: A 6 mil thick, leak-tight plastic bag, pre-labeled in accordance with 29 CFR 1926.1101, used for transporting asbestos waste from containment to disposal site.
1.2.9 Disturbance: Activities that disrupt the matrix of ACM, crumble or pulverize ACM, or generate visible debris from ACM. Disturbance includes cutting away small amounts of ACM, no greater than the amount which can be contained in 1 standard sized glovebag or waste bag, not larger than 1.5 m 60 inches in length and width in order to access a building component.
1.2.10 Equipment Room or Area: An area adjacent to the regulated area used for the decontamination of employees and their equipment.
1.2.11 Fiber: A fibrous particulate, 5 micrometers or longer, with a length to width ratio of at least 3 to 1.
1.2.12 Friable ACM: A term defined in 40 CFR 61, Subpart M and EPA 340/1- 90/018 meaning any material which contains more than 1 percent asbestos, as determined using the method specified in 40 CFR 763, Polarized Light Microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
1.2.13 Glovebag: Not more than a 60 by 60 inch impervious plastic bag-like enclosure affixed around an asbestos-containing material, with glove-like appendages through which material and tools may be handled.
1.2.14 High-Efficiency Particulate Air (HEPA) Filter: A filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles of
0.3 micrometers in diameter.
1.2.15 Intact: ACM which has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix. Removal of "intact" asphaltic, resinous, cementitious products does not render the ACM non-intact simply by being separated into smaller pieces.
1.2.16 Model Accreditation Plan (MAP): USEPA training accreditation requirements for persons who work with asbestos as specified in 40 CFR 763.
1.2.17 Negative Initial Exposure Assessment: A demonstration by the Contractor to show that employee exposure during an operation is expected to be consistently below the OSHA Permissible Exposure Limits (PELs).
1.2.18 NESHAP: National Emission Standards for Hazardous Air Pollutants.
The USEPA NESHAP regulation for asbestos is at 40 CFR 61, Subpart M.
1.2.19 Nonfriable ACM: A NESHAP term defined in 40 CFR 61, Subpart M and EPA 340/1-90/018 meaning any material containing more than 1 percent asbestos that, when dry, cannot be crumbled, pulverized or reduced to powder by hand pressure.
1.2.20 Nonfriable ACM (Category I): A NESHAP term defined in 40 CFR 61, Subpart E and EPA 340/1-90/018 meaning asbestos-containing packings, gaskets, resilient floor covering, and asphalt roofing products containing more than 1 percent asbestos.
1.2.21 Nonfriable ACM (Category II): A NESHAP term defined in 40 CFR 61, Subpart E and EPA 340/1-90/018 meaning any material, excluding Category I nonfriable ACM, containing more than 1 percent asbestos.
1.2.22 Permissible Exposure Limits (PELs):
1.2.22.1 PEL-Time Weighted Average(TWA): Concentration of asbestos not in excess of 0.1 fibers per cubic centimeter of air (f/cc) as an 8 hour time weighted average (TWA).
1.2.22.2 PEL-Excursion Limit: An airborne concentration of asbestos not in excess of 1.0 f/cc of air as averaged over a sampling period of 30 minutes.
1.3.30 Regulated Area: An OSHA term defined in 29 CFR 1926.1101 meaning an area established by the Contractor to demarcate areas where Class I, II, and III asbestos work is conducted; also any adjoining area where debris and waste from such asbestos work accumulate; and an area within which airborne concentrations of asbestos exceed, or there is a reasonable possibility they may exceed, the permissible exposure limit.
1.3.31 Removal: All operations where ACM is taken out or stripped from structures or substrates, and includes demolition operations.
1.3.32 Repair: Overhauling, rebuilding, reconstructing, or reconditioning of structures or substrates, including encapsulation or other repair of ACM attached to structures or substrates.
1.3.33 Surfacing ACM: Asbestos-containing material which contains more than 1 percent asbestos and is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
1.3.34 Thermal System Insulation (TSI) ACM: ACM which contains more than 1 percent asbestos and is applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain or water condensation.
1.3.35 Transite: A generic name for asbestos cement wallboard and pipe.
1.3.36 Worker: Individual (not designated as the Competent Person or a supervisor) who performs asbestos work and has completed asbestos worker training required by 29 CFR 1926.1101, to include EPA Model Accreditation Plan (MAP) "Worker" training; accreditation if required by the OSHA Class of work to be performed or by the state where the work is to be performed.
1.4 SYSTEM DESCRIPTION: This section covers all operations in which asbestos-containing materials (ACM) are encountered.
These procedures and equipment are required to protect workers and building occupants from airborne asbestos fibers and ACM dust and debris. Activities include OSHA Class I and Class II work operations. This section also includes containment, storage, transportation and disposal of the generated ACM wastes. Submit Detailed Drawings in accordance with EP 1110-1-11 and containing descriptions, and site layout to include worksite containment area(s), local exhaust systems locations, decontamination units and load-out units, other temporary waste storage facility, access tunnels, location of temporary utilities (electrical, water, sewer) and boundaries of each regulated area. When the detail sheets are not attached to this specification, the Contractor can get them from the web at:
http://www.publications.usace.army.mil/Portals/76/Publications/Eng ineerPamphlets/EP_11
1.4.1 Abatement Work Tasks: The specific ACM to be abated is identified on the detailed plans and project drawings [see the ASBESTOS REPORT]. A summary for each work task including the appropriate RESPONSE ACTION DETAIL SHEET (item to be abated and methods to be used) and SET-UP DETAIL SHEETS (containment techniques to include safety precautions and methods) is included in the ASBESTOS REPORT at the end of this section.
1.4.2 Unexpected Discovery of Asbestos: For any previously untested building components suspected to contain asbestos and located in areas impacted by the work, notify the Contracting Officer (CO) who will have the option of ordering up to 20 bulk samples to be obtained at the Contractor's expense and delivered to a laboratory accredited under the National Institute of Standards and Technology (NIST) "National Voluntary Laboratory Accreditation Program (NVLAP)" and analyzed by PLM. If the asbestos content is less than 10 percent, as determined by a method other than point counting, the asbestos content shall be verified by point counting. Any additional components identified as ACM that have been approved by the CO for removal shall be removed and will be paid for by an equitable adjustment to the contract price under the CONTRACT CLAUSE titled "changes". Sampling shall be conducted by personnel who have successfully completed the EPA Model Accreditation Plan (MAP) "Building Inspector" training course and is EPA/State certified/licensed as a "Building Inspector".
1.5 SUBMITTALS: Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-03 Product Data
Asbestos Waste Shipment Records;
Encapsulants;
Respiratory Protection Program;
Cleanup and Disposal;
Qualifications;
Training Program
Licenses, Permits and Notifications
Asbestos Management Plan;
SD-06 Test Reports
Exposure Assessment and Air Monitoring
Local Exhaust System
SD-07 Certificates
Local Exhaust System Encapsulants;
Medical Surveillance Requirements
1.6 QUALITY ASSURANCE: In addition to detailed requirements of this specification, work performed under this contract shall comply with EM 385-1-1, applicable federal, state, and local laws, ordinances, criteria, rules and regulations regarding handling, storing, transporting, and disposing of asbestos waste materials. Matters of interpretation of standards shall be submitted to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply. The following state and local laws, rules and regulations regarding demolition, removal, encapsulation, construction alteration, repair, maintenance, renovation, spill/emergency cleanup, housekeeping, handling, storing, transporting and disposing of asbestos material apply: NESHAP – 40 CFR Part 61, Subpart M (61.140 – 61.157); Missouri Air Conservation Law Sections
643.225 – 643.250 of the Revised Statutes of Missouri; and Missouri State Regulations 10 SCR 10-6.241 Asbestos Projects – Registration, Notification and Performance Requirements, and 10 SCR 10-6.250 Asbestos Abatement Projects – Certification, Accreditation and Business Exemption Requirements, see https://dnr.mo.gov/env/apcp/asbestos/index.htm#regulations.
1.6.1 Written Qualifications and Organization Report: Submit a written qualifications and organization report providing evidence of qualifications of the Contractor, Contractor's Project Supervisor, Designated Competent Person, supervisors and workers; Designated IH; independent testing laboratory; all subcontractors to be used including disposal transportation and disposal facility firms, subcontractor supervisors, subcontractor workers; and any others assigned to perform asbestos abatement and support activities. Include in the report an organization chart showing the Contractor's staff organization chain of command and reporting relationship with all subcontractors. The report shall be signed by the Contractor, the Contractor's onsite project manager, Designated Competent Person, Designated IH, designated testing laboratory and the principals of all subcontractors to be used. Include the following statement in the report: "By signing this report I certify that the personnel I am responsible for during the course of this project fully understand the contents of 29 CFR 1926.1101, 40 CFR 61, Subpart M, and the federal, state and local requirements for those asbestos abatement activities that they will be involved in."
1.6.2 Specific Requirements: Designate in writing, personnel meeting the following qualifications:
1.6.2.1 Asbestos Abatement Contractor: Certified/licensed by the state of Missouri to perform asbestos-related activities.
1.7 SAFETY: Prepare a written comprehensive site-specific Accident Prevention Plan (APP). The APP shall be in accordance with the format and requirements in Appendix A of EM 385-1-1. The APP shall incorporate an Asbestos Hazard Abatement Plan (AHAP), and Activity Hazard Analyses (AHAs) as separate appendices into one site-specific document. The APP shall take into consideration all the individual asbestos abatement work tasks identified in Table 1.
1.7.1 Asbestos Hazard Abatement Plan Appendix: The AHAP shall include, but not be limited to, the following:
a. The personal protective equipment to be used;
b. The location and description of regulated areas including clean and dirty areas, access tunnels, and decontamination unit (clean room, shower room, equipment room, storage areas such as load-out unit);
c. Initial exposure assessment in accordance with 29 CFR 1926.1101;
d. Level of supervision;
e. Method of notification of other employers at the worksite;
f. Abatement method to include containment and control procedures;
g. Interface of trades;
h. Sequencing of asbestos related work;
i. Storage and disposal procedures and plan;
j. Type of wetting agent and asbestos encapsulant;
k. Location of local exhaust equipment;
l. Air monitoring methods (personal, environmental and clearance);
m. Bulk sampling and analytical methods (if required);
n. A detailed description of the method to be employed in order to control the spread of ACM wastes and airborne fiber;
o. Fire and medical emergency response procedures;
p. The security procedures to be used for all regulated areas.
1.7.2 Activity Hazard Analyses Appendix: AHAs for each major phase of work, shall be submitted and updated during the project. The AHAs format shall be in accordance with Figure 1-1 of EM 385-1-1. The analysis shall define the activities to be performed for a major phase of work, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level.
Work shall not proceed on that phase until the AHA has been accepted and a preparatory meeting has been conducted by the Contractor to discuss its contents with everyone engaged in the activities, including the onsite Government representatives. The AHAs shall be continuously reviewed and, when appropriate, modified to address changing site conditions or operations.
1.7.3 Local Exhaust System: Local exhaust units shall conform to ASSE/SAFE Z9.2 and 29 CFR 1926.1101. Filters on local exhaust system equipment shall conform to ASSE/SAFE Z9.2 and UL 586. Filter shall be UL labeled. Submit pressure differential recordings and Manufacturer's certifications showing compliance with ASSE/SAFE Z9.2 for:
a. Vacuums.
b. Water filtration equipment.
c. Ventilation equipment.
d. Other equipment required to contain airborne asbestos fibers.
1.8 SECURITY: Fenced and locked security area shall be provided for each regulated area. A log book shall be kept documenting entry into and out of the regulated area. Entry into regulated areas shall only be by personnel authorized by the Contractor and the CO. Personnel authorized to enter regulated areas shall be trained, medically evaluated, and wear the required personal protective equipment.
1.8.1 Licenses, Permits and Notifications: Obtain necessary licenses, permits and notifications in conjunction with the project's asbestos abatement, transportation and disposal actions and timely notification furnished of such actions as required by federal, state, regional, and local authorities. Notify the Missouri Department of Natural Resources, Air Pollution Control, Asbestos Program and the CO in writing 10 days prior to the commencement of work, in accordance with 40 CFR 61, Subpart M, and state and local requirements to include the mandatory "Notification of Demolition and Renovation Record" form and other required notification documents. A building inspection report is to accompany the notification permits by a licensed Missouri AHERA Building Inspector - See Attachment 2- Previous Survey Data Obtained by Government, ACT Asbestos Report (Building xxx), dated 23 January 2017 and the Triangle Asbestos Inspection Report of Building xxx dated January 2015. Notify the local fire department 3 days before fireproofing material is removed from a building and the notice shall specify whether or not the material contains asbestos. The associated fees/costs for licenses, permits, and notifications are is contract.
1.8.2 Regulated Areas: All Class I, II, and III asbestos work shall be conducted within regulated areas. The regulated area shall be demarcated to minimize the number of persons within the area and to protect persons outside the area from exposure to airborne asbestos. Control access to regulated areas, ensure that only authorized personnel enter, and verify that Contractor required medical surveillance, training and respiratory protection program requirements are met prior to allowing entrance.
1.8.3 Warning Signs and Tape: Warning signs and tape printed
bilingually in English and in Spanish shall be provided at the regulated boundaries and entrances to regulated areas. Signs shall be located to allow personnel to read the signs and take the necessary protective steps required before entering the area. Warning signs, as shown and described in DETAIL SHEET 11, and displaying the following legend in the lower panel:
DANGER
ASBESTO
S
CANCER AND LUNG DISEASE HAZARD
AUTHORIZED PERSONNEL ONLY
[RESPIRATORS AND PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA]
See DETAIL SHEET 11 and DETAIL SHEET 15.
1.8.4 Warning Labels: Warning labels shall be affixed to all asbestos disposal containers, asbestos materials, scrap, waste debris, and other products contaminated with asbestos. Containers with preprinted warning labels conforming to requirements are acceptable. See DETAIL SHEET 14,
1.9 HYGIENE: Establish a decontamination area for the decontamination of employees, material and equipment. Ensure that employees enter and exit the regulated area through the decontamination area.
1.9.1 Load-Out Unit: A temporary load-out unit that is adjacent and connected to the regulated area shall be provided.
1.9.2 Single Stage Decontamination Area: A decontamination area
(equipment room/area) shall be provided for Class I work involving less than 25 feet or 10 square feet of TSI or surfacing ACM, and for Class II and Class III asbestos. The equipment room or area shall be adjacent to the regulated area for the decontamination of employees, material, and their equipment which could be contaminated with asbestos. The area shall be covered by an impermeable drop cloth on the floor or horizontal working surface.