Amendment-IFB- Dugway Proving Ground Paving W911S6-21-B-0001-0001.pdf

PDF 121 KB Posted

Attached to
Dugway Proving Ground Horizontal Facility Construction Road Maintenance
Solicitation number
W911S6-21-B-0001
Issued by

About this file

This document outlines requirements for an indefinite-delivery, indefinite-quantity contract for miscellaneous paving construction services at Dugway Proving Ground in Utah. The contract will have a 12-month base period and four one-year option periods, with an estimated value between $1 million and $5 million annually. The work will be assigned through task orders issued by the Contracting Officer. The NAICS code is 237310 for highway, street, and bridge construction. In accordance with FAR 19.804-3, this opportunity is restricted to 8(a) small businesses authorized by the SBA's Utah District Office that can perform work within the district's geographical region. Interested offerors must review provided maps, pictures, and descriptions of Dugway Proving Ground and fill out the Contractor Project Proposal Template and IFB in their entirety. The response deadline is February 16, 2022.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICC- DUGWAY PROV GRD

NICHOLAS J. ROWTON

5330 VALDEZ CIRCLE MS 1

CCMI-CHD-DP

DUGWAY UT 84022-5001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is for the follow ing reason (s)

1. Update TE-01 Contractor Project Proposal Template updating Line items 32-0119 thru 32-0136 regarding fencing and w ire requirements.

2. Extending the closing date from 7 February 2022 13:00 to 16 February 2022 13:00.

3. DFARS 252.223-7999 Ensuring Adequate COVID-19 Safety Protocols for Federal (Placed on Hold)

4. Invitation for Bid (IFB) W911S6-21-B-0001 and all amendments plus Contractor Project Proposal spread sheet needs to be filled-in, in its entirety, signed and returned by closing 16th February 2022 13:00 or w ill be considered non-responsive and not be accepted. Contractor shall put the final totals from the spread sheet on the IFB line items for Base plus 4 options years.

5. Bid Opening w ill be Wednesday the 16th February 2022 promptly at 1:00 pm at Dugw ay Proving Ground Building 5330 Valdez Circle conference room 1409, no bids w ill be accepted after that time.

6. Interested Subcontractor list available upon request.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Feb-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911S621B0001

X 9B. DATED (SEE ITEM 11)

06-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Feb-2022

CODE

MICC- DUGWAY PROV GRD

5330 VALDEZ CIR

MS 1 CCMI-CHD-DP

DUGWAY UT 84022-5001

W911S6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W911S6

FACILITY CODECODE

EMAIL:TEL:

W911S621B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 07-Feb-2022 01:00 PM to 16-Feb-2022 01:00 PM.

SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS

The following have been modified:

TE TABLE OF CONTENTS

Technical Exhibit (TE) and References Table of Contents

IFB W911S6-21-B-0001

IFB Amendment W911S6-21-B-0001-00001

TE-04-2020 Standard Drawing Book

Virtual Site Visit-Dugway Proving Ground PAVER Implementation Report

TE-01 Contractor Project Proposal Template-RV1-013122

TE 08 Work Zones

TE 09 Dust Control Forms

TE -02 2020 Standard Specification Book’

TE-03 Paving IDIQ Airfield Specification Book

TE-05 Materials Manual of Instructions

TE-06 Min Sampling and Testing

TE-07 Quality Management Plans

(End of Summary of Changes)