Questions_and_Answers_for_the_W911S6-16-R-0004.pdf
PDF 102 KB Posted
- Solicitation number
- W911S6-16-R-0004
About this file
CONTRACTOR QUESTION AND ANSWERS.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P00002_16-R-0004.docx | DOCX document | |
| _1_AMENDMENT_TO_W911S6-16-R-0006-U00001.pdf | ||
| Attachment_Two_Site_Visit_Participants.pdf | ||
| Facility_Electrical_WY_N_GA.pptx | PPTX presentation | |
| WasteWaterSlides.pptx | PPTX presentation | |
| Solicitation_W911s6-16-R-0004.pdf | ||
| SDUGWSPPR6615032410060.pdf | ||
| Georgia_Retrofit_As-Builts_15-P-0015.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment One
Questions and Answers for the W911S6‐16‐R‐0004 Waste Water
A. Question posted after site visit:
1. Contractor Question:
Please let us know the flow to be treated in gpm (gallons per minute) or is it a batch at a time?
Answer: Batch at a time currently.
Georgia has a max demand of 500L during any one hour and Wyoming has a max demand of 3000L during any one hour. There are other peripheral systems that could add 20% additional demand.
2. Contractor Question: Is it intermittent as in sporadic or is it continuous?
Answer: It is sporadic at the current time.
The waste supply to this system would be considered intermittent/sporadic, but the re‐supply of treated water back into the system should be designed to be continuous. It is the responsibility of the contractor to propose a functioning/controllable system that maximizes re‐supplied water for each of these facilities.
3. Contractor Question: Is the bacteria content IDLH?
Answer: No, the bacteria content is not IDLH (immediate danger life and health).
4. Contractor Question: Can the filtrate be disposed on Dugway?
Answer: The filtrate is disposed on Dugway.
B. Question posted after Site Visit
1. Contractor Question: In the (Statement of Objectives (SOO)) Performance Work Statement (PWS), Section 2 states that there are no security clearance requirements; Section 4.1 paragraph 3 states that all personnel hold a Secret level clearance and some positions require Top Secret clearance. What if any security level is required? What training is required? There are references to TARP; ATEC annual security awareness training; AT level 1 training; iWatch training; OPSEC training. Which of these is required and how long does each course take to complete? Not required for this contract.
Clarification: Please remember that the Statement of Objective for what the government requires through the objectives, and requires the contractor to provide a contractor statement of work (CSOW) to be incorporated into the contract at time of award.
Answer: In the Statement of Objectives (SOO), the Section 2, is a template information that is not required for this requirement. So you may state this as an exemption in your response. The training is not required, the SOO Section 2 is a template and is not required for this contract and may be added to your exemptions when writing Statement of Work.
2. Georgia:
Contractor Question: Is there a process outlet tank similar to that which we saw at the Wyoming Facility?
Answer: No there is not.
If so, can you provide connection size and location? N/A
3. Contractor Question: What is the flow rate of the RO unit? No data is available for this.
4. Contractor Question: How much treated water?
Answer: No data is available for this.
5. Contractor Question: How much concentrate to drain?
Answer: No data is available at this time for this.
6. Contractor Comment:
The included drawing set and can't seem to find where the existing fresh water tanks are depicted.
Contractor Question: Would a process skid with a 4' W x 20' L x 6' H footprint fit in the bay next to the fresh water tanks?
Answer: No, the skid would not fit inside the building for Georgia.
6'x4'x20' connex INSIDE Georgia Facility? No, not inside. Outside, yes.
Contractor Question: What is in the waste water?:
Answer:
Here's a list of reagents and chemicals that we routinely use in our fermentation and cleaning processes for our stainless steel (SIP) systems.
Tergazyme Alconox Liquinox Dextrose Nutrient Broth Tryptic Soy Broth Luria Bertani Broth Cupric sulfate Tryptone Peptone Brain Heart Infusion Broth
Antifoam 204
Yeast Extract Casein Sucrose Arabinose Manganese chloride Ferrous sulfate Antibiotics Magnesium sulfate Ammonium sulfate Potassium hydroxide (pH control) Sodium hydroxide (pH control) Hydrochloric acid (pH control) Potassium phosphate Sodium citrate Calcium chloride Sodium chloride Zinc chloride Zinc sulfate Ferric chloride Magnesium chloride
C. Visit Questions Georgia and Wyoming WWTF Upgrades
1. Contractor Question: When are the building available or not?
Answer: General information; facility access no problem Oct 2016 to March 2017 and May 2017 to Sept
2017. A major test event is scheduled for Mar –April 2017 where no contractor personnel will have access to either facility.
2. Contractor Question: Do you want the proposals to be separate or combined?
Answer: The proposals should be priced per CLIN and then also provide a Statement of Work for each CLIN.
3. Contractor Question: What is available for power at the Georgia Bldg?
Answer: Georgia has 480 V power with 100 A and 20 A spares available. There is another panel on the other side of the equipment room that has 240V with 3‐20A spares available.
Answer: Space is limited; which may require a concept that houses the treatment unit outside the equipment area or inside a portion of the X0941‐B Warehouse building (will need electrical and heating services added).
4. Contractor Question: What are the dimension from the exterior waste storage tanks to the equipment room storage tanks, dimension from electrical main and sub panel to storage tanks, foot print and dimension of warehouse, and elevation drop from outside storage tanks to waste storage tanks.
5. Contractor Question: What is the available for power at Wyoming?
Answer: Wyoming has main and subpanel with 250A and 100 A spares available.
6. What is the other Tank?
Answer: There is an existing waste storage tank (DCI) that could be used as part of the bidder’s concept solution.
7. Contractor Question: What are the dimensions from the exterior waste storage tanks to the equipment room storage tanks, dimension between electrical main and sub panel, dimension from subpanel to center of Overhead door and Overhead door to DCI tank, and elevation drop from outside storage tanks to waste storage tanks.
Answer:
54 ft bldg. edge to kill tank
35 ft kill tank to storage tank
200 ft to bldg.
Wyoming: South Tank North Tank Elevation drop ‐2.701m ‐2.746m
240 ft to bldg.
Georgia: South Tank North Tank Elevation drop ‐2.478m ‐2.609m 165’ to warehouse center
35 ft from panel to bldg.
edge
Warehouse: 40’ x 24’ footprint 20 ft high
Inside panels 29 ft apart and 21 ft to bldg. edge
120 & 26 ft tanks to bldg. corner
Contractor Question:
If not, is there an arrangement that would fit? IE: L shape? Two smaller skids?
Answer: There is no footprint available for the process skid inside the Georgia bldg.
File details come from the government source that posted it. Updated .