About this file

This document is an amendment to a solicitation for a Job Order Contract at Fort Drum, New York. The solicitation is for an indefinite delivery, indefinite quantity contract to provide a wide variety of construction and repair services at the installation, including but not limited to carpentry, road repair, roofing, excavation, electrical, HVAC, plumbing, sheet metal work, painting, demolition, concrete, welding, and emergency repairs. The contractor will be responsible for planning, programming, administration, management, and performance of all repair and construction work in accordance with contract requirements and applicable laws and regulations. The NAICS code for this requirement is 236220. The small business size standard is $39.5 million. The government estimates a maximum ordering value of $110 million over the life of the contract. The minimum guarantee is $10,000 for the base period and $5,000 for each option period. Interested parties must register in the System for Award Management. The point of contact for the solicitation is the listed contracting specialist and contracting officer. The response due date remains the same.

View the file

Other files for this federal contract opportunity

Other files attached to Job Order Contract Fort Drum, newest first.
File Type Posted
W911S222R8000 JOC Solicitation.pdf PDF
W911S222R8000A0002.pdf PDF
W911S222R8000 JOC Solicitation.pdf PDF
Attachment 12- Fort Drum Exterior Utility Standards (28 MAR 18).pdf PDF
Attachment 15- Performance Assessment Questionnaire-1.pdf PDF
Attachment 8- Water Supply Improvement Submittal Procedures.pdf PDF
Attachment 13- Contractors Final Addidavit.pdf PDF
Attachment 18- Fort Drum JOC Specs derived from Front Range SABER 2015.pdf PDF
Attachment 19- RFI Questions and Answers.pdf PDF
Exhibit A-CDRLs D013-D016 JOC.pdf PDF
Attachment 17- HexFoam SOP (25 FEB 20).pdf PDF
Attachment 1- Statement of Work.pdf PDF
Attachment 5- IMDR-ES Form 2 Application for Sponsorship (Jan 2016).pdf PDF
Attachment 7- Endangered Species Act Requirements.pdf PDF
Attachment 14- Fort Drum Hazardous Waste Management Plan (01 AUG 19).pdf PDF
Exhibit A-CDRLs D009-D012 JOC.pdf PDF
Exhibit A-CDRLs D001-D004 JOC.pdf PDF
Attachment 10- GPM-21-11 Excavation Permits (27 OCT 21).pdf PDF
Attachment 6- Fort Drum Electrical Outrages SOP.pdf PDF
Attachment 9- NYDEC Sewer Submittal Procedures (4 OCT 19).pdf PDF
Attachment 2- Wage Determination NY20220022.pdf PDF
Attachment 3- Wage Determination NY20220009.pdf PDF
Attachment 4- ENG FORM 4025-R (Mar 2012).pdf PDF
Attachment 16- AFFF Release SOP (08 MAR 21).pdf PDF
Exhibit A-CDRLs D017-D020 JOC.pdf PDF
Exhibit A-CDRLs D005-D008 JOC.pdf PDF
Attachment 11- Confined Space Entry Procedures.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911S222R8000A0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation amended based on Offerors RFIs.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 73

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Feb-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911S222R8000

X 9B. DATED (SEE ITEM 11)

04-Feb-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Feb-2022

CODE

MICC-FT DRUM

925TH CBN & MICC FORT DRUM

FORT DRUM NY 13602-5434

W911S2 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A Contract Data

Requirements List

10 06-FEB-2020

Attachment 1 Statement of Work 14 14-SEP-2021

Attachment 2 Wage Determination

NY20220022

6 07-JAN-2022

Attachment 3 Wage Determination

NY20220009

13 07-JAN-2022

Attachment 4 ENG FORM 4025-R 2 01-MAR-2012

Attachment 5 IMDR-ES Form 2

Application for

Sponsorship

2 01-JAN-2016

Attachment 6 Fort Drum Electrical

Outages SOP

7 06-FEB-2020

Attachment 7 Endangered Species Act

Requirements

23 29-DEC-2020

Attachment 8 Water Supply

Improvement Submittal

Procedures

4 04-OCT-2019

Attachment 9 NYSDEC Sewer

Submittal Procedures

6 04-OCT-2019

Attachment 10 GPM 21-11, Excavation

Permits

5 21-OCT-2021

Attachment 11 Confined Space Entry

Procedures

45 20-JAN-2015

Attachment 12 Fort Drum Exterior

Utility Standards

33 28-MAR-2018

Attachment 13 Contractors Final

Affidavit

1 13-FEB-2020

Attachment 14 Fort Drum Hazardous

Waste Management Plan

51 01-AUG-2019

Attachment 15 Performance Assessment

Questionnaire

5 13-FEB-2020

Attachment 16 AFFF Release SOP 6 24-FEB-2020

Attachment 17 HexFoam SOP 4 25-FEB-2020

Attachment 18 Fort Drum JOC

Specifications from Front

Range SABER 2015

3824 01-JAN-2015

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A Contract Data

Requirements List

10 06-FEB-2020

Attachment 1 Statement of Work 14 14-SEP-2021

Attachment 2 Wage Determination

NY20220022

6 07-JAN-2022

Attachment 3 Wage Determination

NY20220009

13 07-JAN-2022

Attachment 4 ENG FORM 4025-R 2 01-MAR-2012

Attachment 5 IMDR-ES Form 2

Application for

Sponsorship

2 01-JAN-2016

Attachment 6 Fort Drum Electrical

Outages SOP

7 06-FEB-2020

Attachment 7 Endangered Species Act

Requirements

23 29-DEC-2020

Attachment 8 Water Supply

Improvement Submittal

Procedures

4 04-OCT-2019

Attachment 9 NYSDEC Sewer

Submittal Procedures

6 04-OCT-2019

Attachment 10 GPM 21-11, Excavation

Permits

5 21-OCT-2021

Attachment 11 Confined Space Entry

Procedures

45 20-JAN-2015

Attachment 12 Fort Drum Exterior

Utility Standards

33 28-MAR-2018

Attachment 13 Contractors Final

Affidavit

1 13-FEB-2020

Attachment 14 Fort Drum Hazardous

Waste Management Plan

51 01-AUG-2019

Attachment 15 Performance Assessment

Questionnaire

5 13-FEB-2020

Attachment 16 AFFF Release SOP 6 24-FEB-2020

Attachment 17 HexFoam SOP 4 25-FEB-2020

Attachment 18 Fort Drum JOC

Specifications from Front

Range SABER 2015

3824 01-JAN-2015

Attachment 19 RFI Questions and

Responses for

W911S222R8000

13 23-FEB-2022

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRCUTIONS TO OFFERORS

PART I – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

1. NOTICES TO OFFERORS:

1.1. COMPETITION: This acquisition is 100% set-aside for small business concerns, pursuant to the requirements of FAR Subsection 19.502-2, Total small business set-asides.

1.2. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE for this acquisition is 236220. It is the Offeror’s responsibility to ensure that its System for Award

Management (SAM) registration includes this NAICS. If it does not, contract award may be delayed.

1.3. BID GUARANTEE: REQUIRED and shall be provided with the offer, see FAR Clause

52.228-1.

1.4. OFFER ACCEPTANCE PERIOD: See Standard Form 1442, SOLICITATION, OFFER, AND AWARD, BLOCK 13 D. AND BLOCK 17. Offerors providing less than 180 calendar days for Government acceptance after the date offers are due will not be considered for award and will be rejected. If the Offeror would like to provide more than 180 calendar days to be considered, the number of days must be inserted in BLOCK 17. Failure to insert a number into

BLOCK 17 shall mean the Offeror accepts the minimum in Item 13D.

1.5. PERFORMANCE AND PAYMENT BONDS: Offerors are reminded of the requirement for performance and payment bonds (SEE BLOCK 12A. of the STANDARD FORM 1442 –

SOLICITATION, OFFER, AND AWARD and FAR Clause 52.228-15 -- Performance and

Payment Bonds -- Construction).

1.6. SYSTEM FOR AWARD MANAGEMENT (SAM): To be eligible for award of a

Department of Defense (DoD) contract, Contractor registration in the SAM data base is required

(see FAR Clause 52.204-7). Failure to register with SAM shall make the Contractor ineligible for award. New registration in SAM can take a few weeks. Therefore, it is critical that Offerors interested in this solicitation complete their SAM registration in sufficient time to meet solicitation representation and certification requirements.

1.7. AMENDMENTS: No bidder’s mailing list will be maintained. It is the responsibility of all interested parties wishing to offer on this requirement to monitor SAM.gov for any/all amendments to this solicitation. The Offeror is required to acknowledge amendments in block 19 of the SF 1442. Failure to respond to an amendment may render the offer ineligible for award and thereby rejected.

1.8. SOLICITATION PROVISIONS/REPRESENTATIONS & CERTIFICATIONS: The

Offeror must have completed the Representations and Certifications section within their SAM record or FAR 52.204-8 is required to be completed.

1.9. REPRESENTATIONS AND CERTIFICATIONS: Representations and certifications shall be updated within the SAM system as necessary, but as a minimum, an annual update is required.

1.10. VETS-4212: Federal Contractors and subcontractors who receive Federal contracts of

$150,000 or more are required to annually file, no later than September 30th of each year, Form

No. VETS-4212 entitled "Federal Contractor Veterans' Employment Report" with the

Department of Labor. In addition, all Federal Contracting Officers are prohibited from awarding contracts or disbursing funds to Federal contractors or subcontractors that have not submitted a current VETS-4212 Report. For more information on this requirement, see the following website: http://www.dol.gov/vets/vets4212.htm.

1.11. SOLICITATION QUESTIONS: Questions shall be in writing and e-mailed to lindsay.a.mclaughlin.civ@army.mil, and alfredo.m.sanchez.civ@army.mil. Questions concerning this solicitation will be accepted up to 18 February 2022, 4:00PM EST. Fort Drum does not commit to providing responses to questions submitted after THIS DATE; however attempts to answer all relevant questions will be made.

1.12. OFFER SUBMISSION: All offers must be received in hard copy and a digital copy on compact disk (CD) prior to the offer due date in box 10 of this solicitation (first page). All hard copies shall be executed with the original signature of the Offeror. The Request for Proposal

(RFP) contains provisions and other items required to be completed by the Offeror and returned with its proposal. Failure to provide this information with the proposal may render the proposal non-responsive and not eligible for award. Offers are due 7 March 2022 at 2:00PM EST. The hard copy documents shall be clearly marked containing the procurement and solicitation number: Fort Drum Job Order Contract, Solicitation# W911S222R8000, and mailed to:

Mission & Installation Contracting Command – Fort Drum

P31 Quartermaster Road

Fort Drum, NY 13602

1.13. Reserved.

1.14. PROPOSALS: The Offeror shall submit a proposal that addresses all evaluation areas, specifically identifying how the proposed contractual requirements will be satisfied. A

Government team will evaluate each proposal strictly in accordance with its content and will not assume that performance will include areas not specified.

1.15. FACTORS: The proposals will be evaluated on three factors: Technical Capability, Past

Performance, and Price.

1.16. On Site. See paragraph 1.3 of the Statement of Work (SOW). Fort Drum will not provide any office or Government space on the installation.

2. JOINT VENTURES. There are specific requirements that a Joint Venture (JV) must satisfy to submit an offer. Therefore, Offerors submitting proposals as a Joint Venture shall provide the following information with its proposal:

2.1. The Joint Venture Agreement.

2.2. A description of:

2.2.1. Who will have control over the JV and the percentage of control,

2.2.2. The management structure of the Joint Venture,

2.2.3. Who will manage the contract,

2.2.4. The relative amount of work to be performed by each party, and

2.2.5. Who will perform each contract task.

2.2. The names, signatures and titles of each participant in the joint venture shall be set forth in the proposal.

3. PROPOSAL FORMAT: Written proposals shall be submitted in four Sections. Each section shall be in the format as follows:

Proposal Section TOTAL

MAXIMUM

ALLOWED

PAGES

Section I: Executed Request for Proposal (Filled out Section 00600; the original signed bid guarantee and Joint Venture documentation, if applicable)

No Maximum

Section II: Factor 1: Technical Capability to include: Element 1:Mangement, and Element 2: Bonding Capacity

Section III: Factor 2: Past Performance Proposal No Maximum

Section IV: Factor 3: Price Proposal No Maximum

*NOTE: Offerors are cautioned that any information beyond the maximum number of pages will not be evaluated.

3.1. Proposals shall be clearly and concisely written, indexed (cross-indexed, as appropriate) and logically assembled. All pages of each proposal shall be appropriately numbered and identified with the solicitation number. Price information shall only be included in Section IV.

Offerors shall include a cover page for each Section, which clearly identifies the Section Name

(e.g., Section II, Management), Request for Proposal (RFP) Number, and Date of Submission.

3.2. The Offeror’s written proposal shall be prepared in PDF using standard 8.5 x 11 inch layout in portrait orientation. This applies to both hard copy and digital copy. The proposal pages shall be numbered. Each page must have a one-inch margin at the top, the bottom, and on each side.

Page numbers, notations of proprietary information, and any other identifying information on each page are excluded from the margin requirement. Print must be spaced at six lines per inch.

Text font shall be Times New Roman and no smaller than 11 point, but text included on figures and/or matrices may be reduced to 8 point. An Offeror’s proposal must meet the Government’s readability requirement and smaller type shall not be used to circumvent the proposal page limitations. The price spreadsheets shall be prepared in PDF.

3.3. Section I, Executed Request for Proposal, shall be submitted both in hard copy and compact disk (CD). The second page of the SF 1442 signed and dated, first page of any and all amendments to the solicitation signed and dated (if applicable), and the original signed bonds.

All hard copies shall be executed with the original signature of the Offeror. Digital copies shall be included with the hard copy proposal submission. All completed Provisions, Representations and Certifications required by the solicitation as set forth in Section 00100, PART I –

INSTRUCTIONS, CONDITIONS and NOTICES TO OFFERORS, Paragraph 1.8. All required documentation, whether digital or hard copy, must be received no later than 2:00PM EST on 7

March 2022. Proposals received after solicitation closure date shall be considered ineligible for award.

3.4. Sections II, Technical Proposal; Section III, Past Performance Proposal, and Section IV, Price Proposal are required in both hard copy and compact disk (CD). They shall follow the same format as outlined in paragraph 3. PROPOSAL FORMAT.

3.5. The proposal should be specific, detailed, and complete in order to demonstrate that the

Offeror has a thorough understanding of the solicitation requirements. Statements such as “the

Offeror understands, assumes, can, or will comply with the Statement of Work,” statements that paraphrase the Statement of Work (SOW), or contain ambiguous phrases such as “standard procedures will be employed” or “well known techniques will be used” will be considered unacceptable.

3.6. As stated in FAR Clause 52.215-1, the Government intends to evaluate and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)).

Therefore, the Offerors’ initial proposal should contain the Offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the

Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which and efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. If negotiations are deemed necessary, and proposal revisions are requested, they shall be submitted as an edited version of the original PDF document(s) with revised text readily identifiable using bolded font, red in color.

4. FACTOR 1: TECHNICAL ACCEPTABILITY: The Technical portion of the proposal encompasses the recognition of the full scope of services and their interrelationships in order to optimize responsiveness, timeliness, efficiency, and effectiveness of services rendered. The

Technical proposal shall consist of a narrative and supporting data (e.g., matrix, charts, or other graphics) addressing the technical requirements necessary to support contract performance.

4.1. ELEMENT 1 - MANAGEMENT: The Offeror shall address the management areas defined below.

4.1.1. Response Time: Describe your local office location plan in order to meet the minimum response time to Fort Drum (see Attachment 1 STATEMENT OF WORK (SOW) paragraph

1.2.).

4.1.2. On-Site Staff: Describe your proposed on-site personnel structure and staff, authority, and responsibilities required for each position (see Attachment 1 STATEMENT OF WORK (SOW) paragraph 1.3. POSITION REQUIREMENTS/CONTRACTOR STAFF/KEY PERSONNEL).

Key Program Management details shall be broad enough to address responsibility for proposal preparation, subcontract management, surveillance of work, corrective action, and how the

Offeror plans to interface with Government inspectors and project managers at each stage of construction. Provide an organizational chart that includes job category/title with qualifications/skills and resumes for all key personnel listed in Attachment 1.

4.1.3. Contractor Quality Control (CQC) Plan. Describe your proposed CQC plan. See section

00800, ADDITIONAL CONTRACT REQUIREMENTS, paragraph 13.3. for plan requirements.

4.2. ELEMENT 2 - BONDING CAPACITY: The Offeror shall address their bonding capability defined below.

4.2.1. Proof of acceptable bonding coverage for the full contract. Performance and Payment

Bonding capability shall be evaluated to determine if the Offeror has the bonding capability to fulfill the requirements of the contract. The bonding will be considered acceptable when the

Offeror provides documentation at the time of proposal, with verification from the Securities or

Bonding Company, to demonstrate their per task order ($22,000,000) and annual aggregate maximum capability ($44,000,000) for construction bonding in support of the estimated amounts for this contract. The corporate bonding surety must appear on the Department of Treasury

Listing of Approved Sureties (Department Circular 570).

5. FACTOR 2: PAST PERFORMANCE:

5.1. The past performance evaluation will assess the relative risks associated with an Offeror’s likelihood of success in performing the solicitation’s requirements as indicated by that Offeror’s record of past performance. In this context, “Offeror” refers to the proposed prime Contractor and teaming partners, subcontractors, or joint ventures. Past performance shall be assessed by evaluating aspects of the Offeror’s relevant, and recent past performance, and how well they performed on prior contracts. Sources of past performance information for evaluation purposes will be provided by the Offeror from the Performance Assessment Questionnaire, which will be tailored to this acquisition. Offerors are cautioned that in conducting the past performance assessment, the Government may use data provided in the Offeror’s proposal and data obtained from other sources, including but not limited to other contracts or subcontracts whether listed or not, and data obtained from other established systems such as Federal Awardee Performance and

Integrity Information System (FAPIIS) reports from the Contractor Performance Assessment

Reporting System (CPARS) website. Information may also be obtained from other sources available to the Government, such as the Defense Contract Management Agency, State

Department Watch Lists; and interviews with Program Managers, and Contracting Officers.

5.2. Relevant Assessment. A relevancy determination of the Offeror’s past performance will be made (including joint venture partner(s) and subcontractor(s)). The past performance information provided in the proposal and information obtained from other sources will be used to establish the degree of relevancy of past performance information.

5.3. Recent Assessment. An assessment of the past performance information will be made to determine if it is recent. The past performance information provided in the proposal and information obtained from other sources will be used to establish the degree that the past performance information is recent.

5.4. Performance on prior contracts. The past performance evaluation should determine how well the Offeror performed on prior contracts. Offerors shall identify and submit a separate reference for five of the most similar/relevant federal, state, local government, and private sector contracts and subcontracts the firm has performed within the last six years. To comply with this requirement, the Offeror shall use the format found in Attachment 15 of the RFP. Offerors shall send the Past Performance Risk Assessment Questionnaire Letter found in Attachment 15 of the

RFP to their references (individuals and organizations), and request them to e-mail the completed questionnaires to lindsay.a.mclaughlin.civ@army.mil and alfredo.m.sanchez.civ@army.mil on or before the due date. The Government will consider the information gathered from The

Performance Assessment Questionnaire as well as information obtained from any other source when evaluating the Offeror’s past performance.

5.5. In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can reasonably be assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (FAR 15.305(a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability / unacceptability, a neutral rating shall be considered “acceptable.” IAW FAR Subpart 19.6

Certificates of Competency and Determinations of Responsibility, any Offeror determined

“unacceptable” during evaluation of their proposal shall have the matter referred to the SBA

Government Contracting Area Office serving the area in which the headquarters of the Offeror is located for a Certificate of Competency.

6. FACTOR 3: PRICE: JOC IDIQ price proposal shall consist of the Bid Schedule. Section

00100 Bidding Schedule/Instructions to Bidders, Paragraph 6, Coefficient Table, shall be submitted fully completed and error free. It shall contain the Offeror’s prices (coefficients) in the mailto:lindsay.a.mclaughlin.civ@army.mil mailto:alfredo.m.sanchez.civ@army.mil established format specified in the Bid Schedule. Coefficient means a numerical factor that represents costs (generally indirect costs) not considered to be included in the UPB prices. The coefficients are proposed as a percentage (in decimal format) increase or decrease to the UPB prices. For example, a coefficient of 1.2 would result in an additional 20 percent to the listed unit price; 0.9 would result in a 10 percent decrease of the listed prices, and 1.00 would leave the unit price as the proposed unit price. The Offeror shall limit the Coefficients to two decimal places.

The Offeror shall propose coefficients for each SubCLIN.

The Bid Schedule Table is shown below in PART II – EVALUATION FACTORS FOR

AWARD, paragraph 2.3.3.2.

The Offeror shall fill out this table by inserting their respective coefficients for each of the associated working hour/condition categories in column (a), then multiplying each coefficient by the respective proportion in column (b), and summing each of these weighted coefficient factors to produce the single weighted coefficient in Column (c) that will be multiplied by

$22,000,000.00 and result in the evaluated price in column (d). The sum of all working hours will equal the grand total and will be entered for NET AMOUNT under CLINs 0001-4001. All components of price shall be included in the Offeror’s coefficient, as no allowance for omitted cost will be made later. The Offeror’s Coefficients shall be all inclusive and shall include, but not be limited to, the following costs:

General and Administrative and other Overhead

Profit and risk

Bond premiums

Social security contributions

Insurance Costs

Employee Payroll Taxes

Insurance and Fringe Benefits

Subcontractors’ Overhead and Profit

Phase In/Phase Out

Site cleanup

Labor adjustments between the Unit Price Book given labor rates and the current

Wage Rate

Requirement (Construction) Rates

Supervision

Quality control

Transportation of contractor’s personnel to, from, and within the job site

Shipping of all materials to the jobsite

Lodging and per-diem

Adjustment factors to account for small jobs

Incidental tools and equipment

Submittals

Job Order preparation costs

Any markups for materials and all contingencies

Corporate Headquarters support (legal, financial, etc.)

Waste and excess material

General Conditions

Sales tax on material and equipment costs

Compliance with EPA/OSHA regulations and protection and safety laws

7. EVALUATION OF PROPOSALS. During the conduct of this acquisition, the Acquisition

Source Selection Interactive Support Tool (ASSIST) will be used by the Government to support the proposal evaluation and source selection process. A separate tool, the ASSIST2Industry, will be used in conjunction with ASSIST to accomplish all exchanges with Offerors after receipt of proposals pursuant to FAR 15.306. ASSIST2Industry provides the ability for the Government to issue, and the Offerors to receive and respond to, all Evaluation Notices (ENs) in a secure online environment. ASSIST2Industry also provides the ability for the Government to issue, and the Offerors to receive letter correspondence. Contractors cannot respond to letter correspondence; but, can acknowledge receipt of the letter(s).

7.1. In order to initiate the use of ASSIST2Industry, the Government requires the names, company titles, telephone numbers, and email addresses of two individuals that the Offeror has designated as responsible for receiving and responding to Government ENs through

ASSIST2Industry. The designation of two individuals is for the purpose of insuring availability of one individual if the other individual is not available. The required information regarding these two individuals must be submitted with the Offeror’s proposal and included in the cover letter. Those two individuals, if selected in ASSIST, will also be the Contractor POCs to receive letter correspondence from the Government. Therefore, it is the Contractor’s responsibility to ensure that the information provided at proposal submission is accurate and up to date throughout the source selection process. If letter correspondence is sent by the

Government via ASSIST, Contractor POCs will receive email notification informing them that they have correspondence, and that they must login to ASSIST2Industry and acknowledge receipt of the correspondence.

7.1.1. After the solicitation’s closing date, the Government will establish an account in

ASSIST2Industry for each individual identified by the Offeror that has submitted a proposal in response to this solicitation. The two individuals named by the Offeror will be authorized access to that account. Two separate system generated emails will be sent to each individual. One of the emails will contain the individual’s ASSIST2Industry username. The other email will contain the individual’s temporary password. Using the provided username and temporary password, each individual can then go to https://ASSIST2Industry.army.mil to access the account. NOTE: The first time a user logs in, the user will be required to change the temporary password before the user can proceed to use the site. Whenever the Government issues ENs to the Offeror through

ASSIST2Industry, the Government’s Contracting Officer will notify the Offeror through either

ASSIST2Industry or a medium independent of ASSIST2Industry ( e.g., e-mail) that the Offeror has ENs in ASSIST2Industry waiting for a response. There will be no ENs in ASSIST2Industry until such notice is issued by the Contracting Officer.

https://assist2industry.army.mil/

7.2. Accessing ASSIST2Industry for Prime Contractor. Access to ASSIST2Industry will require a two factor authentication for each Prime Contractor user. All

ASSIST2Industry users are required to have a username/password (first authentication) and may select one of the following three methods for implementing the second authentication to access the site:

1. use an authenticator application on your cell phone (e.g. Google or Microsoft

Authenticator) to receive a QR Code;

2. receive a code via an SMS Text Message to your cell phone; or

3. receive a code via e-mail.

If you have any other problems accessing your account, contact the Army Enterprise Service

Desk (AESD) at the number at 1-866-335-2769 (ARMY), # Option 7

Please be prepared to provide the following:

Contractor POC Name;

Telephone Number;

Email Address;

Procuring Contracting Officer and/or Contract Specialist Name and Telephone Number;

ASSIST Source Selection/Program Name; and

Solicitation Number.

7.3. Contractor POCs should not provide any additional information than what is noted above.

The Offerors are cautioned that the system generated emails referred to above are intended for administrative purposes only. Receipt of these emails does not consitute the commencement of any time of exchange with the Offeror in accordance with FAR 15.306(A0, (B), or (D) (i.e clarifications, communications or discussions). Also, receipt of these emails does not signify that a competitve range determination in accordance with FAR 15.306(C) has been made or that the

Offeror’s proposal will be included in the competitive range when that determination is made.

All notifications that any type of exchange with the Offeror has commenced and the Offeror has

Evaluation Notices (ENs) available to response to or any notification that the Offeror’s proposal has been included in or excluded from the competitive range will be sent to the Offeror by the

Contracting Officer independently of the ASSIST2Industry.

END OF PART I – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

PART II – EVALUATION FACTORS FOR AWARD

1. BASIS OF AWARD:

1.1. The Government intends to award a single award JOC IDIQ contract to the Offeror whose proposal conforms to the solicitation requirements, and judged by an overall assessment of the evaluation criteria and other considerations specified in this solicitation, is the Lowest Price

Technically Acceptable offer. As a basis for award, trade-offs between price and non-price factors are not permitted. Incomplete offers may be considered ineligible for award. As set forth in FAR 52.215-1(f)(4), the Government intends to evaluate proposals and award a single award

JOC IDIQ contract without discussions with Offerors (except clarifications as described in FAR

15.306(a), Clarifications and award without discussions). Therefore, the Offerors’ initial proposal should contain the Offeror’s best terms from a cost or price and technical standpoint.

The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which and efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. If negotiations are deemed necessary, and proposal revisions are requested, they shall be submitted as an edited version of the original PDF document(s) with revised text readily identifiable using bolded font, red in color. The proposals will be evaluated on three factors: Technical Acceptability, Past Performance, and Price.

1.2. The Government will evaluate each proposal under source selection procedures to determine the extent to which each proposal demonstrates both the capability to perform and a clear understanding of the JOC IDIQ requirements.

1.3. Proposals shall conform to or exceed solicitation requirements, and will be evaluated to determine which proposal is the lowest price technically acceptable based on technical capability, past performance, and price. Award will be made to the lowest price technically acceptable responsible Offeror based on the lowest evaluated price of proposals meeting the capability standards for non-cost factors in accordance with the terms and conditions of the solicitation and evaluation procedures set forth in Section 00100 of the solicitation.

1.4. The Government will assess the proposal against the evaluation factors, and the soundness, completeness, and adequacy of the approach. The Government will evaluate the information presented in the proposal; where the Government has specified a maximum number of pages, any information above the maximum specified limitation will not be evaluated.

2. EVALUATION CRITERIA:

2.1. Evaluation criteria consists of factors and elements. The proposals will be evaluated under three evaluation factors: Technical Capability, Past Performance and Price.

2.2. The Government’s primary objective in selecting an awardee for the proposed contract is to make a determination based on a lowest price technically acceptable analysis of the proposal found under each evaluation factor.

2.3. EVALUATION FACTORS:

2.3.1. FACTOR 1: TECHNICAL ACCEPTABILITY: To be considered technically acceptable, Offerors must demonstrate the capability to provide the elements set forth below as required by the solicitation. Technical Capability will be based on the following elements:

2.3.1.1. ELEMENT 1 - Management: The evaluation areas specific to the Management element are Response Time, On-Site Staff and Quality Control Plan.

2.3.1.1.1. Response Time shall meet the minimum requirements listed in Attachment 1

STATEMENT OF WORK (SOW) paragraph 1.2. Google maps will be utilized to calculate your proposed ability to meet the minimum response time based on your proposed site location.

2.3.1.1.2. Your On-Site Staff shall meet the minimum requirements listed in Attachment 1

STATEMENT OF WORK (SOW) paragraph 1.3. POSITION

REQUIREMENTS/CONTRACTOR STAFF/KEY PERSONNEL.

2.3.1.1.3. Your Contractor Quality Control Plan shall meet the minimum requirements listed in section 00800, ADDITIONAL CONTRACT REQUIREMENTS, paragraph 13.3.

2.3.1.2. ELEMENT 2 - Bonding Capacity: Bonding capacity shall meet the minimum requirements in Section 00100, PART I – INSTRUCTONS, CONDITIONS AND NOTICES TO

OFFERORS, paragraph 4.2.1.

2.3.1.3. Each Technical Capability element will receive one of the ratings defined below. The element ratings will be used to determine an overall rating for the factor. An Offeror receiving an unacceptable rating for any element within the Technical Capability factor will receive an unacceptable overall rating for the factor and will not be considered for award.

Technical Acceptable / Unacceptable Ratings

Adjectival Rating Description

Acceptable Proposal meets the requirements of the solicitation

Unacceptable Proposal does not meet the requirements of the solicitation

2.3.2. FACTOR 2: PAST PERFORMANCE.

2.3.2.1. Past Performance shall be assessed by evaluating aspects of the Offeror’s relevant, recent past performance, and how well they performed on prior contracts.

2.3.2.2. Relevant Assessment. To be relevant, the Offeror’s work experience must be similar in nature of work, size, magnitude, complexity and scope to that required under the solicitation. The

Government will conduct an in-depth evaluation of all recent performance information obtained to determine if it is the same/similar in nature, size, and complexity to the services/products being procured under this solicitation. When determining the relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the Offeror, joint venture, or subcontractor whose contract is being reviewed and evaluated.

2.3.2.3. Recent Assessment. To be recent, the effort must be ongoing or must have been performed during the six years prior to the date of issuance of this solicitation. Recent past performance is defined as not more than six years prior to the RFP release date. Past performance information that fails this condition shall be considered “neutral.”

2.3.2.4. Performance on prior contracts. In order for performance on prior contracts to be evaluated acceptable, Offeror must be rated on the Performance Assessment Questionnaire, “Satisfactory Confidence” or higher. Past performance, information that fails this condition shall be considered Unacceptable. An Offeror that provides no or sparse past performance information shall be rated “neutral.”

2.3.2.5. In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can reasonably be assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (FAR 15.305(a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.” IAW FAR

Subpart 19.6 Certificates of Competency and Determinations of Responsibility, any Offeror determined “unacceptable” during evaluation of their proposal shall have the matter referred to the SBA Government Contracting Area Office serving the area in which the headquarters of the

Offeror is located for a Certificate of Competency.

Past Performance Acceptable / Unacceptable Ratings

Adjectival Rating Description

Acceptable Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the

Offeror’s performance record is unknown.

Unacceptable Based on the Offeror’s performance record, the Government does not have a reasonable expectation that the Offeror will be able to successfully perform the required effort.

2.3.3. FACTOR 3: PRICE:

2.3.3.1. FIRM FIXED PRICE COEFFICIENT: Offerors are advised that only offers submitted on a firm fixed price coefficient basis will be considered and that offers submitted on other than a firm fixed price coefficient basis will be rejected.

2.3.3.2. The Offeror’s price proposal will be evaluated for reasonableness using price analysis techniques outlined in FAR 15.404-1(b). In the event that a different coefficient is proposed for

Emergency or Accelerated Working Hours, an annual coefficient will be calculated based on a weighted average. The Offeror shall develop its annual coefficient(s) using the following procedure. For purposes of evaluation, the Government will assume that 96% of the work will be done during normal work hours, 1% will be done during emergency work conditions, and 3% will be done under accelerated work conditions.

Bid Schedule Table

Estimated Distribution of Normal, Emergency, and Accelerated Working Hours

(a) (b) (c) (d)

Offeror

Coefficient Proportion

Weighted

Coefficient = a*b Subtotal

Normal Working Hours 96%

Emergency Working Hours 1%

Accelerated Working Hours 3%

Grand Total

2.3.3.3. The Government, for evaluation purposes only, will multiply the weighted coefficient above by $22,000,000 representing estimated bare costs, to arrive at the evaluated price for purposes of determining the low price.

2.3.3.4. Completeness/Accuracy: The Offeror’s proposal complies with paragraph 3.

PROPOSAL FORMAT.

2.3.3.5. Reasonableness: A price is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a prudent person in the conduct of competitive business.

END OF PART II – EVALUATION FACTORS FOR AWARD

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

SECTION 00700 - CONTRACT CLAUSES

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of to be determined at the Task Order level for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/dfars https://www.acquisition.gov/afars

(End of clause)

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

CONTRACT REQUIREMENTS

SECTION 00800 – INSPECTION AND ACCEPTANCE

1. PRE-FINAL AND FINAL INSPECTION

https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/dfars https://www.acquisition.gov/afars

1.1 For each Task Order, the Contractor, Mission and Installation Contracting Command

(MICC), DPW, the customer, and other personnel as necessary (e.g., Fire Department, Safety, Network Enterprise Center (NEC), U.S. Army Medical Department Activity (MEDDAC), Physical Security, and Environmental personnel) will jointly conduct a pre-final inspection prior to the Contractor requesting a final inspection. Any discrepancies noted shall be corrected prior to final inspection. The Contractor’s Quality Control Manager/Inspector shall request the pre-final inspection in writing to the Government at least 10 calendar days before project completion date. (Note: The Government reserves the right to disapprove the request for a pre-final based on known project deficiencies.) The Contracting Officer or COR may schedule more than one pre-final inspection if they determine it necessary. Prior to the pre-final inspection, the

Contractor shall submit the final record drawings to the Contracting Officer or the COR for review and approval (Exhibit A, Data Item No. D006). Prior to a request for pre-final inspection, the Contractor's quality control (QC) representative shall conduct their own inspection and ensure all deficiencies are corrected. The Contractor’s QC representative shall provide a copy of their inspection report to the Government’s inspector with a copy of the status of deficiency correction. If all deficiencies are corrected or deficiencies are minimal, the pre-final inspection may become the final inspection.

1.2. If no deficiencies are noted at the pre-final inspection, the Contracting Officer or COR may deem the pre-final as a final inspection. If a final inspection is necessary and all identified deficiencies have been rectified, the Contractor shall request final inspection in writing to the

Contracting Officer or the COR. The final inspection shall be requested as agreed upon during project negotiations. If the time for the request was not specified during negotiations, then the request shall be submitted a minimum of three work days prior to the desired final inspection date.

1.3. The final inspection will be performed with the Contractor, his subcontractors, DPW, MICC, and the customer. Any discrepancies noted will be corrected within the time specified by the

Contracting Officer and prior to final completion date.

END OF INSPECTION AND ACCEPTANCE

SECTION 00800 – DELIVERIES OR PERFORMANCE

1. CONTRACT PERIOD OF PERFORMANCE: The contract ordering period shall become effective on 1 July 2022 or the date of award, whichever is later, and continue for 12 months thereafter. This contract contains options to extend the term of the contract for four additional

12-month ordering periods (see FAR Clause 52.217-9 “Option to Extend the Term of the

Contract”). This is an IDIQ Contract (see FAR Clause 52.216-22 “Indefinite Quantity”). Task or performance shall be specified in each Task Order issued hereunder. Individual Task Orders shall be issued in accordance with FAR Clause 52.216-19 “Order Limitations”, and Section

00800 ADDITIONAL CONTRACT REQUIREMENTS, Paragraphs 31. ORDERING

PROCEDURES – NORMAL WORK HOURS; 32. ORDERING PROCEDURES -

EMERGENCY WORK CONDITIONS, and 33. ORDERING PROCEDURES –

ACCELERATED WORK CONDITIONS.

2. PHASE IN: The Contractor shall commence any Phase In and familiarization activities prior to actual work on individual Task Orders as soon after the date of contract award as practicable.

However, within 30 calendar days after contract award date the Contractor shall be fully operational and capable of immediately starting work on any required Task Orders.

2.1. WITHIN 10 CALENDAR DAYS AFTER CONTRACT AWARD DATE THE

CONTRACTOR SHALL:

2.1.1. Submit 100% of the annual required Performance and Payment Bonds in accordance with clause 52.228-15, entitled "Performance and Payment Bonds – Construction.

2.1.2. Meet with Contracting Officer and COR to establish the agenda for the post-award conference.

2.2. WITHIN 30 CALENDAR DAYS AFTER CONTRACT AWARD DATE THE

CONTRACTOR SHALL:

2.2.1. Have all critical staff members on site.

2.2.2. Be fully operational and capable of starting work immediately on any required Task

Orders.

2.3. TIME ALLOWED FOR COMPLETION OF TASK ORDERS UNDER ORDERING

PROCEDURES – NORMAL WORK HOURS ONLY.

2.3.1. This formula will be used by the Government and Contractor as a guideline for estimating

Task Order completion time under ADDITIONAL CONTRACT REQUIREMENTS, Paragraph

31. Performance time will be negotiated for each Task Order. The Contractor shall complete all work by the required completion date specified in the Task Order. Where unforeseen conditions cause delays, the completion date may be extended only as negotiated and modified in the Task

Order. Upon Task Order completion and Government acceptance of the work, the Contractor shall complete a final release and submit it with a request for final payment.

2.3.2. This formula is not applicable to ADDITIONAL CONTRACT REQUIREMENTS, Paragraphs 32, ORDERING PROCEDURES - EMERGENCY WORK CONDITIONS, and 33, ORDERING PROCEDURES – ACCELERATED WORK CONDITIONS. Task Order completion time for these conditions will be negotiated by the Contracting Officer before Task

Order award.

2.3.3. The Government has established the following requirements pertaining to the timely completion of Task Orders under ADDITIONAL CONTRACT REQUIREMENTS, Paragraph

31. ORDERING PROCEDURES – NORMAL WORK HOURS. The performance period for any Task Order shall begin as indicated in the Task Order. A Task Order is considered complete upon final acceptance by the Government.

Equation for Completion of Task Orders Under Ordering Procedures – Normal

Work Hours Only (in Calendar Days)

Total Days = 15 + (0.000137 X A) + B + C + D + E + F + G

15 = 5 days for the initiation of the TO and 10 days for the pre-final and final inspections

A = The Task Order price in dollars.

B = The number of Unit Price Book divisions from which the Contractor has drawn line items in pricing the project.

C = 14 days if the project requires new concrete/masonry Construction, or new plaster/drywall installation; otherwise C = 0.

D = 7 days if the Contracting Officer or the COR requires an advance construction notice for occupants; otherwise required then D = 0.

E = Any number of extra days so determined by the Government (prior to the issuance of the Task Order necessary for the proper execution of the work when extraordinary circumstances are present). Under most normal circumstances E =

0. Extraordinary circumstances, which may prompt the Government to allow extra days, include the following:

- testing and evaluation of work site conditions that require extra days;

- documented unavailability of materials/equipment;

- the existence of Government activities that may delay work in/around the work site;

- full compliance with any applicable law, regulation/safety requirement that will require extra days beyond the number of days allowed by other elements of the equation;

- extensive utilities coordination is required; or

- the Contracting Officer has determined that allowing extra days will be in the best interest of the Government.

F = 10 days if an approved Excavation Permit is required; otherwise F = 0.

G = 15 days if an approved Electrical Outage is required; otherwise G = 0.