Detailed Pricing Schedule
| W911S2-19-B-8002 Traffic Control Painting, Airfield | |||||
| CONTRACT PERIOD WORK | 60-Month Ordering Period | ||||
| The Contractor shall provide all supervision, plant, labor, material and equipment necessary to perform all operations in connection with the painting, removal and repainting of traffic control lines, warnings, and guides within the Wheeler-Sack Army Airfield (WSAAF) on Fort Drum, NY in accordance with the Statement of Work, specifications and drawings, and subject to the terms and conditions of the contract, for the period 01 June 2019 through 31 May 31 2024. | |||||
| ITEM | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | ESTIMATED AMOUNT |
| 0001 | Provide all supervision, plant, labor, material and equipment necessary to perform all operations in connection with the painting, removal and repainting of air traffic control lines, warnings, and guides within Wheeler-Sack Army Airfield (WSAAF), on Fort Drum, NY in accordance with the Statement of Work, specifications and drawings, and subject to the terms and conditions of the contract. Work shall include all runways, taxiway, tow-lanes, aprons, ramps, compass pad, hot pads, deicing pads, keyhole, Oasis, and base operations areas to provide 100% painting or repainting of all airfield pavements within the restricted area of WSAAF. Pavement markings shall include, but are not limited to, threshold markings, displaced threshold markings, centerlines, edge lines, hold short lines, rotary-wing runway designator, azimuth designation, helipad markings, deceptive surface shoulder markings, compass calibration pad markings, overruns, parking stop bars, taxi lanes, apron boundary marking, obstruction clearance lines, touchdown zone markings, fixed distance aiming point markings, tied down and grounding point markings, aircraft parking and vehicle parking stalls. The anticipated contract will be a firm fixed price contract with one (1), 60-month ordering period, running from approximately 01 July 2019 through 31 May 2024. | 5 | EA | $ - 0 | $ - 0 |
| T1 | CLIN 0001 TOTAL (CLIN 0002: ELINs 0002-1 through 0002-18), TOTAL WORK within Wheeler-Sack Army Airfield (WSAAF), Fort Drum, NY | $ - 0 | |||
| 0002 | W911S2-19-B-8002 TRAFFIC CONTROL PAINTING REQUIREMENTS(All Other Work): Provide all supervision, plant, labor, material and equipment necessary to perform all operations in connection with the painting, removal and repainting of air traffic control lines, warnings, and guides within Wheeler-Sack Army Airfield, Fort Drum, New York, in accordance with the Statement of Work, specifications and drawings, and subject to the terms and conditions of the contract. The anticipated contract will be a firm fixed price contract with one (1), 60-month ordering period, running from approximately 01 July 2019 through 31 May 2024. | ||||
| 0002-1 | Paint and/or re-paint all airfield pavement markings for Runway 15-33(Reference Attachment 1, drawing WSAAF-001) | 1 | EA | $ - 0 | $ - 0 |
| 0002-2 | Paint and/or re-paint all airfield pavement markings for Runway 03-21(Reference Attachment 1, drawings WSAAF-002 through WSAAF-004) | 1 | EA | $ - 0 | $ - 0 |
| 0002-3 | 1) Paint and /or re-paint all airfield pavement markings for Runway 08-26(Reference Attachment 1, drawing WSAAF-005) | 1 | EA | $ - 0 | $ - 0 |
| 0002-4 | Paint and/or re-paint all airfield markings for Runway 06-24(Reference Attachment 1, drawing WSAAF-006) | 1 | EA | $ - 0 | $ - 0 |
| 0002-5 | Paint and /or re-paint all airfield markings for Taxiway "B"(Reference Attachment 1, drawing WSAAF-007) | 1 | EA | $ - 0 | $ - 0 |
| 0002-6 | Paint and /or re-paint all airfield markings for Taxiway "C"(Reference Attachment 1, drawing WSAAF-008) | 1 | EA | $ - 0 | $ - 0 |
| 0002-7 | Paint and/or re-paint all airfield markings for Taxiway "F"(ReferenceAttachment 1, drawing WSAAF-009) | 1 | EA | $ - 0 | $ - 0 |
| 0002-8 | Paint and/or re-paint all airfield markings for Taxiway "G"(ReferenceAttachment 1, drawing WSAAF-010) | 1 | EA | $ - 0 | $ - 0 |
| 0002-9 | Paint and/or re-paint all airfield markings for Taxiway "J"(ReferenceAttachment 1, drawings WSAAF-011 through WSAAF -013) | 1 | EA | $ - 0 | $ - 0 |
| 0002-10 | Paint and/or re-paint all airfield markings for Oasis Area (ReferenceAttachment 1, drawing WSAAF-014) | 1 | EA | $ - 0 | $ - 0 |
| 0002-11 | Paint and/or re-paint all airfield markings for South Ramp Area (Reference Attachment 1, drawing WSAAF-015) | 1 | EA | $ - 0 | $ - 0 |
| 0002-12 | Paint and/or re-paint all airfield markings for Base Ops Ramp (ReferenceAttachment 1, drawing WSAAF-016) | 1 | EA | $ - 0 | $ - 0 |
| 0002-13 | Paint and/or re-paint all airfield markings for North Ramp (Reference Attachment 1, drawings WSAAF-017 and WSAAF-018) | 1 | EA | $ - 0 | $ - 0 |
| 0002-14 | Paint and/or re-paint all airfield markings for Mountain Ramp (Reference Attachment 1, drawing WSAAF-019) | 1 | EA | $ - 0 | $ - 0 |
| 0002-15 | Paint and/or re-paint all airfield markings for De-Icing Pad (Reference Attachment 1, drawing WSAAF-020) | 1 | EA | $ - 0 | $ - 0 |
| 0002-16 | Paint and/or re-paint all airfield markings for West Ramp Area (Reference Attachment 1, drawing WSAAF-022) | 1 | EA | $ - 0 | $ - 0 |
| 0002-17 | Paint and/or re-paint all airfield markings for Compass Base (Reference Attachment 1, drawing WSAAF-021) | 1 | EA | $ - 0 | $ - 0 |
| 0002-18 | Paint and/or re-paint all airfield markings for TUAV Area (Reference Attachment 2, drawings WSAAF-023 thru WSAAF-024 TUAV Area) | 1 | EA | ||
| 0002-19 | Remove and re-paint all airfield pavements markings for Runway 15-33(Reference Attachment 1, drawing WSAAF-001) | 1 | EA | $ - 0 | $ - 0 |
| 0002-20 | Remove and re-paint all airfield pavements markings for Runway 03-21(Reference Attachment 1, drawings WSAAF-002 through WSAAF-004) | 1 | EA | $ - 0 | $ - 0 |
| 0002-21 | Remove and re-paint all airfield pavements markings for Runway 08-26(Reference Attachment 1, drawing WSAAF-005) | 1 | EA | $ - 0 | $ - 0 |
| 0002-22 | Remove and re-paint all airfield markings for Runway 06-24(Reference Attachment 1, drawing WSAAF-006) | 1 | EA | $ - 0 | $ - 0 |
| 0002-23 | Remove and re-paint all airfield markings for Taxiway "B"(Reference Attachment 1, drawing WSAAF-007) | 1 | EA | $ - 0 | $ - 0 |
| 0002-24 | Remove and re-paint all airfield markings for Taxiway "C"(Reference Attachment 1, drawing WSAAF-008) | 1 | EA | $ - 0 | $ - 0 |
| 0002-25 | Remove and re-paint all airfield markings for Taxiway "F"(Reference Attachment 1, drawing WSAAF-009) | 1 | EA | $ - 0 | $ - 0 |
| 0002-26 | Remove and re-paint all airfield markings for Taxiway "G"(Reference Attachment 1, drawing WSAAF-010) | 1 | EA | $ - 0 | $ - 0 |
| 0002-27 | Remove and re-paint all airfield markings for Taxiway "J"(Reference Attachment 1, drawings WSAAF-011 through WSAAF -013) | 1 | EA | $ - 0 | $ - 0 |
| 0002-28 | Remove and re-paint all airfield markings for Oasis Area (Reference Attachment 1, drawing WSAAF-014) | 1 | EA | $ - 0 | $ - 0 |
| 0002-29 | Remove and re-paint all airfield markings for South Ramp Area (Reference Attachment 1, drawing WSAAF-015) | 1 | EA | $ - 0 | $ - 0 |
| 0002-30 | Remove and re-paint all airfield markings for Base Ops Ramp (Reference Attachment 1, drawing WSAAF-016) | 1 | EA | $ - 0 | $ - 0 |
| 0002-31 | Remove and re-paint all airfield markings for North Ramp (Reference Attachment 1, drawings WSAAF-017 and WSAAF-018) | 1 | EA | $ - 0 | $ - 0 |
| 0002-32 | Remove and re-paint all airfield markings for Mountain Ramp (Reference Attachment 1, drawing WSAAF-019) | 1 | EA | $ - 0 | $ - 0 |
| 0002-33 | Remove and re-paint all airfield markings for De-Icing Pad (Reference Attachment 1 drawing WSAAF-020) | 1 | EA | $ - 0 | $ - 0 |
| 0002-34 | Remove and re-paint all airfield markings for West Ramp Area (Reference Attachment 1, drawing WSAAF-022) | 1 | EA | $ - 0 | $ - 0 |
| 0002-35 | Remove and re-paint all airfield markings for Compass Base (Reference Attachment 1, drawing WSAAF-021) | 1 | EA | $ - 0 | $ - 0 |
| 0002-36 | Remove and re-paint all airfield markings for TUAV Area (Reference Attachment 2, drawings WSAAF-023 thru WSAAF-024 TUAV Area) | 1 | EA | ||
| T2 | CLIN 0002 TOTAL (ELINs 0002-1 through 0002-36), TOTAL WORK at WSAAF, FORT DRUM, NY | $ - 0 | |||
| T3 | TOTAL of CLINs 0001 and 0002, TOTAL WORK, ALL AREAS | $ - 0 |
| T4 | CLIN 0003 TOTA ESTIMATED PERFORMANCE AND PAYMENT BONDS | 1 | BR | 0.00 | $ - 0 |
| T5 | TOTAL CONTRACT PRICE, CLINs 0001 through 0003 | $ - 0 | |||
| NOTES TO BIDDERS: |
| 1. THIS DETAILED PRICING SCHEDULE MUST BE COMPLETED IN EXCEL FORM. MANUAL CALCULATIONS WILL NOT BE ACCEPTED. |
| 2. ENTER UNIT PRICES ONLY FOR WORK LINE ITEMS (highlighted yellow). ESTIMATED AMOUNTS ARE CALCULATED BY MULTIPLYING QUANTITY BY UNIT PRICES. THESE FIELDS CANNOT BE ALTERED. |
| 3. ENTER CONTRACTOR BONDING RATE ONLY IN THE UNIT PRICE FIELD (highlighted blue). ESTIMATED BONDING COSTS ARE CALCULATED BY MULTIPLYING THE TOTAL WORK ESTIMATE BY THE BONDING RATE. |
| 4. PLEASE CARRY THE TOTALS FORWARD TO THE APPLICABLE CLINS IN THE SOLICITATION LOCATED ON PAGES 3 AND 4. |
| 5. THE FOLLOWING UNIT ABBREVIATIONS ARE DEFINED AS FOLLOWS: |
| EA Each |
| LF Linear Feet |
| CLF Hundred Linear Feet |
| BR Bonding Rate |