CDRLs_D001-D004(draft).pdf

PDF 271 KB Posted

Attached to
Asphalt Maintenance/Repairs Federal contract opportunity
Solicitation number
W911S2-19-B-8000
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Drum

About this file

CDRL D001-D004 Draft

View the file

Other files for this federal contract opportunity

Other files attached to Asphalt Maintenance/Repairs, newest first.
File Type Posted
CDRLs_D013-D016(draft).pdf PDF
CDRLs_D009-D012(draft).pdf PDF
Asphalt_Maintenace-Repairs_SOW(draft).pdf PDF
CDRLs_D005-D008(draft).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423, AUG 96

CONTRACT DATA REQUIREMENTS LIST

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.

DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;

Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423 (BACK), AUG 96

addr1_1: KO
draft1_1:
reg1_1:
repro1_1: 1
addr1_2: Con Rep
draft1_2:
reg1_2: 1
repro1_2:
addr1_3:
draft1_3:
reg1_3:
repro1_3:
draft2_1:
addr2_1: CON REP
addr2_2:
reg2_1: 1
repro2_1:
addr2_3:
draft2_3:
reg2_3:
repro2_3:
addr3_1: Contracting Officer
addr3_2: DPW ENV DIV
addr3_3:
draft3_1:
reg3_1: 1
repro3_1:
draft3_2:
reg3_2: 1
repro3_2:
draft3_3:
reg3_3:
repro3_3:
addr4_1: COR
draft4_1:
reg4_1: 1
repro4_1:
addr4_2:
draft4_2:
reg4_2:
repro4_2:
addr4_3:
draft4_3:
reg4_3:
repro4_3:
draft2_2:
repro2_2:
reg2_2:
line_item: TBD
exhibit: D
xtdp: Off
xtm: Off
othercat: X
system: ASPHALT
ctr_no: W911S2-16-B-8000
contr: TO BE DETERMINED
data_item1: D001
title1: SCHEDULE OF OPERATIONS
sub1: N/A
auth1: N/A
ref1: SOW PARAGRAPH 5
req_ofc1: DPW ENGINEERING/CONS DIV
dd250_1: N/A
appcode1: N/A
dist1: SEE ITEM 16
freq1: AS REQ
asof1: 10 DAYS
firstsub1: SEE ITEM 16
subsub1: SEE ITEM 16
group1:
totalprice1:
rmks1: The Contractor shall submit a schedule of proposed operations to the Contracting Officer and Construction Representative (Con Rep) for approval within 10 days of the issuance of a Task Order.
totaldraft1: 0
totalreq1: 1
totalrepro1: 1
data_item2: D002
title2: DAILY QUALITY CONTROL REPORTS
sub2: N/A
auth2: N/A
ref2: SOW PARAGRAPH 27
req_ofc2: DPW ENGINEERING/CONS DIV
dd250_2: N/A
appcode2: N/A
dist2: SEE ITEM 16
freq2: DAILY
asof2: SEE ITEM 16
firstsub2: SEE ITEM 16
subsub2: SEE ITEM 16
rmks2: Daily QC reports will be in electronic PDF fill in format and sent to the Con Rep/Project Manager by 1000 hours the following business day of work performed.
group2:
totalprice2:
totaldraft2: 0
totalreg2: 1
totalrepro2: 0
data_item3: D003
title3: WASTE MANAGEMENT PLAN
sub3: N/A
auth3: N/A
ref3: SOW PARAGRAPH 29
req_ofc3: DPW ENVIRONMENTAL DIV
dd250_3: N/A
appcode3: N/A
dist3: N/A
freq3: AS REQ
asof3: 30 DAYS
firstsub3: SEE ITEM 16
subsub3: SEE ITEM 16
rmks3: IAW with Specification Section 017419, Construction and Demolition Waste Management, prior to initiation of site preparation work, a waste management plan shall be submitted to the KO for Government review and approval within 30 days after award.
group3:
totalprice3:
totaldraft3: 0
totalreg3: 2
totalrepro3: 0
data_item4: D004
title4: EXCAVATION PERMIT
sub4: FORT DRUM FORM 555
auth4: N/A
ref4: SOW PARAGRAPH 14
req_ofc4: DPW ENGINEERING/CONSTR DIV
dd250_4: N/A
appcode4: N/A
dist4: N/A
freq4: AS REQ
asof4: AS REQ
firstsub4: AS REQ
subsub4: AS REQ
rmks4: The Contractor shall execute, route and obtain the required permit approvals/signatures listed on the blank Excavation Permit form, following the Notice to Proceed and prior to any mobilization, construction or excavation.
group4:
totalprice4:
totaldraft4: 0
totalreg4: 1
totalrepro4: 0
prep_by: Emily B. Gunter, Contract Specialist
2016-04-08T10:26:34-0400
GUNTER.EMILY.BROOKE.1366843864
prep_date:
app_by: Cindy McAleese, Contracting Officer
2016-04-08T13:20:05-0400
MCALEESE.CINDY.L.1299508230
app_date: 4/8/2016
Page: 1
pages: 4
app: Adobe Professional 8.0
Reset:

File details come from the government source that posted it.