STATEMENT OF WORK

FOR

AGRICULTURE LEASE MAINTENANCE PROGRAM

Fort Riley, KS

21 June 2019

Table of Contents:

1.0 ………. Background

2.0 ………. Description of Services

3.0 ………. Requirements

4.0 ………. Delivery Schedule

5.0 ………. Period of Performance

6.0 ………. Place of Performance

7.0 ………. Program Management

8.0 ………. Publications

9.0 ……... Attachments

1.0 BACKGROUND: The purpose of this requirement is to maintain land that is owned by Fort

Riley and leased to tenants for agricultural purposes. The contractor shall be responsible for furnishing all labor, supervision, tools, materials, equipment, and transportation necessary to maintain the agricultural conservation structures (terrace and waterways), agricultural lease access roads, and provide miscellaneous renovation services to agricultural leased parcels.

2.0 DESCRIPTION OF SERVICES: The Contractor shall plan, program, coordinate, estimate, and schedule for all levels of work as specified in order to maintain agricultural conservation structures (terrace and waterways), agricultural out lease access roads and provide emergency renovation services in accordance with all attached specifications and additional specifications of each Task Order issued.

2.1 Inspection of Conservation Structures:

2.1.1 Upon notification from the Contracting Officer Representative (COR), the

Contractor shall inspect the conservation structures (terraces and waterways) in the firebreak crop leases designated for that year (see section 2.2.3 “Rotation

Table”). The Contractor shall inspect the conservation structures IAW the standards set forth in attachment 2 and 3 of this SOW date 21 June 2019. The

Contractor shall provide the COR a list of structures to be repaired within 10 calendar days of the notification.

2.1.2 The Contractor shall inspect each terrace to ensure it is up to the standards specified in attachment 3 of this SOW dated 21 June 2019. This include verifying it is draining properly and has crown that will not allow water to spill over. Any terraces that are not draining properly or has a crown that is too low for the location shall be listed for repair for the year.

2.1.3 The Contractor shall inspect waterways to assure the water is allowed to discharge and brush and trees are not impeding water flow which may cause debris build-up.

2.2 Conservation Structure Maintenance: The Contractor shall review and repair the specified structures in the designated lease areas in between normal crop cycles. Work is anticipated to take place from November through April of each contract year. This timeframe may fluctuate based on the actual crop cycle for each year.

2.2.1 Once the Notice to proceed has been issued, the Contractor shall repair the structures listed to assure they perform their appropriate function. The contractor shall ensure all repairs are completed IAW the standards specified in attachment 3 of this SOW dated 21 June 2019.

2.2.2 The Government estimates the annual workload requirements to be approximately 4 hours to survey the structures and 26 hours to repair structures annually. Maps of each firebreak lease are provide in Attachment 1. Specification and general information regarding waterways and terraces are located in attachment 2 and 3.

2.2.3 Rotation Table:

Contract Year- Period of Performance Leases to Maintain

1- 1 August 2019 to 31 July 2020* Leases 5 & 9

2- 1 August 2020 to 31 July 2021* Leases 7 & 8

3- 1 August 2021 to 31 July 2022* Leases 1 & 6

4- 1 August 2022 to 31 July 2023* Leases 2, 3, & 4

5- 1 August 2023 to 31 July 2024* Leases 5 & 9

*The period of performance may change based on date of contract award.

2.3 Agricultural Outlease Access Road Maintenance: The Contractor shall maintain the designated access roads in between normal crop cycles. Approximate dates are between 1 November and 1 April of each year.

2.3.1 The Contractor shall maintain the designated access roads by grading them to maintain an appropriate crown, fill-in ruts, and maintain adequate drainage.

This work shall be completed IAW the specifications in attachment 4 of this SOW dated 21 June 2019. See Attachments 4, 5a, 5b, and 5c for access road locations and specifications.

2.3.1.1 Most of the roads are between 500 to 700 feet, either field entrances or connector roads. Approximately half are natural surface and half are graveled at this time, see attachments 5a and 5b.

2.3.1.2 Additional access road construction, with distance not to exceed 1 mile, is expected to be completed during the term of this contract. The

Contractor may be asked to add the additional distance upon completion.

2.3.1.3 Access to most of the roads are via minimum maintenance township roads. The Contractor shall take care not to damage the township roads when travelling to/from the access roads. The contractor shall be liable for any damage they cause to the township roads.

2.4 Additional Renovation Services: The Contractor shall complete all work as specified with in each Task Order issued by the Contracting Officer. Additional

Renovation Services include those services already identified within the Statement of

Work, additional work for safety identified by the Conservation Branch, and miscellaneous tasks to improve access to agricultural lessees and adjacent areas.

Examples of Additional Renovation work include, but are not limited to, repairing four

(4) terraces destroyed by military equipment during maneuvers, repair to a low-water crossing damaged due to high, fast moving water, removal of debris from flooding in firebreak fields, closure of open wells, and repair of culverts.

2.4.1 Once a Statement of Work for Additional Renovation Services has been received, the Contractor shall submit to the Contracting Officer (KO) and

Contracting Officer’s Representative (COR) a priced proposal to complete all work specified in the SOW. The proposal shall be provided to the COR within 10 calendar days of the request. The priced proposal shall consider the requested deadline for the period of performance for the task order.

2.4.2 The KO and the COR will review the Contractor’s proposal to determine price reasonableness and technical acceptability and may issue a Task Order or request further cost breakdown, discussions, negotiation or order cancellation of the request. If the Contractor’s proposal is determined to be fair and reasonable, and technically acceptable the Contracting Officer may issue a Task Order for the

Additional Renovation Work described within the Contractor’s proposal. If the

Contractor’s proposal cannot be determined as fair, reasonable, or technically acceptable the Government may cancel the request.

2.4.3 Upon issuance of the Notice to Proceed (NTP) for each Task Order, the

Contractor shall submit to the COR a separate schedule that reflects the

Additional Renovation Task Order’s timeline from NTP to completion. The

Contractor shall acknowledge receipt of request for proposal thereby initiating the start of Contractor reaction times for submission of Contractor proposal.

3.0 REQUIREMENTS

3.1 Contractor provided equipment and personnel:

3.1.1 Equipment: The Contractor shall provide and maintain all vehicles and equipment required to fulfill the terms of the contract. All vehicles and equipment, shall be in an operable condition and meet all Federal, State, and local safety requirements, and shall comply with EM 385-1-1 (Section 19), Safety and

Health Requirements Manual. All vehicles shall be equipped with an operating audible back-up alarm. The alarm shall be an electronic unit activated when the vehicle is placed in reverse. The Contractor shall provide and maintain a fire extinguisher on each vehicle. All vehicles and equipment shall not leak oil, transmission fluid or hydraulic fluids while in operation. The Contractor shall remove from service, within one hour of notification by the KO, non-acceptable vehicles and equipment not meeting the above requirements. Repair or replacement of the vehicle or equipment shall be at the Contractor's expense.

Inoperable or unserviceable equipment or vehicles shall not be cause for the

Contractor to reduce any service or performance. No major repairs shall be accomplished on Contractor owned vehicles and/or equipment on the installation.

3.1.2 Specific Equipment Requirements: The Contractor's supplied vehicles, and equipment utilized under the contract, shall be registered, licensed and insured in the State where the Contractor is licensed prior to being operated under the contract. Operators of equipment and vehicles shall possess a valid state operator's permit to operate Contractor furnished vehicles and / or equipment for work under the contract.

3.1.3 Identification of Vehicles and Equipment: The Contractor shall maintain legible markings located on both sides of all Contractor furnished vehicles and equipment, which shall include, as a minimum, the Contractor's business name

(letter height shall be at least 3 inches), and Contractor assigned identification number if any (letter height shall be at least 3 inches).

3.1.4 Insurance: The Contractor shall provide the KO, evidence of the minimum insurance coverage listed below. Contractor shall not begin performance without proof of insurance provided to the KO. All coverage shall be maintained throughout the contract period. All subcontracts shall provide the same coverage.

The minimum insurance limits are:

3.1.4.1 Statutory worker's compensation and employer's liability insurance (as applicable): $100, 000 or as prescribed by The State of Kansas, whichever is greater

3.1.4.2 General liability: A minimum of $500,000 per occurrence for bodily injury liability insurance

3.1.4.3 Vehicle liability (comprehensive): A minimum of $200,000 per person and $500,000 per occurrence for bodily injury. A minimum of

$20,000 per occurrence for property damage. Bodily injury liability and property damage liability shall cover the operation of all automobiles, trucks, vehicles and other mobile equipment used in connection with the performance of the contract.

3.2 Quality Control: The Contractor shall develop and maintain a quality control program to ensure all services are performed in accordance with commonly accepted commercial practices and meet the requirements of this SOW dated 21 June 2019. The

Contractor shall develop a Quality Control (QC) Plan and implement procedures to identify, prevent, and eliminate recurrence of defective services. The plan shall specifically address the Contractor’s strategy to provide quality workmanship, continual process improvement and correction of deficiencies, as required. The Contractor shall upon request provide to the Government their quality control documentation.

3.2.1 QC Inspection System: The Contractor shall submit to the Contracting

Officer for approval, at or before the Post Award Conference, the Inspection

System (Contractor Quality Control (CQC)) with which he proposes to implement the requirements of Contract Clause: “INSPECTION OF SERVICES-–FIXED-

PRICE (AUG 1996)”, 52.246-4. The plan shall identify personnel, procedures, instructions, records, and forms to be used. If the Contractor fails to submit an acceptable QC Plan within the time herein prescribed, the Contracting Officer may refuse to allow performance to start until such time as the Contractor submits an acceptable final plan. Failure by the Contractor to execute the accepted

Quality Control Plan during the contract period may also result in delaying payment until such unacceptable services rendered are corrected and the

Contractor complies with the approved QC Plan.

3.2.2 Acceptance of Plan: Acceptance of the Contractor’s plan is required prior to start of performance. Acceptance is conditional and will be predicated on satisfactory performance during the contract. The Government reserves the right to require the Contractor to make changes in his CQC plan and operations as necessary to obtain the quality specified.

3.2.3 Notification of Changes: After acceptance of the QC plan, the Contractor shall notify the KO in writing of any proposed changes. Proposed changes are subject to acceptance by the KO.

3.2.4 CQC System Management: Given the complexity of the required tasks involved in the execution of this SOW, the Government will allow the Project

Manager (PM) to perform duties as the QC Manager for the Contractor. The

Contractor’s QC/PM shall be available to interact with the COR and the Quality

Assurance Evaluator (QAE) daily (if needed) for quality concerns. The appointment of the QC/PM is subject to the approval of the Contracting Officer and shall be changed if the appointee is unable or unwilling to perform their duties as prescribed.

3.2.5 Submittals: The QC/PM shall be responsible for certifying that all required submittals are in compliance with the contract requirements. See section 4.0 of this SOW dated 21 June 2019 for required submittals.

3.2.6 Quality Control Standard

3.2.6.1 Conservation Structure Maintenance: Terraces and waterways shall be renovated to assure proper water flow.

3.2.6.2 Agricultural Outlease Access Road Maintenance: Access roads shall be graded to maintain a crown and allow water to properly drain away from the road to the closest drainage structure.

3.2.6.3 Additional Renovation Services: The work shall be completed within the allowable timeframe and in accordance with (IAW) section 2.4 of this statement of work dated 21 June 2019.

3.3 Safety Requirements: The Contractor shall conduct all work in a safe manner, and in compliance with the Occupational Safety and Health Act (OSHA), the Safety and

Health Requirements Manual EM 385-1-1, and Federal, State and Army requirements.

The Fort Riley Safety Office shall verify that these regulations and standards are met.

Each item of equipment or property furnished under this contract shall be in safe operational condition and shall comply with all Federal Safety Standards, the American

National Standards, and all State Safety Regulations applicable to the equipment and or property. The Contractor shall submit a Safety Plan for approval by the COR during the

Post Award Conference. Due to live fire restrictions, air and ground delivered munitions, UXO risk, high operational TEMPO of aviation and ground forces, and other safety requirements, access to the training areas will be controlled by the Contracting Officer

Representative (COR). Generally speaking, Contractors will be given access once daily and only during daylight hours. Additional access will be by exception only based on training necessity, and only at the discretion of the COR. Contractors will not be allowed access during hours with limited visibility unless preapproved by the COR. If the

Contractor fails, or refuses, to promptly comply with safety requirements, the Contracting

Officer may issue an order stopping part or all of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made the subject of claim for extension of time or for excess costs or damages to the

Contractor.

3.3.1 Accident Prevention Plan: The Contractor shall prepare an Accident

Prevention Plan and submit for approval to the Contracting Officer at the post award conference. The plan shall contain the name of the contractor’s organization, contract number and a brief description of the work and an onsite safety manager during work performance. The plan shall outline the responsibilities of each employee to comply with applicable safety and occupational health requirements, wearing prescribed safety and health equipment, reporting unsafe conditions/activities, preventing avoidable accidents and working in a safe manner. The plan shall identify the policies and procedures regarding noncompliance with safety requirements to include disciplinary actions for violation of safety requirements.

3.3.2 EM 385-1-1: The contractor may obtain a copy of the U.S. Army Corps of

Engineers Safety and Health Requirements Manual, EM 385-1-1, from the U.S.

Government Printing Office, the stock number is 008-022-00281-2 or from the

Internet at www.usace.army.mil. The manual may be ordered by telephone at

202-512-2457 utilizing a Visa or Master Card or by mail utilizing a check or money order. The mailing address is:

Superintendent of Documents

P.O. Box 371954

Pittsburgh, PA 1520-7954

3.3.3 Contract Safety Brief: Prior to the start of contract work, the contractor shall meet with representatives of Fort Riley’s Department of Public Works (PW), the contracting office, installation safety manager, and mission safety office to discuss and develop a mutual understanding about the administration of the overall safety program. The Contractor’s safety brief shall be attended by the

Contracting Officer or Administrator, COR and ACOR, and the contractor’s authorized representative and shall, include the following:

a. Contractor project superintendents

b. Supervisors

c. Quality control

d. Safety

e. Subcontractors

f. KO’s QA/Safety representative http://www.usace.army.mil/

g. Outside organizations that may interact with or be affected by the contractor’s work to include but limited to the following: fire/emergency personnel, security, adjacent facility/process managers.

3.4 Spillage: Standard industry practices shall be utilized in avoiding adverse environmental impact. Contractors shall comply with all public laws and the Fort Riley, Environmental Management Plan (EMP). The current version of the EMP will be supplied to the awardee at the post award conference. Should a spill occur, the Contractor shall clean the area contaminated by the spillage. The Contractor shall also report the type and kind of spill and contact the Department of Public Works Environmental Office.

The Spills Coordinator may be contacted at 785-210-8866. The Contractor is liable for all costs associated with clean-up of any spills (POL, solvents, waste water, battery acids, paints, lubricants, refrigerant oils, hydraulic fluids, anti-freeze, and septage etc). Any spilled chemicals must be cleaned up in accordance with all Federal, State, and local laws, ordinances and regulations. Contractor shall submit a spillage cleanup plan to the

KO at the Post Award Conference for approval.

3.5 Contracting Officer Representative (COR): The COR will be identified by a separate letter and provided to the contractor at the Post Award Conference. The COR monitors all requirements of the contract and assists in contract administration. The COR is authorized to perform the following functions:

a. assure that the Contractor performs the requirements of the contract;

b. perform inspections necessary in connection with contract performance;

c. maintain written and oral communications with the Contractor concerning technical aspects of the contract;

d. issue written interpretations of technical requirements, including Government drawings, designs, and specifications;

e. notify both the Contracting Officer and Contractor of any deficiencies;

f. provides site entry for Contractor personnel.

A letter of designation is issued to the COR, and specified the responsibilities and limitations of the COR, to include the COR’s role in changes in cost or price, and the period of performance. The KO will provide a copy of the COR designation letter to the contractor at the Post Award Conference.

The COR is not authorized to change any of the terms and conditions of the resulting order.

3.6 Supervision of Contractor Employees: The Contractor shall provide a sufficient number of qualified personnel to perform the requirements of this contract. The

Contractor shall not hire off-duty government civilian employees or military personnel where their employment may interfere with their official duties or where the appearance of a conflict of interest exists. The Contracting Officer (KO) will prior approve in writing the employment of any Department of Defense employee. The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the

Contractor, not the Government. The Contractor, in turn, shall be accountable to the

Government for Contractor or subcontractor employees.

3.7 Contractor Training Requirements:

3.7.1 AT Level I Training: This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT

Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable and annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel.

AT level I awareness training is available at the following website:

https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam

3.7.2 OPSEC Standing Operating Procedure/Plan/Training: Per AR 530-1

Operations Security, the contractor employees must complete Level I OPSEC

Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter. OPSEC Awareness for Military

Members, DoD Employees and Contractors is available at the following website:

http://www.cdse.edu/catalog/operations-security.html

3.7.3 IWATCH Training: The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR

NLT 30 calendar days after contract award.

3.7.4 Access and General Protection/Security Policy and Procedures:

Contractor and sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency

Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity

Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

3.7.4.1 Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National

Crime Information Center Interstate Identification Index (NCIC-III) and

Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-

13), applicable installation, facility and area commander installation/facility access and local security policies and procedures

(provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

3.7.5 For all contractors with security clearances. Per AR 381-12 Threat

Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in

2-4b of AR 381-12.

3.8 Contractor Manpower Reporting (CMR):

3.8.1 The Contractor shall report all Contractor manpower (to include

Subcontractor manpower) employed for the performance of this contract. The

Contractor shall complete all required fields in the reporting system using the web address: http://cmra.army.mil. The COR will assist the Contractor with the reporting requirement as necessary. If the Contractor is experiencing difficulties registering in the CMR website, an Excel spreadsheet can be obtained from

Contractormanpower@hqda.army.mil and completed by the Contractor (one row for each contract). The completed spreadsheet can be sent to Contractormanpower@hqda.army.mil and the data will be input into the application. The Contractor may enter reports at any time during the reporting period, which is defined as the contract's period of performance not to exceed 12 months ending 30 September of each Government fiscal year. Reporting must be completed no later than 31 October following the fiscal year during which the contract is in place. Reporting must be completed for every year or part of a year for which the contract is in place. Failure to comply with this reporting requirement will result in contract termination.

3.8.3 As part of its submission, the Contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement.

3.9 Emergency Services

3.9.1 Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor. In cases involving the potential loss of life and / or limb, the Contractor may use the Irwin Army Hospital Emergency room for emergency treatment. The Contractor employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The

Contractor will, in turn, notify the KO or COR within 30 minutes of the incident.

4.0 DELIVERY SCHEDULE:

Paragraph

Reference

Deliverable Frequency Due Date http://cmra.army.mil/ mailto:contractormanpower@hqda.army.mil mailto:contractormanpower@hqda.army.mil

5.0 PERIOD OF PERFORMANCE: The period of performance for this statement of work is 60 months.

6.0 PLACE OF PERFORMANCE: The primary place of performance shall Fort Riley, KS.

Attachments 1, 5a, 5b, and 5c details the places of performance the contractor will be responsible for servicing. The Government will specify the exact place of performance for each issued task order by means of map location, UTM (Universal Transverse Mercator) coordinates, narrative site identification, and/or flagging of site area prior to the start of work.

7.0 PROGRAM MANAGEMENT: The Contractor shall designate a Project Manager (PM) as its on-site representative or another employee authorized to make binding decisions on the behalf of the Contractor. The Program manager (PM) shall be responsible for administering and delivering the services required and for maintaining communications with the Contracting

Officer (KO) and the COR for the duration of the contract period. The PM or alternate shall be available between of 8:00 a.m. to 4:00 p.m. Monday through Friday except Federal holidays or when the government facility is closed for administrative reasons.

7.1 The PM shall be able to read and write English, to interpret basic maps, read and apply Universal Transverse Mercator (UTM) coordinates in order to properly complete the scope of work for this contract. The PM shall have at least five (5) years of experience in the work described in this SOW.

7.2 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the

3.1.4 Certificate of

Insurance

Annual Post award conference and prior to the execution of any option years.

3.2 Quality Control

Plan

1 time Post award conference and IAW 3.2.3

3.3 Safety Plan 1 time Post award conference

3.3.1 Accident

Prevention Plan

1 time Post award conference

3.4 Spillage 1 time Post award conference

3.7.1 AT Level 1

Training

Annual 30 calendar days after contract start date

3.7.2 OPSEC Training Annually 30 days after contract award

3.7.3 iWatch Training 1 time 30 days after contract award

2.1.1 Conservation

Inspection Report

As

Requested

10 calendar days

2.3 Task Order

Priced Proposal

As

Requested

10 Calendar days

7.3 Completion

Notice

As

Required

2 days after work is completed

3.2 Accident/Incident

Report

As

Required

As Required

Contractor's performance. At these meetings the Contracting Officer will apprise the

Contractor of how the government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

7.3 Completion Notifications, Final Inspections and Documents: The PM shall prepare and submit to the COR a completion notice NLT two working days after the work is completed.

The PM and the Government shall perform a joint final inspection after Government receipt of the completion notice and before Government acceptance of the work and final payment.

8.0 PUBLICATIONS: The Contractor is advised that all requirements listed and referenced in this document are mandatory. All current U.S. Army Publications will be made available for examination at the Conservation Branch, DPW, Bldg 407, and Fort Riley, Kansas.

Department of the Army Publications

AR 385-10 Army Regulation Safety

AR 200-1 Environmental Protection and Enhancement

AR 385.40 Army Accident Investigations and Reporting

Combined Federal Regulations

29 CFR, Part 1910 Occupational Safety and Health Standards

40 CFR, Part 150-189 Protection of the Environment

US Army Corps of Engineers

EM 385-1-1 Safety and Health Requirements

9.0 LIST OF ATTACHMENTS:

Attachment Number Description

Attachment 1 Firebreak Maps

Attachment 2 Grass Waterway Specifications

Attachment 3 Terrace Specifications

Attachment 4 Access Road Specifications

Attachment 5a Area 1 Access Road Aerial Map

Attachment 5b Area 2 Access Road Aerial Map

Attachment 5c Access Roads Location Aerial Map

1.18

10.52 Ac

1.17

2.62 Ac

1.16

1.57 Ac

1.15

3.81 Ac

1.14

9.47 Ac

1.12

2.29 Ac

1.13

4.16 Ac

1.07

1.96 Ac

1.06

4.23 Ac

1.05

7.04 Ac

1.01

3.97 Ac 1.03

7.22 Ac1.02

6.60 Ac

1.08

2.27 Ac

1.10

1.21 Ac

1.09

23.00 Ac

1.04

20.79 Ac

1.19

2.07 Ac

1.04a

5.58 Ac

1.11

6.47 Ac

Disclaimer: All lease areas and acreage shown on this map are approximate. Interested persons should review the actual lease area for the actual usable acreage.

0 10.5

Miles

ATTACHMENT 1- FIREBREAK MAP Firebreak 1

GIS Office \DPW\Projects\DPW\Environmental\Conservation \Ag_Lease\Firebreak2015\Firebreak_Mapbook_2015.mxd

Date Modified: 1/20/2015

Road Fort Riley Boundary Maneuver Area Terrace

Firebreak Waterways Wetland Recreation Pond

FOUO

IMPACT AREA

2.04a

0.57 Ac

2.03

61.66 Ac

2.02

5.83 Ac

2.01

11.20 Ac

2.04

57.46 Ac

2.05

26.82 Ac

2.06

6.97 Ac

2.07

11.24 Ac

Disclaimer: All lease areas and acreage shown on this

ATTACHMENT 1- FIREBREAK MAP Firebreak 2

GIS Office \DPW\Projects\DPW\Environmental\Conservation \Ag_Lease\Firebreak2015\Firebreak_Mapbook_2015.mxd

Date Modified: 1/20/2015

Road Fort Riley Boundary Maneuver Area Terrace

Firebreak Waterways Wetland

3.14

14.36 Ac

3.13

26.48 Ac

3.12

3.21 Ac

3.11

5.47 Ac

3.10

53.75 Ac

3.09

4.78 Ac

3.08

2.26 Ac

3.07

6.29 Ac

3.06

1.84 Ac

3.05

6.35 Ac

3.03

5.45 Ac

3.01

14.07 Ac

3.04

7.88 Ac

3.02

3.73 Ac

4.01

14.96 Ac

Disclaimer: All lease areas and acreage shown on this

0 1 20.5

ATTACHMENT 1- FIREBREAK MAP Firebreak 3

GIS Office \DPW\Projects\DPW\Environmental\Conservation \Ag_Lease\Firebreak2015\Firebreak_Mapbook_2015.mxd

Date Modified: 1/20/2015

Road Fort Riley Boundary Maneuver Area Terrace

Firebreak Waterways Wetland Recreation Pond FOUO

MRPC

4.11

8.81 Ac

4.02

26.45 Ac

4.01

14.96 Ac

4.03

13.05 Ac

4.04

5.28 Ac

4.06

16.58 Ac

4.07

11.20 Ac

4.08

12.56 Ac

4.09

12.49 Ac

4.10

6.99 Ac

4.05a

1.70 Ac

4.05

7.45 Ac

Disclaimer: All lease areas and acreage shown on this

ATTACHMENT 1- FIREBREAK MAP Firebreak 4

GIS Office \DPW\Projects\DPW\Environmental\Conservation \Ag_Lease\Firebreak2015\Firebreak_Mapbook_2015.mxd

Date Modified: 1/20/2015

Road Fort Riley Boundary Maneuver Area Terrace

Firebreak Waterways Wetland

MRPC

MPRC

5.01

24.34 Ac5.04

22.20 Ac

5.10

50.84 Ac

5.03

1.42 Ac

5.02

7.06 Ac

5.05

9.36 Ac

5.07

0.62 Ac

5.08

9.88 Ac

5.09

7.71 Ac

5.06

4.81 Ac

Disclaimer: All lease areas and acreage shown on this

ATTACHMENT 1- FIREBREAK MAP Firebreak 5

GIS Office \DPW\Projects\DPW\Environmental\Conservation \Ag_Lease\Firebreak2015\Firebreak_Mapbook_2015.mxd

Date Modified: 1/20/2015

Road Fort Riley Boundary Maneuver Area Terrace

Firebreak Waterways Wetland

MPRC

6.02

10.73 Ac

6.03

3.80 Ac

6.04

1.86 Ac

6.05

9.14 Ac

6.06

12.89 Ac

6.07

1.45 Ac

6.08

21.54 Ac

6.09

10.67 Ac

6.12

12.99 Ac

6.13

11.30 Ac

6.14

34.74 Ac

6.15

7.56 Ac

6.17

8.36 Ac

6.01

3.52 Ac

6.11

4.39 Ac

6.10

9.22 Ac

6.16

3.34 Ac

6.13a

2.34 Ac

Disclaimer: All lease areas and acreage shown on this

ATTACHMENT 1- FIREBREAK MAP Firebreak 6

GIS Office \DPW\Projects\DPW\Environmental\Conservation \Ag_Lease\Firebreak2015\Firebreak_Mapbook_2015.mxd

Date Modified: 1/20/2015

Road Fort Riley Boundary Maneuver Area Terrace

Firebreak Waterways

7.05

15.80 Ac

7.06

9.08 Ac

7.08

32.84 Ac

7.07

9.82 Ac

7.09

4.39 Ac

7.10

17.60 Ac

7.01

3.84 Ac 7.02

5.47 Ac

7.04

4.79 Ac

7.03

19.45 Ac

7.11

4.28 Ac

Disclaimer: All lease areas and acreage shown on this

ATTACHMENT 1- FIREBREAK MAP Firebreak 7

GIS Office \DPW\Projects\DPW\Environmental\Conservation \Ag_Lease\Firebreak2015\Firebreak_Mapbook_2015.mxd

Date Modified: 1/20/2015

Road Fort Riley Boundary Maneuver Area Terrace

Firebreak Waterways Wetland

8.03

15.07 Ac

8.04

12.00 Ac

8.02

5.72 Ac

8.01

7.88 Ac

8.08

8.46 Ac

8.09

1.92 Ac

8.10

6.54 Ac

8.11

13.77 Ac

8.13

12.93 Ac

8.14

2.62 Ac

8.15

12.34 Ac

8.05

1.38 Ac

8.06

30.88 Ac

8.12

3.80 Ac

8.07

6.82 Ac

Disclaimer: All lease areas and acreage shown on this

ATTACHMENT 1- FIREBREAK MAP Firebreak 8

GIS Office \DPW\Projects\DPW\Environmental\Conservation \Ag_Lease\Firebreak2015\Firebreak_Mapbook_2015.mxd

Date Modified: 1/20/2015

Road Fort Riley Boundary Maneuver Area Terrace

Firebreak Waterways Wetland

9.01

20.12 Ac 9.03

1.45 Ac

9.04

4.5711689.02

1.28 Ac

9.05

3.03 Ac

9.13

12.37 Ac

9.11

6.81 Ac

9.10

6.43 Ac

9.08

0.83 Ac

9.06

3.68 Ac

9.14

7.57 Ac

9.15

5.97 Ac

9.16

3.00 Ac

9.17

3.43 Ac

9.18

1.44 Ac9.19

3.23 Ac

9.20

2.32 Ac9.21

2.49 Ac

9.22

4.42 Ac

9.12

6.81 Ac9.09

1.68 Ac

9.07

1.02 Ac

Disclaimer: All lease areas and acreage shown on this

ATTACHMENT 1- FIREBREAK MAP Firebreak 9

GIS Office \DPW\Projects\DPW\Environmental\Conservation \Ag_Lease\Firebreak2015\Firebreak_Mapbook_2015.mxd

Date Modified: 1/20/2015

Road Fort Riley Boundary Maneuver Area Terrace

Firebreak Waterways

412 - 1

NRCS, KS

January 2016 Conservation practice standards are reviewed periodically and updated if needed. To obtain the current version of this standard, contact your Natural Resources Conservation Service State Office or visit the Field Office Technical Guide.

NATURAL RESOURCES CONSERVATION SERVICE

CONSERVATION PRACTICE STANDARD

GRASSED WATERWAY

(Ac.)

CODE 412

DEFINITION

A shaped or graded channel that is established with suitable vegetation to convey surface water at a non-erosive velocity using a broad and shallow cross section to a stable outlet.

PURPOSE

To convey runoff from terraces, diversions, or other water concentrations without causing erosion or flooding.

To prevent gully formation.

To protect/improve water quality.

CONDITIONS WHERE PRACTICE APPLIES

This practice is applied in areas where added water conveyance capacity and vegetative protection are needed to prevent erosion and improve runoff water quality resulting from concentrated surface flow.

CRITERIA

General Criteria Applicable to All Purposes

Plan, design, and construct grassed waterways to comply with all federal, state, and local laws and regulations.

Capacity. Design the waterway to convey the peak runoff expected from the 10-year frequency, 24-hour duration storm. Increase capacity as needed to account for potential volume of sediment expected to accumulate in the waterway between planned maintenance activities. When the waterway slope is less than 1 percent, out-of-bank flow may be permitted if such flow will not cause excessive erosion. Ensure that the design capacity, at a minimum, will remove the water before crops are damaged.

Stability. Determine the minimum depth and width requirements for stability of the grassed waterway using the procedures in the NRCS National Engineering Handbook, Part 650, Engineering Field Handbook, Chapter 7, Grassed Waterways or Agricultural Research Service (ARS) Agriculture Handbook 667, Stability Design of Grass-Lined Open Channels. Base stability computations on the peak runoff expected from the 10-year frequency, 24-hour duration storm.

Ensure that the vegetation species selected are suited to the current site conditions and intended uses. Select species that have the capacity to achieve adequate density, height, and vigor within an appropriate time frame to stabilize the waterway.

The allowable effective stress on the soil may be estimated from the soil erodibility categories below, or may be calculated using site-specific soil properties.

Easily Eroded: Very Fine Sandy Loam, Fine Sandy Loam, Coarse Sandy Loam, Coarse Sandy Loam, Sandy Loam, Very Fine Sand, Fine Sand, Coarse Sand, Sand, Loamy Very Fine Sand, Loamy Fine Sand, Loamy Coarse Sand, Loamy Sand, Silt loam (Plasticity Index < 12)

Erodible: Silt loam (Plasticity Index >= 12), Silt, Loam, Sandy Clay Loam, Sandy Clay

Erosion resistant: Clay loam, Silty clay loam, Silty clay, Clay

Design stress and design velocity shall not exceed the allowable effective stress and allowable velocity in Table 1 below, unless site-specific soil properties (soil type, plasticity index, and void ratio) are used to compute allowable effective stress. When allowable effective stress is computed using site-specific soil properties, design velocity shall not exceed

ATTACHMENT 2 - GRASS WATERWAY SPECIFICATIONS

http://www.nrcs.usda.gov/about/organization/regions.html http://www.nrcs.usda.gov/technical/efotg

412 - 2

January 2016 the allowable velocity in Table 1 by more than 20%.

Table 1 - Allowable stress and velocity

Soil Erodibility Category

Allowable Effective Stress (lbs/ft2)

Allowable Velocity 1/ (feet/second)

Annually Vegetated, Permanently Vegetated, Retardance E

Retardance D

Easily Eroded 0.02 1.5 4.0

Erodible 0.03 2.0 4.5

Erosion resistant 0.05 2.5 5.0 1/ Reduce allowable velocity 10 percent if a long duration flow is expected (such as from a pond or spring).

Reduce allowable velocity 20 percent if it is difficult to establish or maintain good grass cover (80% minimum cover over the area) throughout the waterway.

Design velocity should be maintained or slightly increased for each succeeding downstream design reach of the waterway having similar cover. Design velocity may only be decreased for succeeding downstream reaches if a 100-foot transition zone is provided, and excessive sediment deposition is not expected. Reduction in velocity from one reach to the next shall not exceed 25 percent.

Annually vegetated waterways may be considered on gentle slopes of 0.6 percent or less. Design stress and velocity for an annually vegetated waterway shall be determined by using no vegetal cover and Retardance E.

Perennial grass sod must be established in permanently vegetated waterways. If field conditions allow, runoff from the contributing drainage area will be diverted from the waterway during the establishment period.

Width. Keep the bottom width of trapezoidal waterways less than 100 feet unless multiple or divided waterways or other means are provided to control meandering of low flows.

Average top width of a waterway shall not be less than 20 feet, unless the waterway is located in an urban setting.

Side slopes. Where farm equipment must cross the waterway during farming operations, side slopes of 6:1 or flatter are recommended, but in no case shall side slopes be steeper than 4:1. Waterways may be parabolic or trapezoidal.

Depth. The capacity of the waterway must be large enough so that the water surface of the waterway is below the water surface of the tributary channel, terrace, or diversion that flows into the waterway at design flow. The minimum recommended depth is 1.0 foot. In urban settings, the minimum depth is 0.5 foot.

Provide 0.5 foot freeboard above the designed depth when flow must be contained to prevent damage. Provide freeboard above the designed depth when the vegetation has the maximum expected retardance.

When the design depth includes a permanent berm to complete the cross section, increase the total constructed depth to include a minimum of 0.5 foot of freeboard above the hydraulic design depth.

Drainage. When needed to establish or maintain vegetation on sites having prolonged flows, high water tables, or seepage problems, use Subsurface Drain (606), Underground Outlet (620), or other suitable measures in waterway designs.

Where drainage practices are not practicable or sufficient to solve these seepage problems, use conservation practice Lined Waterway or Outlet (468) in place of Grassed Waterway (412).

Spread out all excavated material away from the waterway in order to provide for free drainage into the waterway.

Outlets. Provide a stable outlet with adequate capacity to prevent ponding or flooding damages. The outlet can be another vegetated channel, an earthen ditch, a grade-stabilization structure, filter strip, or other suitable outlet.

Vegetative Establishment. Grassed waterways shall be vegetated according to NRCS Conservation Practice Standard Critical Area Planting (342). Species selected shall be suited to the current site conditions and intended uses. Selected species will have the capacity to achieve adequate density, height, and vigor within an appropriate time frame to stabilize the waterway.

Establish vegetation as soon as conditions permit. Use mulch anchoring, nurse crop, rock or straw or hay bale dikes, fabric or rock checks, filter fences, or runoff diversion to protect the vegetation until it is established.

ATTACHMENT 2 - GRASS WATERWAY SPECIFICATIONS

412 - 3

January 2016

Planting of a close growing crop, e.g. small grains or millet, on the contributing watershed prior to construction of the grassed waterway can also significantly reduce the flow through the waterway during establishment.

Provide livestock and vehicular crossings as necessary to prevent damage to the waterway and its vegetation.

Where subsoil will be exposed, stockpile the best available soil for spreading on the waterway after grading as specified in the construction details.

Temporary berms may be constructed alongside of the waterway to prevent runoff from entering the waterway until adequate vegetative cover is established. When the vegetation is established, the berms shall be removed in accordance with the operation and maintenance (O&M) plan; and the earthfill material blended in the field so that free drainage into the waterway is provided.

Waterway restoration. A waterway is considered to be nonfunctional when its age has exceeded the practice lifespan, and any of the following exists:

The existing waterway has gully erosion exceeding 1 foot of depth in at least 25% of the waterway's length.

The existing waterway has an unstable outlet that could be remedied by rebuilding the waterway with a different grade or cross section.

The existing waterway has (1) a cross-sectional flow area with a capacity of less than 50 percent of the design discharge when full, or (2) a depth less than 0.5 foot.

Supporting data is to be prepared that clearly shows the waterway is or is not functional in accordance with the above criteria. Restored waterways shall be designed in accordance with this standard.

CONSIDERATIONS

Permanent berms along the waterway are permitted as part of the design depth and desirable when the waterway serves as an outlet for terraces or diversions to blend in with the ridge height.

Special consideration should be given to waterways that are being rebuilt or reshaped so the depth of the waterway is compatible with the existing terrace system.

Waterway designs may require the constructed bottom elevation to meet a specific elevation.

Examples of this are waterways draining into or receiving flow from structures or waterways used as outlets for terraces or diversions to facilitate their improved alignment or paralleling. In these types of situations, construction tolerances for the flow line elevations shall be specified in the construction details.

Where environmentally-sensitive areas need to be protected from dissolved contaminants, pathogens, or sediment in runoff, consider establishment of an increased width of vegetation on the waterway above the flow area. Increasing the width of the waterway above the flow area will increase filtering of sediment and pathogens as well as increase infiltration of runoff and increase nutrient removal. Where sediment control is the primary concern, consider using vegetation in the waterway which can withstand partial burial and adding sediment control measures above the waterway such as residue management.

Consider increasing the channel depth and/or designing areas of increased width or decreased slope to trap and store sediment to reduce the amount of sediment that leaves a field. Provide for regular cleaning out of the waterway when trapping sediment in this manner.

Tillage and crop planting often takes place parallel to the waterway, resulting in preferential flow – and resulting erosion – along the edges of the waterway. Consider installation of measures that ensure that runoff from adjacent areas will enter the waterway.

Measures such as directing spoil placement or small swales can direct this preferential flow into the grassed waterway.

Avoid areas where unsuitable plant growth limiting subsoil and/or substratum material such as salts, acidity, root restrictions, etc.

may be exposed during implementation of the practice. Where areas cannot be avoided, seek recommendations from a soil scientist for improving the condition or, if not feasible consider over-cutting the waterway and add topsoil over the cut area to facilitate vegetative establishment.

412 - 4

January 2016

Avoid or protect if possible important wildlife habitat, such as woody cover or wetlands when determining the location of the grassed waterway. If trees and shrubs are incorporated, they should be retained or planted in the periphery of grassed waterways so they do not interfere with hydraulic functions. Medium or tall bunch grasses and perennial forbs may also be planted along waterway margins to improve wildlife habitat.

Waterways with these wildlife features are more beneficial when connecting other habitat types; e.g., riparian areas, wooded tracts and wetlands. When possible, select species of vegetation that can serve multiple purposes, such as benefiting wildlife, while still meeting the basic criteria needed for providing a stable conveyance for runoff.

Water-tolerant vegetation may be an alternative to subsurface drains or stone center waterways on some wet sites.

Use irrigation in dry regions or supplemental irrigation as necessary to promote germination and vegetation establishment.

Wildlife habitat benefits can be provided by adding width of appropriate vegetation to the sides of the waterway. Care should be taken to avoid creating small isolated planting zones that could become population sinks where wildlife attracted to an area experience reproductive loss due to predation. Refer to Conservation Practice Standard 645, Wildlife Upland Habitat Management.

Consider including diverse legumes, forbs, and flowering plants such as milkweeds that provide pollen and nectar for native bees and other pollinators. In dry regions, these sites may be able to support flowering forbs with higher water requirements and thus provide bloom later in the summer.

The construction of a grassed waterway can disturb large areas and potentially affect cultural resources. Be sure to follow state cultural resource protection policies before construction begins.

PLANS AND SPECIFICATIONS

Prepare plans and specifications for grassed waterways that describe the requirements for applying the practice according to this standard. As a minimum include:

A plan view of the layout of the grassed waterway.

Typical cross section(s) of the grassed waterway(s).

Profile(s) of the grassed waterway(s).

Disposal requirements for excess soil material.

Site specific construction specifications that describe in writing the installation of the grassed waterway. Include specification for control of concentrated flow during construction and vegetative establishment.

Vegetative establishment requirements.

A stormwater pollution prevention plan shall be prepared for all grassed waterways in which a Kansas Department of Agriculture, Division of Water Resources (DWR) permit is required for a channel change or stream obstruction. The landowner shall submit the plan with a permit application (called a Notice of Intent [NOI]) and permit fee to the Kansas Department of Health and Environment (KDHE) before construction begins.

OPERATION AND MAINTENANCE

Provide an operation and maintenance plan to review with the landowner. Include the following items and others as appropriate in the plan.

Establish a maintenance program to maintain waterway capacity, vegetative cover, and outlet stability. Vegetation damaged by machinery, herbicides, or erosion must be repaired promptly.

Correct erosion or silt deposition on annually vegetated waterways by removing the excess material or changing the vegetative cover if possible.

Protect waterway from concentrated flow by using diversion of runoff or mechanical means of stabilization such as silt fences, mulching, haybale barriers and etc. to stabilize grade during vegetation establishment.

Minimize damage to vegetation by excluding livestock whenever possible, especially during wet periods. Permit grazing in the waterway only when a

412 - 5

January 2016 controlled grazing system is being implemented.

Inspect grassed waterways regularly, especially following heavy rains. Fill, compact, and reseed damaged areas immediately. Remove sediment deposits to maintain capacity of grassed waterway.

Avoid use of herbicides that would be harmful to the vegetation (including established forbs) or pollinating insects in and adjacent to the waterway area.

Avoid using waterways…