50 1
.1 ð
STATE YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
Partial
60%
13% sht. 1
AADT(2017)
AADT(2037)
FORT RILEY DIRECTORATE OF PUBLIC WORKS
ROADSIDE IMPROVEMENTS PROJECT
RILEY COUNTY KANSAS
TASK ORDER NO.
45 MPH
20 FT
2- O O PLAN & STANDARD SHEETS
KANSAS 1
GROSS LENGTH OF PROJECT
EXCEPTIONS
NET LENGTH OF PROJECT
NET LENGTH OF BRIDGES
NET LENGTH OF ROAD
FT. (Includes Equations)
FT.
FT.
FT. MILES
MILES
MILES
Clear Zone
C of A
V
D
DHV
T
DESIGN DESIGNATION
CONVENTIONAL SIGNS
COUNTY LINE
CITY LIMITS
STATE OR NATIONAL LINE
PROPERTY LINE
HIGHWAY FENCE
EXISTING FENCE
CONSTRUCTION LIMITS
RIGHT OF WAY LINE
TRAVELED WAY
RAILROADS
TOWNSHIP, SECTION or GRANT LINE
GUARDRAIL
CENTER LINE OF PROJECT
TERRACE
CULVERTS
DROP INLET & STORM SEWER
ACCESS CONTROL
POWER POLE
TELEPHONE POLE
MARSH
HEDGE
TREES
PROFILE ELEVATION
STREAM or CREEK
INDEX OF SHEETS
TITLE SHEET1
FORT RILEY DIRECTORATE OF PUBLIC WORKS
Project Manager, Public Works Engineering Division
Approved
Date
By:
FEDERAL PROJECT
Civil Engineer PE, PTOE
STA 0+00 Vinton School Rd
BEGIN PROJECT
STA 329+00 Vinton School Rd
END PROJECT
STA 0+00 Campbell Hill Rd
BEGIN PROJECT
STA 120+00 Campbell Hill Rd
END PROJECT
SEEDING
PAVEMENT
GRADING
CULVERTS
03-17-2017 scott.r.sutherland Typewritten Text Quantities on plans are estimated and for information only. Contractor shall verfiy quantities for bidding purposes.
ì ñ6:1
Ground line
1: 1 Typ.
Slope 4.2% 2'-0" Sho.
ì ñ6:1
Slope 4.2% 2'-0" Sho.
Slope 2.00%
12' 12'
STATE
KANSAS
YEARPROJECT N0. SHEET NO.
SHEETS
TOTAL
Fort Riley Directorate of Public Works
Ground line
12'-0" 12'-0"
Slope 2.0%
Ex ist ing
Reconstruct Crown Grade
W/ Overlay Operations
E xisting
CAMPBELL HILL RD
VINTON SCHOOL RD
TYPICAL SECTION
CAMPBELL HILL RD.
VINTON SCHOOL &
ì
12'-0"
Slope 2.00%
Saw Cut
FULL DEPTH PATCH
Geogrid
Width Varies
Note:
Type-B MR-90
6" Aggregate Base (Special)(RAP)(|nsall Only) w/ Geogrid
2" HMA Commerical Grade (Class A)
TYPE B (MR-90)
Millings (4")
TYPE B (MR-90)
Millings (4")
5" HMA Comm. Grade (Class A)
7" HMA Comm. Grade (Class A)(Patching) w/ Geogrid ì
Geogrid
Early High Str. Pavement (12" Uniform)(AE)(NRDJ)
TANK CROSSING
Slope 2.00%
15'-0"
Type-AA MR-3-3
Drainable Base (Unbound)(4")
Nonwoven Geotextile
Slope 2.00%
15'-0"
Note: Place Dowel Baskets in Direction of Tank Travel
2" HMA Comm. Grade (Class A)
Contractor Allowed to Place 5" Compacted Thickness Along Crown Grade
Overlay Cross Sectional 7.0 SQFT
Sht. RD051 for Grade Control Point Detail.
Milling Shall be Subsidary to Other Bid |tems. See KDOT Std.
Concrete Pavement not Scheduled for Replacement on this Project.
Milling Required to Match Grade Control Points at Existing
Overlay Along Crown. Maintain Super Elevation where Applicable.
Cross Slope with 2" Average Overlay at Shoulders and 5" Average to provide 4% Cross Slope or Super elevation. Reconstruct 2%
Bidding Purposes. Regrade High and Low Shoulders for |nformation Only. Contractor Shall Verify Quantities for
Quantities Provided on the Plans are an Estimate and
Follow 2015 KDOT Standard Specifications for all Materials.
24'
Tank Path
Tank Path
O ld
H ig h w a y
0+00 5+000+00 5+00 { Vinton School Rd.
{ Vinton School Rd.
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
E S
N
T E
D
R E
F E
R E
N C
C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Start Mill&Overlay Operations
{ Vinton Sta. -10.00 N=293006.04 E=1644232.52
Geotextile Fabric (80 SQYD)
Geosynthetic Reinforcement (For Base) (160 SQYD)
Early High Strength Pavement (12" Uniform)(AE)(NRDJ) (80 SQYD)
Drainable Base (Unbound)(4") (80 SQYD)
Rock Excavation (33 CUYD)
Estimated Materials Include the Following:
for Std. Spec. 501.4i(3), See Detail Sheet
Install 24'X30' Concrete Tank Crossing, Perform Flexural Tests KT-23
Remove Existing 20'X44' Concrete Tank Crossing
{ Vinton Sta. 2+83.00
Emulsified Asphalt (87750 SQYD) PVMT Marking (Yellow)(4") (66366 LNFT) PVMT Marking (White)(4") (66146 LNFT) HMA Commerical Grade (Class A) (16700 TONS) Aggregate Shoulder (Milling)(Install Only)(4") (19984 SQYD) Common Excavation (2500 CUYD) Estimated Materials Include the Following:
See Typical Section Sheet
Const. Overlay w/2' Millings Shoulder { Vinton Sta. 0+00 to 329+00
0+00 5+00
6in6in
6in 6in
6in
24in
12in
12in
25+00 30+00 35+0025+00 30+00 35+00 { Vinton School Rd. { Vinton School Rd.
N=293062.91 E=1647138.74
N=292998.91 E=1647138.74
N=293030.91 E=1647138.74
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Clear & Grub - Trees Up to 6" Diameter (150 SQFT)
Clear & Grub - Tree Removal, Trees Larger than 6" Diameter (8 EA) Estimated Materials Include the Following:
Brush & Tree Removal
Flowable Fill (Low Strength) (62 CUYD)
Slope Protection (Riprap Stone) (7 CUYD)
Geotextile Fabric (10 SQYD)
End Section (36")(RCP) (2 EA)
Cross Road Pipe (36")(RCP) (64 LNFT)
Geosynthetic Reinforcement (For Base) (16 SQYD)
HMA Commerical Grade (Class A)(Patching)(7") (8 SQYD)
HMA Commerical Grade (Class A)(2") (8 SQYD)
Emulsified Asphalt (16 SQYD)
Aggregate Base (Special)(RAP)(6")(Install Only) (8 SQYD)
Rock Excavation (2 CUYD)
Common Excavation (50 CUYD)
Estimated Materials Include the Following:
Fill and Re-grade
Install Geotextile w/Riprap LT.&RT.
See RCP Typical Section Sht.
Install 36"X64' RCP w/End Sections LT.&RT.
Remove Existing 24"X55' CMP
{ Vinton Sta. 31+89.00
25+00 30+00 35+00
50'
Tank Path
3:1 3:1
Std. Ditch
5'
11'
40+00 45+0040+00 45+00
N=293034.43 E=1647740.81
{ Vinton School Rd.
{ Vinton School Rd.
N=292999.94 E=1647741.88
N=293059.92 E=1647740.18
N=293073.09 E=1648236.19
N=293037.35 E=1648236.85
N=293008.10 E=1648237.41
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Clear & Grub - Trees up to 6" Diameter (1300 SQFT)
Seed (632 SQFT)
Erosion Control (Class 2)(Type G) (56 SQYD)
Estimated Materials Include the Following:
See KDOT Std. Sht. LA856
See Std. Ditch
Fill and Re-grade 5' Ditch w/3:1 Side Slope
Brush & Tree Removal
Slope Protection (Riprap Stone) (3 CUYD) Geotextile Fabric (5 SQYD)
End Section (17"X13")(1.1SQ.FT.)(CSMAP) (2 EA) Cross Road Pipe (17"X13")(1.1 SQ.FT.)(CSMAP) (15 LNFT) Common Excavation (20 CUYD)
Estimated Materials Include the Following:
Fill and Re-grade
Install Geotextile w/Riprap LT.&RT.
w/End Sections LT.&RT.
Install 10' Ext. LT. and 5' Ext. RT. to Existing 17"X13" CMAP { Vinton Sta. 42+87.00
Clear & Grub - Trees up to 6" Diameter (50 SQFT) Slope Protection (Riprap Stone) (5 CUYD) Geotextile Fabric (7 SQYD)
End Section (7.0 SQ.FT.)(CSMAP) (2 EA) Cross Road Pipe (7.0 SQ.FT.)(CSMAP) (5 LNFT) Common Excavation (10 CUYD)
Estimated Materials Include the Following:
Brush & Tree Removal
Fill and Re-grade
Install Geotextile w/Riprap LT.&RT.
Install 5' Ext. RT. to Existing 33"X38" w/End Sections LT.&RT.
{ Vinton Sta. 37+90.00
Geotextile Fabric (80 SQYD)
Geosynthetic Reinforcement (For Base) (160 SQYD)
Early High Strength Pavement (12" Uniform)(AE)(NRDJ) (80 SQYD)
Drainable Base (Unbound)(4") (80 SQYD)
Rock Excavation (14 CUYD)
Estimated Materials Include the Following:
for Std. Spec. 501.4i(3), See Detail Sheet
Perform Flexural Tests KT-23
Install 24'X30' Concrete Tank Crossing
Remove Existing 28'X13' Concrete Tank Crossing
{ Vinton Sta. 126+17
40+00 45+00
70+00 75+0070+00 75+00
N=293060.07
E=1651376.04
N=293024.4385 E=1651354.3375
{ Vinton School Rd. { Vinton School Rd.
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Slope Protection (Riprap Stone) (10 CUYD) Geotextile Fabric (15 SQYD)
Estimated Materials Include the Following:
Fill and Re-grade
Install Geotextile w/Riprap RT.
Seed (670 SQFT)
Erosion Control (Class 2)(Type G) (118 SQYD) Estimated Materials Include the Following:
See KDOT Std. Sht. LA856
Fill and Re-grade 10' Ditch w/3:1 Side Slopes
End Section 48" CS (1 EA)
Cross Road Pipe 48" CS (5 LNFT)
Common Excavation (50 CUYD)
Estimated Materials Include the Following:
Install 5' Ext. RT. to Existing 48" CMP w/End Section RT.
{ Vinton Sta. 74+25.00
70+00 75+00
12in 12in
6in
Std. Ditch
80+00 85+00 90+0080+00 85+00 90+00
3:1 3:1
5'
11'
N=293061.07 E=1652494.69
{ Vinton School Rd.
{ Vinton School Rd.
N=293090.39 E=1652500.84
N=293031.00 E=1652524.68
N=293060.70 E=1652512.77
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Seed (632 SQFT)
Erosion Control (Class 2)(Type G) (56 SQYD)
Estimated Materials Include the Following:
See KDOT Std. Sht. LA856
See Std. Ditch
Fill and Re-grade 5' Ditch w/3:1 Side Slopes
Flowable Fill (Low Strength) (15 CUYD)
Estimated Materials Include the Following:
Fill and Re-grade
Plug Existing 36"X55' CMP w/Flowable Fill { Vinton Sta. 85+45
Seed (632 SQFT) rosion Control (Class 2)(Type G) (56 SQYD)
Estimated Materials Include the Following:
See KDOT Std. Sht. LA856
See Std. Ditch
Fill and Re-grade 5' Ditch w/3:1 Side Slopes
Clear & Grub - Trees up to 6" Diameter (1500 SQFT) Clear & Grub - Tree removal, Trees Larger than 6" Diameter (3 EA) Flowable Fill (Low Strength) (68 CUYD)
Slope Protection (Riprap Stone) (8 CUYD)
Geotextile Fabric (12 SQYD)
End Section 36" RC (2 EA)
Cross Road Pipe 36" RCP (64 LNFT)
Geosynthetic Reinforcement (For Base) (18 SQYD) HMA Commerical Grade (Class A)(7")(Patching) (9 SQYD) HMA Commerical Grade (Class A)(2") (9 SQYD) Emulsified Asphalt (18 SQYD)
Aggregate Base (Special)(RAP)(6")(Install Only) (9 SQYD) Rock Excavation (3 CUYD)
Common Excavation (75 CUYD)
Estimated Materials Include the Following:
Brush & Tree Removal
Fill and Re-grade
Install Geotextile w/Riprap LT.&RT.
See RCP Typical Section Sheet
Install 36"X64' RCP w/End Sections 29.5' LT.&RT.
{ Vinton Sta. 85+63.00
80+00 85+00 90+00
90+00
100+00 90+00
100+00 { Vinton School Rd.
{ Vinton School Rd.
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Include Area in Mill&Overlay
PVMT Marking (Yellow)(4")PVMT Marking (Yellow)(4") PVMT Marking (Yellow)(4")PVMT Marking (Yellow)(4")
PVMT Marking (White)(4")
90+00
100+00
10'
105+00 110+00105+00 110+00
{ Vinton School Rd. { Vinton School Rd.
N=293072.05 E=1654416.00
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Clear & Grub - Trees up to 6" Diameter (160 SQFT) Slope Protection (Riprap Stone) (4 CUYD)
Geotextile Fabric (6 SQYD)
Cross Road Pipe 30" CSP (20 LNFT)
Common Excavation (20 CUYD)
Estimated Materials Include the Following:
Fill and Re-grade
Install Geotextile w/Riprap RT.
Install 10' Ext. RT. to 2 Existing 30" CMP { Vinton Sta. 105+60
105+00 110+00
5'
20'
Tank PathTank
Path
M.H.
130+00 135+00130+00 135+00 { Vinton School Rd.
N=293136.44 E=1656872.73
N=293101.78 E=1656883.64
N=293069.64 E=1656893.75
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Clear & Grub - Trees up to 6" Diameter (520 SQFT) Slope Protection (Riprap Stone) (6 CUYD)
Geotextile Fabric (8 SQYD)
End Section 24" CS (2 EA)
Cross Road Pipe 24" CSP (25 LNFT)
Estimated Materials Include the Following Items Install Geotextile w/Riprap LT.&RT.
Fill and Re-grade
Install 20' Ext. RT. from Manhole w/End Sections LT.&RT.
Install 5' Ext. RT. from Existing 24" CMP to Manhole { Vinton Sta. 129+72.00
Seed (127 SQFT)
Erosion Control (Class 2)(Type G) (23 SQYD) Estimated Materials Include the Following:
See KDOT Std. Sht. LA856
Fill and Re-Grade 10' Ditch w/3:1 Slopes
Manhole (4')(Type ll) (1 EA)
Common Excavation (81 CUYD)
Estimated Materials Include the Following:
Fill and Re-grade
KDOT Std. Sht. RD629
Install Manhole and Backfill
130+00 135+00
170+00
175+00
170+00
175+00
N=293371.82 E=1660727.76
N=293145.27 E=1661325.93
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
EWS
EWS
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Cont. w/2' Millings Shoulder
End of Mill & Asphalt Overlay
Start of Existing Concrete Surface
{ Vinton Sta. 168+80.00
Cont. w/2' Millings Shoulder
Beginning of Mill & Asphalt Overlay
End of Existing Concrete Surface
{ Vinton Sta. 182+39.00
170+00
175+00
6in 6in6in
210+00
Move Boulder Limestones (5'X3')
N=294080.31 E=1663758.55
N=294085.12 E=1663816.41
V in to n
S c h o o l
R d
N=294107.44 E=1664076.94
N=294078.94 E=1664067.58
N=294050.42 E=1664058.26
N=294141.70 E=1663812.67
N=294032.05 E=1663819.97
T a n k
C r o s s in g
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Geotextile Fabric (80 SQYD)
Geosynthetic Reinforcement (For Base) (160 SQYD) Early High Strength Pavement (12" Uniform)(AE)(NRDJ) (80 SQYD) Drainable Base (Unbound)(4") (80 SQYD)
Rock Excavation (33 CUYD)
Estimated Materials Include the Following:
for Std. Spec. 501.4i(3), See Detail Sheet
Install 24'X30' Concrete Tank Crossing, Perform Flexural Tests KT-23 Remove Existing 20'X44' Concrete Tank Crossing { Vinton Sta. 206+83
Rock Excavation (3 CUFT)
Estimated Materials Include the Following:
Remove Existing 5'X25'X6" Concrete
{ Vinton Sta. 210+00.00
Clear & Grub - Trees up to 6" Diameter (300 SQFT)
Clear & Grub - Tree removal, Trees Larger than 6" Diameter (3 EA) Slope Protection (Riprap Stone) (6 CUYD)
Geotextile Fabric (8 SQYD)
End Section 30" RC (2 EA)
Cross Road Pipe 30" RCP (56 LNFT)
Common Excavation (1200 CUFT)
Estimated Materials Include the Following:
Fill and Re-grade
Brush & Tree Removal
Install Geotextile w/Riprap LT.&RT.
LT.&RT.
Install 24' Ext. LT. and 32' Ext. RT. to Existing 30" RCP w/End Sections { Vinton Sta. 207+38.50
Granular Backfill (Wingwalls) (98 CUYD)
Slope Protection (Riprap Stone) (12 CUYD)
Geotextile Fabric (20 SQYD)
Clear & Grub - Trees up to 6" Diameter (550 SQFT)
Clear & Grub - Tree removal, Trees Larger than 6" Diameter (2 EA) Flowable Fill (Low Strength) (66 CUYD)
Geosynthetic Reinforcement (For Base) (40 SQYD)
Reinforcing Steel (Gr. 60) (8630 LBS)
Concrete (Grade 4.0) (80 CUYD)
HMA Commerical Grade (Class A)(Patching)(7") (20 SQYD)
HMA Commerical Grade (Class A)(2") (20 SQYD)
Emulsified Asphalt (40 SQYD)
Aggregate Base (Special)(RAP)(6")(Install Only) (20 SQYD)
Rock Excavation (5 CUFT)
Foundation Stabilization (28 CUYD)
Class lll Excavation (241 CUYD)
Common Excavation (300 CUYD)
Estimated Materials Include the Following:
Fill and Re-Grade
Brush & Tree Removal
See RCB & RCP Typical Section Sheet w/Riprap and Geotextile LT.&RT. Embed RCB 1' below Channel FL
Install 7'X7'X60' RCB w/Wing Walls and Aprons LT.&RT.
Remove 3 - 36" X 55' RCP in Parallel
{ Vinton Sta. 209+90.00 28.7'LT.&RT.
210+00
.1 .2
Strike
Line
R e in f o r c in g in
T o p o f
S la b a n d
B o tt m f
F lo o r
R e in f o r c in g in
B o tt o m o f
R e in f o r c in g in
T o p o f
S la b a tt m f
F lo o r
R e in f o r c in g in
B o tt o m o f
S1 & F1 bars
F4 or S4 bars (See
(Skewed Box)
Roadway
Lc Roadway
Typ. Section
3''
Reinforcing
Skewed
Reinforcing
Strike Line
(Lt. Skew Shown)
Typ. Section
Reinforcing
Strike Line
F4 or S5 bars (See
S la b a n d
T o p o f
F lo o r
S la b a n d
T o p o f
F lo o r
PLAN
SkewAngle
1'-6''
Lc n
Typical Section for Spa.)
Typical Section for Spa.)
(Normal Box)
9"
(at outside face)
3''
Reinforcing
Typ. Section
W1 (Inside Face)
@ Typ. Section Spa.
W1 extra
S1 & F1 bars
3"
-K2 bars
Place K2 bars only when
S3 bars are used in Typical Section.
S3 bars S3 bars ó ó
Skewed Box
Normal Box
Length Left =
Length Right =
Length Left =
Length Right =
-K1 bars
Project
9''
Lc
Side Slo pe
SECTION AND ELEVATION
(Normal to L Roadway)c
1'-6''
3''W1 bars (Inside Face)
G1 bars
G2 bars
(Skewed Boxes Only)
W1 bars
Const. Jt.
G1 bars (Top Hubgd.)
G2 bars (Btm. Hubgd.)
(Upstream End
Only)
(Skewed Boxes Only)
S4 (Bend as needed)
2''cl.
2''cl.2" cl.
2" cl.
W3 bars
Const. Jt.
(Optional)
4" Bevel
6''
Floor Elev. Lt.
Floor Elev. Rt.
Roadway Lt. = Roadway Rt. =
Roadway
(See Typ. Sect.)
TYPICAL SECTION
(W b a r s
F4 bars F3 bars
Const.
Joint3
(T y p
W3 bars
F4 bars
F1 bars
W1 bars
S1 bars
S5 bars
S4 bars
6"
S3 bars
6"
7'-0"
Optional
Const. Jt.
"c l.
1•"cl.
"c l.
c l.
àà ó àà c l.
(F4)(Each Face)
(S5)(Top Face)
See Bending Diagram
All Dimensions are out to out of bars.
BENDING DIAGRAM
K1
(Cut each length) ñ ñ
Varies from
Increments
É See RCB Auxiliary Details for Optional Splice.
Note:
S3 bars omitted unless grade box or slab thickness is greater than or equal to 12".
Note:
F3 bars omitted unless floor thickness is greater than or equal to 12.".
±± Omit S5 bars when S3 bars are omitted and omit the bottom layer of F4 bars when
F3 bars are omitted.
Gr. Elev.
Crown Design Skew
Fill Ht.
Elev. Lt. Elev. Rt.
For design purposes ONLY. Do NOT use for Construction
Floor Floor
Sta.
BR
KANSAS DEPARTMENT OF TRANSPORTATION
DATE REVISIONS BY APP'D
CADD
CADD CK.
DESIGNED
DESIGN CK.
DETAILED
DETAIL CK.
APP'D
QUANTITIES
QUAN. CK.
NO.
P lo t t e y j u d it h
P t
L c a t io n
M F
J x .d g n
F il e
P
D a t e
F
E B
:3
STATE
KANSAS
PROJECT NO. YEAR
TOTAL
SHEETS
SHEET NO.
Terry L. FleckFHWA APPROVAL 10-20-10
GENERAL NOTES
FILL HEIGHT: Unless otherwise noted, the Design Fill Height is measured from the riding surface at the culvert and includes the surfacing.
Where Grade 4.0(AE) is specified, place this concrete in the top slab above the Construction Joint.
Grade 60. All dimensions relative to reinforcing steel are to the centerline of the bar unless otherwise noted.
EXCAVATION: Excavation for culverts less than bridge length shall not be paid for directly but shall be subsidiary to
Grade 4.0 Concrete. Excavation for RCB bridges shall be paid for as Class III Excavation.
SEAL COURSE: The Engineer may require a seal course. The seal course shall be unreinforced Concrete(Commercial Grade)
Engineer. Concrete for the seal course shall be paid for
QUANTITIES: The quantities shown in the Culvert Summary include apron and/or soil saver quantities when they are required by the plans. Payment for additional quantities that result from including a seal course and/or a floating apron, as a change in the original plans, shall be made at the unit price bid for the various items involved.
STRIKE LINE: Construct the wingwalls and that portion of the at the unit price set for Concrete for Seal Course.
CONCRETE: Use concrete conforming to Grade 4.0 Concrete.
with a minimum depth of 3 inches or as determined by the
FOUNDATION STABILIZATION: The Foundation Stabilization quantity has been calculated to the limits shown on the "RCB Auxiliary
Details" sheet. The depth may be increased by the Engineer.
The Contractor may underrun Foundation Stabilization under the barrel if founded on firm material and with the
Engineer's approval. Use Foundation Stabilization on all wingwalls unless founded on rock or granular material.
REINFORCING: Use reinforcing steel conforming to ASTM A615, Bevel all exposed edges with a ƒ" triangular molding.
DESIGN LOADING: HL93
DESIGN SPECIFICATION: AASHTO LRFD Spec., 2007 Ed., 2009 Int.
RCB outside the Strike Line level. Construct the wingwall
UNIT STRESSES: Grade 4.0 Concrete f'c = 4,000 p.s.i.
Reinforcing Steel fy = 60,000 p.s.i.
footings with the culvert floor. See the wingwall detail sheets.
BRIDGE BACKWALL PROTECTION SYSTEM: For structures with Left Wings Right Wings Scour
Apron
Soil
Saver
CULVERT SUMMARY
Concrete
Barrel
(Cu.Yds.)
Wings
(Cu.Yds.)
Total
(Cu.Yds.)
Barrel
(Lbs.)
Wings
(Lbs.)
Total
(Lbs.)
Reinf. Steel (Gr. 60) includes any welded wire fabric LRFR RATING FACTORS
HL-93 Loading
Inventory Operating
Minimum Splice Lengths
#4
#5
1'-5''
1'-9''
GRANULAR BACKFILL (WINGWALLS):
See the "Auxiliary Details" sheet.
"Auxiliary Details" sheet.
this bid item in the Summary of Quantities. See the
SUMMARY OF QUANTITIES
C.Y.
Concrete (Grade 4.0)(AE) C.Y.
Class ||| Excavation C.Y.
Reinforcing Steel (Gr. 60) Lbs.
Lbs.
Foundation Stabilization C.Y.
Concrete for Seal Course (Set)
C.Y.
1 C.Y.
Concrete (Grade 4.0)
Reinforcing Steel (Gr. 60)(Epoxy Coated)
Granular Backfill (Wingwalls)
S.Y.Bridge Backwall Protection System
BAR SCHEDULE
SizeSpa. SizeSpa. SizeSpa.
SizeSpa. SizeSpa. SizeSpa.
Size
SizeSizeSpa.
SizeSpa. SizeSpa. SizeSpa.
SizeSpa. Size
Size Size
Size SizeSpa.
No. Length No. Length No. Length No. Length No. Length No. Length No. Length No. Length No. Length
No. Length No. Length No. Length No. Length No. Length No. Length No. Length No. Length No. Length
F1 F3 F4 S1 S3 S4 S5
K1 K2 W1 W3 G1 G2
S Y
S T
M
A
R T
D A
T A
B A
S E
C E
IB
R A
R Y
R
R
O G
R A
M
K B
X
M
D E
L
ID
V E
R S
IO
N
ID
C A
A
N/AN/AN/AN/A20N/AN/AN/AN/A1689"N/AN/AN/A246•"
N/A14N/AN/AN/AN/AN/AN/AN/A1066•"12N/AN/AN/AN/AN/AN/AN/A1066•"6 7'-10" 7'-10" 4 31'-7" 6 7'-10" 7'-10" 5 31'-9" 4 31'-7"
6 5 8'-1" 4 31'-7" 5 4 9'-1" 6 4 9'-1"
0.0
79.2
NoYes 2
Rt
209+90.00
Riley Co.
SINGLE 7 ft x 7 ft RCB
1.7.7 P
(30ÊSKEW RT.)
M.0053220 F2 00038 6J
1123.08 1122.76 1350.00 30 Flared Flared 46.50 32.65 79.15 5320 3313 8632 1.35 1.75
7'-4" to 2'-6•" by
11•"
6"6"
7"7"
7-S4 @ Eq. Spa.
=6'-0" (Btm. Face)
S p a
4 Spa.@1'-6" = 6'-0"
5 Eq. Spa. (1'-5"á)
30'-0"30'-0"
60'-0"
31'-0"
31'-0"
4'-8Œ" c l.
6''
#4 D1 @
#4 E1
SECTION A-A
Opt. Const. Joint3
7•"
CJ
2''cl.
(Alternating)
Splice to
V1 bar.
#4 H3 (Parallel
6'-0"
3'-4•" 2'-0"
See "RCB Aux. Details" sheet for
1•'' cl.
à additional requirements.
#5 V1 & #5 V2 to top face) (EF)
#4 H2 (EF)
1'-0" ctrs.
#4 V5 to #4 V5
#4 V4 splice
Eq. Spa.
2'' cl.
#5 V3 c l.
(Typ.)
#4 H1 (EF)
(Typ.)
#4 C1
87 lbs. per 100 sq. ft.
Mesh reinforcing
3" cl.
6''Toe Wall
Bend Mesh into
Apron 87 lbs.
per 100 sq.ft.
Mesh reinforcing in
SECTION B-B
Min.
c l.
Opt. Const. Joint à
1'-4'' Min.
Splice
#4 C1D D
#4 D2 @
(Plan of Footing)
6"
RCB
FLOOR
E
E
SECTION C-C
ì RCB q .S p a
V bars
(Typ.)
Min. Embedment of C1 bars into box floor.
1'-0" q .S p a
3"#4 D1 @ 1'-0" ctrs.
(13 Req'd. Short Wing)
(23 Req'd. Long Wing)
(1'-3"á)
(1
"á
(1
"á
Eq. Spa.
3-#4 E13-#4 E2
1-#4 C2
Wingwall for transition
Slope 4:1 as needed
VIEW D-D
End of RCB
F lo o r
T h ic k n e s s
Const. Jt. Const. Jt.
V a r ie s
(S e e
R
C B d e ta il s
9"
9"
•" Open Joint
#4 D2
#4 C2
SECTION E-E
End of RCB
Opt. Const. Joint
#4 E2
6"
2"cl.
1'-6" à
D1,D2
D2
D1
1'- 4'
1'-
12 12
E2
BENDING DIAGRAM
V2
V1
(All dimensions are out to out of bars.)
by equal increments (See Table)
2'-3"
2'-3"
3'-0"
5'-8"
H S
H S
H5S, H6S H5L, H6L
H6 L
H5 L
Bar Incrmts.
V3S
V3L 2‰"
V4S
V4L 2•"
4…"
9"
H7L, H7S
1'-3"H7L
H7S
H7S
H7L 9"
V3S, V3L, V4S, V4L
9"
1'-0"
3" ô Pin
Var. 4'-11" to 7'-10"3‡"
H5S
H6S àà à à àà ààH5L
H6L àà Bend in Field
1'-4" 1'-4''
NOTE: Bars with an 'L' or 'S' designation identifies bars in the long wing-wall ('L') or short wingwall ('S');
ie. #4 H2L, #4 H2S, etc.
Length
NOTE: Reinforcing Bar List is for both wings at one end of box only. See Bending Diagram
° S ke w
Mark
Number
#4 C1S #4 C1L #4 D1 #4 E1S #4 E1L #4 C2 #4 D2 #4 E2 #5 V1 #5 V2 #5 V3S#5 V3L#4 H1S #4 H1L#4 H2S#4 H2L#4 H3S#4 H3L#4 H5S#4 H5L#4 H6S#4 H6L
6622228810 3 1 3 3 36 5 5
15'-3" 27'-3" 8'-4" 12'-0" 22'-3" 5'-8" 4'-7" 6'-0" 11'-4" 19'-10" 7'-7" 13'-3" 11'-7" 19'-11" 2'-2" 2'-0" 2'-0" 2'-1" ñ ñ ññ ñ ñ ñ ñ ñ ñ 27 6 6ññ
#4 V4L#4 V4S
9 14 ñ ñ
#4 V5
2'-1"
#4 V6
8'-0"
#4 H7S
#4 H7L
2'-1" 1'-10"
25 17
C
A
A
C c l.
(Backface Shown)
ELEVATION OF WINGWALL
View D-D)
9" Level
3"
"9
S p a
CJ (See
12'-6" (Short Wing)
21'-0" (Long Wing)
#5 V3 (NS)
#5 V2 (NS)
#5 V1 (NS)
#4 H1 (EF) 9 Eq. Spa. @ 1'-3"á (Short Wing)
16 Eq. Spa. @ 1'-3"á (Long Wing)
8 Eq. Spa. @ 1'-3"á (Short Wing)
15 Eq. Spa. @ 1'-3"á (Long Wing)
#5 V2 (NS)
3"
#4 H3 (EF)
#4 H2 (EF)
8 Eq. Spa. (Short Wing)
13 Eq. Spa. (Long Wing)3•"
#4 V4 & #4 V5 (FS)
#5 V1 & #5 V3 (NS)
11"
#4 H7 @ 1'-4" ctrs.
6-#4 H5 (FS), #4 H6 (NS) &
3-#4 V6
WINGWALL JOINT DETAIL
(Plan View)
Typical both wings
#4 V6
Strip Drain of Wall Only
9"
Wing Length
Joint
•" Open
#4 H6L @#4 H5L @
#4 H7L (spa.
with H5L & H6L)
#4 H7S (spa.
with H5S & H6S)
#4 H6S @
#4 H5S @
1'-4" ctrs.
1'-4" ctrs.
1'-4" ctrs. 1'-4" ctrs.
•" Offset @ Top àà àà
B
B
Scour Apron to be used only where specified.
9'
Weephole Spa.
WING DIMENSIONS FOR 30 SKEWED BOX
o
Dimension
Reference
Point Wi ng wa ll
Le ng th
Le ve l
6'-3''
18'-2‚''
'-6
'-0
4' -0 ''2 S pa 6' -0
We ep ho le
Sp a.
'-0
NOTE:
Space weepholes to clear reinforcing steel.
See "RCB Aux. Details" sheet for additional weephole details.
FLARED WINGWALLS
GENERAL NOTES
UNIT STRESSES: Grade 4.0 Concrete; f'c = 4,000 p.s.i.
NOTE:
EF = Each Face
NS = Near Side
FS = Far Side
CJ = Const. Joint
NOTE: Const. Jt. may be used at Contractor's option when approved by the Engineer.
D1 bars or mesh may be spliced thus:
Minimum overlap shall be 1'-3". No increase in quantities or cost shall be allowed when
Contractor elects this option.
Filter Fabric is subsidiary to "Granular Backfill".
with approved filter fabric complying with Section 1710.
FILTER FABRIC: Separate in-situ material from granular backfill
BR
Sta.
of Quantities shown on the RCB details.
Quantities listed below are included in the Summary
DATE REVISIONS BY APP'D
DESIGNED
DESIGN CK.
DETAILED
DETAIL CK.
APP'D
QUAN. CK.
NO.
t t j u d it h
P c a t io n
M F
J x .d g n
F il e
P t e
F
E B
:3
STATE
KANSAS
PROJECT NO. YEAR
TOTAL
SHEETS
SHEET NO.
WINGWALL QUANTITIES (One End Only)
Wingwalls
Apron
Soil Saver
Reinforcing Steel (Gr. 60)
Welded Wire Fabric (Wings)
Welded Wire Fabric (Apron)
Filter Fabric (subsidiary)
Foundation Stabilization
(C.Y.)
(C.Y.)
(C.Y.)
Concrete (Gr. 4.0)
(C.Y.)
(C.Y.)
(C.Y.)
Lbs.
Lbs.
Lbs.
C.Y.
S.Y.
DESIGN SPECIFICATION: AASHTO LRFD Spec., 2007 Ed., 2009 Int.
DESIGN LOADING: HL93
Granular Backfill (Wingwalls)
Terry L. FleckFHWA APPROVAL 10-20-10 for the bid item Reinforcing Steel (Gr. 60) as pounds of reinforcing and included in the total quantity
6 x 6- W6 x W6 welded wire fabric and shall be classified shall be electrically welded and shall be composed of line of bar unless otherwise noted. Wire Reinforcing mesh
All dimensions relative to reinforcing steel shall be to center-
Grade 60. Welded Wire Fabric shall conform to ASTM A185.
REINFORCING: All reinforcing shall conform to ASTM A615, neat lines of the box, excluding the hubguard.
QUANTITIES: Wingwall Quantities include all quantities outside the fied on the plans or by the Engineer.
stream wings in locations subject to scour only when speci-
APRON: A 5" concrete slab shall be constructed between the down-on all wingwalls unless founded on rock or granular material.
FOUNDATION STABILIZATION: Use Foundation Stabilization all exposed edges with a ƒ" triangular moulding.
CONCRETE: Grade 4.0 Concrete shall be used throughout. Bevel
Reinforcing Steel; fy = 60,000 p.s.i.
Backfill all wings to limits shown on the "RCB Auxiliary Sheet".
requirements of SB-1, SB-2, SCA-1, SCA-2.
BACKFILL MATERIAL: Use Granular Backfill material meeting the
209+90.00
Riley Co.
7 ft Rise (30ÊSKEW)
10.30.07
M.0053220 F2 00038 6J
14.16
4.34
0.00
5.19
3.23
0.00
49.00
46.00
30'-3…"
4'-7…"
9'-2" 7'-7"
4'-11"
10'
50'
10'
50'
50'
R a n g e
T a n k
C r o s s in g
R a n g e
225+00 230+00225+00 230+00
N=294047.09 E=1665669.61
Std. Ditch
3:1 3:1
5'
11'
N=294088.03 E=1665941.95
N=294088.03 E=1665941.95
N=294001.03 E=1665942.60
{ Vinton School Rd. { Vinton School Rd.
N=294047.26 E=1665490.97
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Geotextile Fabric (80 SQYD)
Geosynthetic Reinforcement (For Base) (160 SQYD) Early Strength Concrete Pavement (12" Uniform)(AE) (NRDJ) (80 SQYD) Drainable Base (Unbound)(4") (80 SQYD) Rock Excavation (33 CUYD)
Estimated Materials Include the Following:
Std. Spec. 501.4i(3), See Detail Sheet Install 24'X40' Concrete Tank Crossing, Perform Flexural Tests K
T-23 for Remove Existing 20'X44' Concrete Tank Crossing { Vinton Sta. 225+95
Rock Excavation (7 CUYD)
Estimated Materials Include the Following:
Remove ConcreteSeed (632 SQFT)
Erosion Control (Class 2)(Type G) (56 SQYD)
Estimated Materials Include the Following:
See KDOT Std. Sht. LA856
See Std. Ditch
Fill and 5' Re-grade Ditch w/3:1 Side Slopes
Seed (632 SQFT)
Erosion Control (Class 2)(Type G) (56 SQYD)
Estimated Materials Include the Following:
See KDOT Std. Sht. LA856
See Std. Ditch
Fill and Re-grade 5' Ditch w/3:1 Side Slopes
Seed (638 SQFT)
Erosion Control(Class 2)(Type G) (56 SQYD)
Estimated Material Items Include the Following:
See KDOT Std. Sht. LA856
See Std. Ditch
Fill and Re-grade 5' Ditch w/3:1 Side Slopes
Seed (632 SQFT)
Erosion Control (Class 2)(Type G) (56 SQYD)
Estimated Materials Include the Following:
See KDOT Std. Sht. LA856
See Std. Ditch
Fill and Re-grade 5' Ditch w/3:1 Side Slopes
Clear & Grub - Trees up to 6" Diameter (1400 SQFT)
Slope Protection (Riprap Stone) (8 CUYD)
Geotextile Fabric (11 SQYD)
Cross Road Pipe 30" RCP (32 LNFT)
Common Excavation (20 CUYD)
Estimated Materials Include the Following:
Fill and Re-grade
Install Geotextile w/Riprap LT.&RT.
Install 16' Ext. LT.&RT. to 2 Existing 30" RCP
Remove Existing CMP Ext.
{ Vinton Sta. 224+14
Clear & Grub - Trees up to 6" Diameter (1380 SQFT)
Slope Protection (Riprap Stone)(7 CUYD)
Geotextile Fabric (10 SQYD)
End Section 36" RCP (2 EA)
Cross Road Pipe 36" RCP (32 LNFT)
Common Excavation (50 CUYD)
Estimated Materials Include the Following:
Fill and Re-grade
Install Geotextile w/Riprap LT. &RT.
Sections LT.&RT.
Install 16' Ext. LT.&RT. to Existing 36" RCP w/End
Remove Existing 10' CMP Ext.
{ Vinton Sta. 228+64.50
225+00 230+00
Range 18
235+00
235+00
{ Vinton School Rd.
N=293993.63 E=1666951.45
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Geosynthetic Reinforcement (For Base) (80 SQYD) HMA Commerical Grade (Class A)(Patching)(7") (40 SQYD) HMA Commerical Grade (Class A)(2") (40 SQYD) Emulsified Asphalt (80 SQYD)
Aggregate Base (Special)(RAP)(6")(Install Only) (40 SQYD) Rock Excavation (14 CUYD)
Estimated Materials Include the Following:
Replace w/Full Depth Patch
Remove Existing 15'X24' Concrete Tank Crossing { Vinton Sta. 239+28.00
235+00
Path
Tank Path
250+00
250+00 in to n
S c h o o l R d
N=293303.84 E=1666994.13
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Geotextile Fabric (80 SQYD) Geosynthetic Reinforcement (For Base) (160 SQYD) Early High Strength Pavement (12" Uniform)(AE)(NRDJ) (80 SQYD) Drainable Base (Unbound)(4") (80 SQYD) Rock Excavation (33 CUYD) Estimated Materials Include the Following:
for Std. Spec. 501.4i(3), See Detail Sheet Install 24'X30' Concrete Tank Crossing, Perform Flex ural Tests KT-23 Remove Existing 20'X44' Concrete Tank Crossing { Vinton Sta. 245+88
6in
6in
6in
6in
250+00 255+00
250+00 255+00
3:1 3:1
Std. Ditch
5'
11'
{ Vinton School Rd.
N=293236.05 E=1667620.66
N=293194.06 E=1667620.12
N=293157.06 E=1667619.35
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Seed (632 SQFT)
Erosion Control (Class 2)(Type G) (56 SQYD)
Estimated Materials Include the Following:
See KDOT Std. Sht. LA856
See Std. Ditch
Fill and Regrade 5' Ditch w/3:1 Slopes
Clear & Grub - Trees up to 6" Diameter (1350 SQFT)
Clear & Grub - Tree removal, Trees Larger than 6" Diameter (5 EA) Slope Protection (Riprap Stone) (7 CUYD)
Geotextile Fabric (10 SQYD)
End Section 36" RCP (2 EA)
Cross Road Pipe 36" RCP (32 LNFT)
Common Excavation (50 CUYD)
Estimated Materials Include the Following:
Fill and Re-grade
Brush & Tree Removal
Install Geotextile w/Riprap LT.&RT.
Install 16' Ext. LT.&RT. to Existing 36" RCP w/End Sections LT.&RT.
Remove Existing 36"X8' RCP RT.
{ Vinton Sta. 252+62.50
255+00
9in
9in 9in
265+00 270+00265+00 270+00
N=293209.09 E=1668832.87
3:1 3:1
Std. Ditch
5'
11'
N=293167.87 E=1668818.84
N=293244.85 E=1668844.03
{ Vinton School Rd.
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Seed (632 SQFT)
Erosion Control (Type 2)(Type G) (56 SQYD)
Estimated Materials Include the Following:
See KDOT Std. Sht. LA856
See Std. Ditch
Fill and Re-grade 5' Ditch w/3:1 Slopes
Clear & Grub - Trees up to 6" Diameter (1570 SQFT)
Clear & Grub - Tree removal, Trees Larger than 6" Diameter (3 EA) Slope Protection (Riprap Stone) (7 CUYD)
Geotextile Fabric (11 SQYD)
End Section (35"X24")(4.5 SQFT)(CSMAP) (2 EA)
Cross Road Pipe (35"X24")(4.5 SQFT)(CSMAP) (32 LNFT)
Common Excavation (50 CUYD)
Estimated Material Include the Following:
Brush & Tree Removal
Fill and Re-grade
Install Geotextile w/Riprap LT.&RT.
Install 16' Ext. LT.&RT. to Existing 35"X24" CMAP
{ Vinton Sta. 264+82
265+00 270+00
12in 12in
Path
K n o w n
R if le
R a n g e
275+00 280+00275+00 280+00
N=293213.72 E=1670059.24
N=293214.67 E=1670499.37
{ Vinton School Rd. { Vinton School Rd. { Vinton School Rd.
N=293255.98 E=1670057.41
N=293175.04 E=1670060.55
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Geotextile Fabric (80 SQYD)
Geosynthetic Reinforcement (For Base) (160 SQYD) Early High Strength Concrete Pavement (12" Uniform)(AE)(NRDJ) (80 SQYD) Drainable Base (Unbound)(4") (80 SQYD)
Rock Excavation (30 CUYD)
Estimated Materials Include the Following:
for Std. Spec. 501.4i(3), See Detail Sheet
Install 24'X30' Concrete Tank Crossing, Perform Flexural Tests KT-23 Remove Existing 44'X21' Concrete Tank Crossing { Vinton Sta. 280+48.00
Clear & Grub - Trees up to 6" Diameter (400 SQFT)
Clear & Grub - Tree removal, Trees Larger than 6" Diameter (2 EA) Slope Protection (Riprap Stone) (7 CUYD)
Geotextile Fabric (10 SQYD)
End Section (35"X24")(4.5 SQFT)(CSMAP) (2 EA)
Cross Road Pipe (35"X24")(4.5SQFT)(CSMAP) (32 LNFT)
Common Excavation (50 CUYD)
Estimated Materials Include the Following:
Fill and Re-grade
Brush & Tree Removal
Install Geotextile w/Riprap LT.&RT.
LT.&RT.
Install 16' Ext. LT.&RT. to Existing 35"X24" CMAP w/End Sections { Vinton Sta. 277+08.00
275+00 280+00
12in
T a n k
P a th
295+00 300+00295+00 300+00
N=293227.26 E=1672219.57
{ Vinton School Rd. { Vinton School Rd.
N=293266.21 E=1672216.57
N=293185.39 E=1672221.91
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Clear & Grub - Trees up to 6" Diameter (400 SQFT) Clear & Grub - Tree removal, Trees Larger than 6" Diameter (1 EA) Slope Protection (Riprap Stone) (7 CUYD)
Geotextile Fabric (10 SQYD)
End Section 36" RCP (2 EA)
Cross Road Pipe 36" RCP (32 LNFT)
Common Excavation (50 CUYD)
Estimated Materials Include the Following:
Fill and Re-grade
Install Geotextile w/Riprap LT.&RT.
Brush & Tree Removal
Install 16' Ext. LT.&RT. to Existing 36" RCP w/End Sections LT.&RT.
{ Vinton Sta. 289+68
295+00 300+00
Tank Path
325+00325+00 { Vinton School Rd.
N=293267.68 E=1675137.44
N=293207.68 E=1675137.44
N=293237.68 E=1675137.44
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
PLAN
VINTON SCHOOL RD
Clear & Grub - Trees up to 6" Diameter (340 SQFT)
Flowable Fill (Low Strength) (62 CUYD)
Slope Protection (Riprap Stone) (7 CUYD)
Geotextile Fabric (10 SQYD)
End Section 36" RC (2 EA)
Cross Road Pipe 36" RCP (60 LNFT)
Geosynthetic Reinforcement (For Base) (16 SQYD)
HMA Commerical Grade (Class A)(Patching)(7") (8 SQYD)
HMA Commerical Grade (Class A)(2") (8 SQYD)
Emulsified Asphalt (16 SQYD)
Aggregate Base (Special)(RAP)(6")(Install Only) (8 SQYD)
Rock Excavation (2 CUYD)
Common Excavation (50 CUYD)
Estimated Materials Include the Following:
Fill and Re-grade
Install Geotextile w/Riprap LT.&RT.
See RCB & RCP Typical Section
Install 36"X60' RCP w/End Sections LT.&RT.
Remove Existing 36"X24' CMP & 36"X16' RCP
{ Vinton Sta. 327+86.00
325+00
2% 2%
6:1 6:1
4% 4%
3:1 3:1
Proposed
NTS
Sta. 31+89.00
Proposed
NTS
Sta. 85+50.00 29.5' Lt.
36" X 64' RCP @ 1.2%
36" X 64' RCP @ 1.0%
Sta. 85+75.00 29.5' Rt.
Sta. 31+89.00 32' Lt. Sta. 31+89.00 32' Rt.
Sta. 85+63.00
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
RCP TYPICAL SECTION
N=293090.39 E=1652500.84
N=293031.00 E=1652524.68
N=293062.91 E=1647138.74 N=292998.91
E=1647138.74
FL 4'10" From Top of Exist. Crown FL 5'7" From Top of Exist. Crown
FL=1250.84'
FL=1251.51'
Field Verify FL ElevationsField Verify FL Elevations Field Verify FL Elevations
Field Verify FL Elevations
Field Verify FL Elevations
Proposed
2% 2%
6:1 6:1
4% 4%
Proposed
3:1
Sta. 209+90.00
Sta. 327+86.00
36" X 60' RCP @ 2.5%
NTS
Embedded = 1'
NTS
3:1
Sta. 209+99.50 28.7' Lt. Sta. 209+81.00 28.7' Rt.
Sta. 327+86.00 30 Lt.
Sta. 327+86.00 30 Rt.
KANSAS DEPARTMENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
R E
F E
R E
N C
T E
D
R E
F E
R E
N C
E C
K E
D
B Y
D A
T E
RCB & RCP TYPICAL SECTION
N=294107.44 E=1664076.94
N=294050.42 E=1664058.26
N=293267.68 E=1675137.44 N=293207.68
E=1675137.44
7' X 7' X 60' RCB @ 3%
FL 8' From Top of Exist. Crown
FL 6.5' From Top of Exist. Crown
Field Verify FL Elevations Field Verify FL Elevations
Field Verify FL Elevations
Field Verify FL Elevations
FL 9.5' From Top of Exist. Crown Crown
FL 11.5' From Top of Exist.
0+00
5+00
KANSAS DEPARTM ENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n
B y
U
S E
R N
A M
E
P lo tt e d
S
Y T
IM
E
R E
F E
R E
N C
E S
N O
T E
D
R E
F E
R E
N C
E S
C H
E C
K E
D
B Y
D A
T E
PLAN
CAMPBELL HILL RD
{ Campbe ll H ill R d.
Emulsified Asphalt (32166 SQYD)
PVMT Marking (Yellow)(4") (24100 LNFT)
PVMT Marking (White)(4") (24100 LNFT)
HMA Commerical Grade (Class A) (6120 TONS)
Aggregate Shoulder (Millings)(Install Only)(4") (5356 SQYD)
Common Excavation (1000 CUYD)
Estimated Materials Include the Following:
See Typical Section Sheet
Const. Overlay w/2' Millings Shoulder
{ Campbell Sta. 0+00 to 120+49
L a n d f ill
Tank Path
80+00
85+00
90+00
N=289929.85 E=1668942.52
KANSAS DEPARTM ENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D
G N
S P
E C
F il e
D ra w n B y
U
S E
R N
A M
E
P lo tt e d
S
Y T
IM
E
R E
F E
R E
N C
E S
N O
T E
D
R E
F E
R E
N C
E S
C H
E C
K E
D
B Y
D A
T E
PLAN
CAMPBELL HILL RD
{ Campbell Hill Rd.
{ Campbell Hill Rd.
Geotextile Fabric (80 SQYD)
Geosynthetic Reinforcement (For Base) (160 SQYD)
Early Strength Concrete Pavement (12" Uniform)(AE)(NRDJ) (80 SQYD)
Drainable Base (Unbound) (4") (80 SQYD)
Rock Excavation (26 CUYD)
Estimated Materials Include the Following:
for Std. Spec. 501.4i(3), See Detail Sheet
Install 24'X30' Concrete Tank Crossing, Perform Flexural Tests KT-23
Remove Existing 34'X24' Concrete Tank Crossing
{ Campbell Sta. 84+85
T n k
P a th
T a n k
P a th
+00
120+00
V in to n
S c h o o l R d
{ Campbell Hill Rd.
{ Campbell Hill Rd.
KANSAS DEPARTM ENT OF TRANSPORTATION
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n
B y
U
S E
R N
A M
E
P lo tt e d
S
Y T
IM
E
R E
F E
R E
N C
E S
N O
T E
D
R E
F E
R E
N C
E S
C H
E C
K E
D
B Y
D A
T E
PLAN
CAMPBELL HILL RD
N=292941.92 E=1668321.99
Geotextile Fabric (80 SQYD) Geosynthetic Reinforcement (For Base) (160 SQYD) Early High Strength Concrete Pavement (12" Uniform) (AE) (NRDJ) (80 SQYD) Drainable Base (Unbound) (4) (80 SQYD) Rock Excavation (27 CUYD) Estimated Materials Include the Following:
for Std. Spec. 501.4i(3), See Detail Sheet Install 24'X30' Concrete Tank Crossing, Perform Flexural Tests KT-23 Remove Existing 20'X36' Concrete Tank Crossing { Campbell Sta. 179+95
A tack coat of SS-1HP shall be provided between each lift of all base courses and
1 1 8-30-06 calculated at the rate of 0.06 gal. /sq. yd.
Changed tack type/rate
Asphalt Material quantities are calculated on the basis of 8.328 lbs. per gal.
On projects which specify both asphalt base and surface course materials, placed on an existing asphalt, brick, or concrete surface, when so ordered by the
1 2 1-10-07 Changed bituminous to asphalt
Approx.
20'
Approx.
20' 50'50' W
W
2+ 21'+ 21'
Var.
Slope
Varies
:1
V a r
S lo p e
V a r
S lo p e
N o r m a l S id e
N o r m a l S id e
R o a d
S lo p e
R o a d
S lo p e
' 25
R .R
28'
24'
"W" for Side Roads for Entrances
Surfaced Roadbed
M.B. Turnout
Shoulder Line
110'
15' 15'40' 40'
"D
"D
Base or Surface
Course
"L"
N o r m a l
S lo p e
N o r m a l
S lo p e o r
E n tr a n c e
R/W
Typical drainage structure
Ditch
Edge of Surface
Shoulder Line
Edge of Surface
Rad. Pt. 32.69' E.P.
Variable slope approx.
50' or as available.
Variable slope approx.
50' or as available.
Thickness as shown in
General Note.
Direction of Traffic Edge of Surfacing
Shoulder Line Mail Box
Existing Profile
WITH DRAINAGE STRUCTURE MOUND ENTRANCE OR SIDE ROAD
DETAIL FOR SURFACING OF SIDE ROADS
& HOUSE ENTRANCES
SECTION A-A
DETAIL FOR SURFACING OF MAIL BOX TURNOUTS
TYPICAL PROFILE AT GRADE CONTROL POINTS
Normal Slope (but not steeper than
8:1 Slope at the appropriate clear
Computed at the rate of
Computed at the rate of
Note: The face of Mail Box should be no closer to
Width shall be 8' or shoulder width, whichever is greater.
zone shall apply to all mound entrances and mound side roads to 10' fill height.
Normal Slope (but not steeper than 6:1) for over 10' fill height.
appropriate clear zone width.
the roadway than the edge of the shoulder.
Align with edge of turnout when turnout width is greater than shoulder width.
A
A material as directed by the Engineer. The removal of this material will be subsidiary.
The material used to backfill over the structure shall be at least to the to the limits shown on the detail.
GENERAL NOTE:
Over all structures, unless otherwise directed by the Engineer, where the top of the hubguard is level with or above the finished shoulder grade, the earth cover over the structure slab shall be removed and backfilled with paid for at the prices shown in the contract.
to the R/W line as indicated on the detail. All side roads and house entrances with existing asphalt surface shall be surfaced with
R/W line or to the end of construction, as directed by the Engineer. Each mailbox turnout (ON PROJECTS WHERE STABILIZED SHOULDERS ARE NOT SPECIFIED) shall be surfaced with
Surfacing material (SA- ) shall be used for surfacing house entrances and side roads ( C.Y./SQ. YD.) beyond the limits of the asphalt surface to the limits of construction as determined by the Engineer.
same thickness as the stabilized shoulder within the approximate limits of the shoulder.
side roads, house entrances and mailbox turnouts may be surfaced with both materials at the contractors option, with the approval of the Engineer.
lbs. per cu. ft. Quantities for stabilized base course, AB-3, are calculated on the basis of 1 56 lbs. per cu. ft. Weight/cu. ft. includes moisture allowed by specification.
Thicknesses indicated for all construction which is paid for on a weight or volume basis are approximate and may vary to correct for unevenness in the foundations or for other normal unevenness encountered in placement operations.
surface courses and under the first lift of base or surface courses when they are
Engineer and at the rate designated by him. Quantities are included for these tacks ordered by the Engineer, the top 3'' shall be left uncompacted for seeding.
The Contractor shall cut the subgrade in accordance with this profile at all grade control points, i.e. ; existing pavements, grade bridges and
R.R. crossings, also at changes in thickness of base or surface courses.
The work of cutting the subgrade and disposing of excess excavated material shall be subsidiary to other items in the contract.
The base course shall be constructed to the plan thickness as shown.
All side roads and house entrances shall be surfaced with
The thickness of side road and entrance surfacing may be increased to the
Quantities for aggregate for shoulders, AS-1, are calculated on the basis of 1 50
Corresponding dimensions of "D" and "L" shall be as given in the table below.
On surfacing projects, the 6'' of Compaction Type AA, shown for the center portion on the roadbed, is for the purpose of restoring the original Compaction Type AA which may have been lost since grading operations. The exact locations of this Compaction
Type AA, which will be required, is to be determined by the Engineer at the time of con-
(MR- )".
struction. This work shall be paid under the bid item "Compaction of Earthwork (Type AA)
Shoulder rumble strips will not be constructed as part of this project.
The earth shoulders shall be compacted full depth (Type -MR ) except, when
TABLE OF DIMENSIONS
RATES OF APPLICATION
SUMMARY OF QUANTITIES
RECAPITULATION OF QUANTITIES
D D D D D DL L L L L L
1''
2''
25'
50'
3''
4''
75'
100'
5''
6''
125'
150'
7''
8''
175'
200'
225'
250'
11''
12''
275'
300'
RATE UNIT ITEM ITEM TOTAL UNIT
ITEM
9''
10''
SUMMARY OF QUANTITIES
(Surfacing)
On side roads and entrances which slope toward the highway, a low point approx. 6" deep shall be constructed to divert surface drainage into the high-way ditch, the plans.
unless otherwise shown on
9 6-12-02 S.W.K. J.O.B.Added low point off shoulder.
S.W.K. J.O.B.10 3-24-05 Revised compaction, tack type/rate
S.W.K. J.O.B.
S.W.K. J.O.B.
ì ì
S id e
R o a d ì Project
6:1) at approximate ì Structure or ì Project
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
rd .d g n
F il e
D ra w n B y tr h o a d s
P lo tt e d -O
C T -2
:4
DATE REVISIONS BY APP'DNO.
FHWA APPROVAL 9-06-06
DESIGNED
DETAILED
DESIGN CK. DETAIL CK. QUAN.CK.
RD051
TRACED Bowser
TRACE CK. Hecht
APP'D. James O. Brewer
K D
O T G r a p h ic s C e r ti fi e
KDOT Graphics Certified 10-21-2015
1.
2.
3.
Measurement for the bid item, "Granular Backfill (Wingwalls)", Material for Granular Backfill (Wingwalls) shall conform to
See wingwall detail sheet for drain spacing.
shall be measured in Cubic Yards to the theoretical limits
Seal Course consisting of 3" min. of Commercial Grade Concrete shall be constructed to the limits directed by the Engineer.
No reinforcing in the floor of the slab or wall footing shall be placed until the Seal Course has gained sufficient strength to permit working upon it without injury.
2.
1.
Construction and materials for wingwall drainage, including corrugated polyethylene tubing.
1.
Form front face & back face of ftg.
6" - 12" as needed.
Fini shed
Gr ound
Lin e
3'-0"c c
3" Seal Course to be
'-0
Granular Material
3'-0"4'-0"
Wing Details.
as shown on
Space weepholes
2'-0"
2'-0"
L 4" ô Drain
Embankment required
(subsidiary to Grade 4.0 Conc.)
3•:1
:1
Slop eVaries
Toe of Embankment
Extend filter fabric backing weephole
Strip Drain
C
C
1'-6"
1'-6"
11"
Strip Drain (Extend to top
Extend filter fabric backing
Existing
Groundline for application.
and lap a minimum of 4".
Wrap all sides and ends.
used only where specified.
Horizontal wingwall drainage required on all wings with of footing). Cut 4" square hole in plastic core at top of footing) and lap a minimum of 4".
Wrap all sides and ends.
b r .d g à for RCB's or at the top of the fillet for RFB's
2'-0"2'-0"
Min. Splice length
(See Table-RCB details sheet)
W1 Bars (or W4 Bars)
2" Clear
Dowel bars to match size and spacing of W1 Bars (or W4 Bars)
Skew Angle
Skew Angle
Long Wing
Long Wing
Long Wing
Long Wing
L Roadwayc
L Roadwayc
Short Wing
Short Wing
Short Wing
Short Wing
1•"
T
"A" = (T-3•") - 2
1" Min.
clr.
Foundation
Stabilization n s t.
J t.
n s t.
J t.
Vertical construction joints shall be perpendicular to the longitudinal axis of the RCB and shall be placed at any location as needed for construction and as approved by the Engineer.
a roughened finish.
See RCB Details Sh. for required splice length.
The Contractor shall have the option of using Dowel Bars to match vertical wall bars as shown, however no allowance will be made for additional steel required for bar laps.
Longitudinal bars shall extend through the joint to provide a minimum lap equal to the required splice length.
Barrel Construction Joints located in a median with less than 5 ft. of fill or at locations specified by the Engineer, shall be protected by a bentonite based system as shown. Place the bentonite on the exterior walls and top slab. See requirements for bentonite in the KDOT
Specifications for "Bridge Backwall Pro-tection System". Material and installation of the bentonite system shall be subsidiary to the bid item "Grade 4.0 Concrete".
The Contractor has the option of placing the Lower
Horizontal Construction Joint at the top of the slab
PLAN VIEW SKEWED R.C.B.
VERTICAL CONSTRUCTION JOINTS
OPTIONAL COLD JOINT
OPTIONAL BAR DETAIL
"A
"A
6"6"Earth Side Bentonite
WINGWALL PLAN
ELEVATION
GENERAL NOTES
GENERAL NOTES
RCB
Foundation Stabilization
The depth of Foundation Stabilization may be increased by the
Engineer. The Contractor may underrun Foundation
Stabilization under the barrel if founded on firm material and with the Engineer's approval. Use Foundation Stabilization on all wingwalls unless founded on rock or granular material.
See General Notes
The Foundation Stabilization quantity has been calculated to the limits shown in the Section Thru Wingwall. The depth may be increased by the Engineer. Use Foundation Stabilization on all wingwalls unless founded on rock or granular material.
Varies (6" Min.)
See KDOT
Specifications
Varies (6" Min.)
See KDOT
Specifications
Change Type 'C' Compaction to 'B'
Right Skew
Left Skew
Backfill material
Limits of Granular
Strip Drain
(Strip Drain) weepholes (Strip Drain) as shown.
SECTION C-C
Strip Drain
Backfill
Granular
Limits of
SECTIONPARTIAL
ELEVATION
PARTIAL SECTION RCB
PARTIAL SECTION RFB
ì of weepholes in plastic core
Cut 4" square hole
(Back Face of Wall)
Top of Wing
Strip Drain Strip Drain
Granular Backfill And
Foundation Stabilization
NOTE:NOTE:
NOTE: Horizontal construction joints shall be
VERTICAL STRIP DRAIN
Granular Backfill
1‚ +-ì of weepholes
Wingwall Drainage:
Wingwall Foundation Stabilization:
Seal Course:
Granular Backfill (Wingwalls):
Foundation Stabilization:
Avoid over consolidation.
Consolidate Granular Backfill using hand equipment only. 4.
Modified Backfill Details
" ô rain ô
All wingwalls with weepholes shall have horizontal and vertical wingwall drainage as shown. Strip drains will be used.
strip drain requirements.
See KDOT Specifications for "Abutment Strip Drains" for weepholes, and strip…